Ambitions to achieve carbon neutrality are needed in all nations to limit global warming to below 2 °C in the Paris Agreement8,9. Accelerating the penetration of renewables is a key pillar in climate mitigation10. Global decarbonization is not, however, progressing as fast as it should to meet the goals of the Paris Agreement11,12,13. The world is probably on track for 2.8 °C of warming at the end of this century on the basis of current policies11. To achieve the global transition towards low-C economies, the 27th Conference of the Parties to the United Nations Framework Convention on Climate Change (COP27) recommended annual investments of US$4–6 trillion (all currency values throughout the paper are in US dollars) to accelerate the penetration of renewables14. However, details on how these funds should be allocated among renewables remain unclear1,6, requiring advanced spatially explicit models to optimize the existing power systems with geospatial details and coordinating infrastructure8,15.

The rapid increase in global carbon dioxide (CO2) emissions since 2000 has been driven mainly by the growing energy demand in developing countries8. Decarbonization may be more challenging in developing than developed countries16, but mitigation in developing countries is indispensable for meeting the climate goals8,9,10. China, with 18% of the global population and 28% of the global CO2 emissions, has recently strengthened its nationally determined contribution with carbon neutrality target by 2060 (ref. 2). Among renewables, PV and wind power have wider ranges of application than hydropower6, generate less detrimental effects on food and ecosystems than bioenergy17 and probably entail lower costs than carbon capture and storage (CCS)18. Achieving carbon neutrality requires scaling up PV and wind power from 1 to 10–15 PWh year−1 during 2020–2060 in China1,2,3,4,5,19. This capacity, however, would only reach 5 PWh year−1 assuming the annual growth rate of 100 TWh year−1 from 2010–2020 (ref. 1) or 9 PWh year−1 using forecasts by the governmental plans of CFED7 or 9.5 PWh year−1 based on a recent high-resolution energy-system model6. There is also a chance that the growth of PV and wind power in China slows down owing to decreasing governmental subsides20, a lack of transmission infrastructure6 and restrictions for protecting agricultural, industrial and urban lands21.

A spatially explicit method is needed for performing an optimization of energy systems by coordinating the generation of power with transmission and consumption of electricity in a country as vast as China22. Methods accounting for the spatial heterogeneity of PV and wind resources and demand for electricity transmission and storage have been developed for Europe23 and the USA24, but the flexibility of power load25 and intertemporal dynamics of learning26 have rarely been addressed in studies for China6,27,28,29. In contrast to previous studies2,6,27,28,29, we developed a unified optimization framework that accounts for the geospatial capacities of installing new PV panels and wind turbines, expansion of existing UHV transmission, storing energy, flexible power loads and dynamics of learning. Our research highlights the need for investments in upgrading power systems and infrastructure, as well as the co-benefits of increasing resident incomes.

Optimization of PV and wind power systems

We optimized the location, capacity and construction time of new PV and wind power plants each decade during 2021–2060 by minimizing the levelized cost of electricity (LCOE)6,27 (Extended Data Fig. 1). The LCOE is defined as the normalized present value of costs including initial investment, operation and maintenance (O&M), land acquisition, UHV transmission and energy storage that are divided by the power generated over the lifetime (25 years (ref. 30)) of power plants (see Methods). We optimized the number of pixels receiving new PV panels or wind turbines to minimize the LCOE (Extended Data Fig. 2). We identified respectively 2,767, 1,066 and 11 power plants of PV, onshore wind and offshore wind at the utility scale (>10 MW) by considering resource limitations, administrative boundaries, land suitability, restriction of land use, ground slope, land cover, latitude, longitude, terrestrial and marine ecological conservation, water depth at offshore wind stations, shipping routes, solar irradiance, wind power density and air temperature (Fig. 1a,b). The predicted location and capacity of power plants match the observed PV and wind power plants to some extent31 (Extended Data Fig. 3).

Fig. 1: Optimization of the location, capacity and construction time of utility-scale PV and wind power plants during 2021–2060 in China.
figure 1

a,b, Maps of PV (a) and wind (b) power plants built by decade in the optimal path. The background shows global horizontal irradiance (GHI) and wind power density (WPD). c, Seasonal and diurnal variations in the generation and demand of power under an electrification rate of 58% for non-power sectors in 2060. The shading represents the PV and wind power generation without considering curtailments. In a baseline scenario, the capacity of individual PV and wind power plants is limited to 10 GW without electricity transmission and energy storage, whereas the growth rate of PV and wind power is constant during 2021–2060 without considering the dynamics of learning. We design five experiments by sequentially increasing the limit of power capacity from 10 to 100 GW (case A), building new UHV lines (case B), storing energy (case C), improving the electrification of non-power sectors (case D) and considering flexibility of power loads (case E). Case E becomes equivalent to our optimal path if the construction time of power plants is optimized by accounting for the dynamics of learning. d, Power-use efficiency defined as the fraction of the generated power consumed by end users. e, Influences of increasing the capacity of new PV and wind power plants built in the 2020s on the LCOE of all new PV and wind power plants built during 2021–2060. The optimal path minimizes the LCOE by optimizing the construction time of individual power plants (shaded area) under a discounting rate of 5%. The inset shows the annual costs by decade. We consider a ‘CFED path’ by following the rate of installing renewables in China’s 14th Five-year Energy Development (CFED)7 with the projected costs of PV and wind power1. f, Dependency of the annual average costs of deploying PV and wind power during 2021–2060 on the power capacity of new PV and wind power plants built during 2021–2060 under different scenarios.

We identified diurnal variabilities and seasonal patterns of PV and wind power generation, which are not in phase with the profile of power demand (Fig. 1c). The power generation peaks in spring owing to variations in surface air temperature, shade, solar angle and inclination of PV panels (Extended Data Fig. 4). Our model considers the flexibility of power load whereby end users adjust hourly power demand to match the supply except for heating and cooling of houses and electric cars25 (that is, 12% in total power demand by 2060) (see Methods). The adjusted power demand shifts in the daytime to match the peak of PV and wind power generation (Fig. 1c). Expanding the capacity of transmission by 6.4 TW and building new energy storage of 1.3 TW in China improves the efficiency of power use (Fig. 1d), whereas adopting a lower rate of electrification or considering a higher capacity of other types of renewable reduces the efficiency (Extended Data Fig. 5).

Similar to a previous study32, we estimated that the rate of learning in China during 2000–2020 could be higher than the rate measured in other regions during 1975–2020 (Supplementary Table 1). On this basis, optimizing the construction time of power plants reduces the LCOE of PV and wind power plants from $0.067 to $0.046 per kWh (Fig. 1e). This requires an increase in PV and wind investment from $127 billion year−1 in the 2020s to $426 billion year−1 in the 2050s. This investment profile is similar to CFED1,7 for the 2020s and 2030s but is lower in the 2040s and 2050s. Investment in our optimal path over the period 2031–2050 ($220 billion year−1) is lower than a previous estimate6 ($320 billion year−1) made without simulating the dynamics of learning.

We quantified the effects of optimization relative to a baseline scenario, which limits the capacity of PV and wind power plants to 10 GW without electricity transmission and energy storage and assumes that the growth rate of PV and wind power is constant during 2021–2060 without optimizing the dynamics of learning26. We designed five sensitivity experiments by sequentially increasing the limit of capacity for individual plants from 10 to 100 GW (case A), considering the construction of new UHV lines (case B), adding energy storage (case C), improving electrification of non-power sectors33 from 0 to 58% (case D) and considering flexible power loads (case E). Case E becomes equivalent to our optimal path if the construction time of power plants is optimized through accounting for the dynamics of learning26. Our optimal path increases the capacity the most by storing energy (+6.4 PWh year−1 as a difference between cases B and C), but it reduces the costs the most by optimizing the dynamics of learning (−$115 billion year−1 as a difference between case E and the optimal path) (Fig. 1f).

Costs of CO2 emissions reduction

We estimated the marginal abatement cost (MAC) at the plant level, which varies from −$166 per tCO2 to $106 per tCO2 in 2060 in our optimal path (Fig. 2a). For example, 77% of PV and wind power could be competitive against nuclear power with a lower MAC1. The average abatement cost (−$4.5 per tCO2) for 9.5 PWh of power generation is lower than a previous estimate ($27 per tCO2) under an 80% renewable penetration in China6. The MAC increases as the capacity rises owing to techno-economic limits and differences in the prices of the substituted fossil fuel (Extended Data Fig. 6). Such behaviour of the MAC indicates an increase in the costs to install higher capacities of PV and wind power34, even by considering the benefits of technological improvements26.

Fig. 2: Costs of CO2 emissions abatement in 2060 by deploying PV and wind power in China.
figure 2

a, The MAC under a 5% discounting rate in 2060. The configurations of the baseline case, cases A–E, the CFED case and our optimal path are identical to those defined in Fig. 1. Arrows represent the MACs for hydropower, nuclear power, hydrogen energy, carbon capture utilization and storage (CCUS) and direct air carbon capture and storage (DACCS)1. b, Impacts of our optimizing procedures on the potential of CO2 emissions reduction based on the ranges of MAC. c, Violin plots of the average abatement costs when building new PV and wind power plants to meet the power demand in 2060. We perform sensitivity experiments by applying international learning rates (Supplementary Table 1) (I), adopting low36 (II) or high35 (III) capital costs, neglecting the costs of building new UHV lines (IV), adopting a high discounting rate (7%)6 (V) and assuming a short lifetime (20 years) of power plants30 (VI). d, Composition of the costs and income when increasing PV and wind power generation from 1 to 10 PWh year−1 to replace fossil fuel in 2060.

The capacity of PV and wind power reaches 15 PWh in 2060 (9 PWh in the CFED plan7) with an average abatement cost of $6 per tCO2 ($97 per tCO2 in the CFED plan1) (Fig. 2b,c). The CO2 emissions were most abated by storing energy (+3.5 Gt CO2) for power plants with MAC < $100 per tCO2 and by optimizing the dynamics of learning (+3.5 Gt CO2) for power plants with MAC < $0 per tCO2. The costs of PV and wind power would increase if we assumed international learning rates (Supplementary Table 1), high capital costs35, a short lifetime of power plants (20 years)30 or a high discounting rate (7%)6, but decrease if we neglected the costs of new UHV lines or adopted low capital costs36. For example, the average abatement cost increased from −$2 to $14 per tCO2 if we increased the discounting rate from 3% to 7% to reduce the revenue from power generation, but it decreased from $22 to $0 per tCO2 if we increased the lifetime of power plants from 15 to 35 years (Supplementary Fig. 1). The cost composition shifted from transformers and O&M to modules and land acquisition as we moved from the baseline case to the optimal path (Fig. 2d). A recent study showed that globalized supply chain reduces global solar-module prices32. Our results indicate that the impact of technological transformation between countries might be moderate for China with a fast decline in module prices (Supplementary Fig. 2).

Trade-offs among land, costs and power

We analysed the trade-offs among land requirements, costs and power capacity (Table 1). The capacity of PV and wind power could provide up to 59% of the projected total power demand in China for 2060, compared with a contribution of 20% by hydrogen, nuclear and biomass in a scenario keeping global warming below 1.5 °C by ref. 2. Expansion of PV and wind power from 1 to 15 PWh year−1 requires 585,000 km2 of land for placing PV panels and 672,000 km2 of area for installing onshore and offshore wind turbines, in which 33%, 35%, 16% and 6% of facilities are distributed in deserts, grassland, oceans and cropland, respectively (Extended Data Table 1). Building these PV and wind power plants requires initial investment of $201 billion year−1 with O&M costs of $47 billion year−1, the sum of which is 7% of the total spending of China’s public finances37 in 2020. These costs can partly offset the income by saving costs of purchasing fossil fuels ($223 billion year−1) and reducing carbon costs ($399 billion year−1) by assuming a representative carbon price of $100 per tCO2 from the 1.5 °C scenario by ref. 2.

Table 1 Capacity, land acquisition and annual costs of new PV and wind power plants built during 2021–2060 under a discounting rate of 5%

We predicted that 183 of 3,844 plants will be built with capacity >10 GW. The average abatement cost will decrease from $62 to $6 per tCO2 as the limit of capacity for individual plants increases from 0.1 to 10 GW (Extended Data Fig. 7). The feasibility of building large power plants in China could be supported by commissions of the Jiuquan onshore wind power plant at 20 GW and the Yanchi PV power plant at 1 GW, but it entails high requirements on grid integration, electricity transmission and initial investment38. Non-economic factors such as ecological preservation, engineering feasibility and political impediment deserve attention.

Implication for carbon neutrality

Many scenarios meeting the target of carbon neutrality8 rely on retrofitting existing plants with CCS, which may be limited by economic costs1, geological constraints39 and biomass availability17. We analysed the impact of deploying PV and wind power on the demand for CCS with fossil fuel2 or bioenergy17 to achieve carbon neutrality in 2060 by considering terrestrial carbon sinks, electrification of non-power sectors (58%)33 and power supply by other renewables2 (Fig. 3). A transition from CFED7 to our optimal path reduces the demand for CCS from 8.9 to 2.8 PWh year−1 in 2060 (Fig. 3a). The share of PV and wind in power supply increases from 12% to 59% during 2021–2060 at an annual rate of 1.8%, 1.4%, 1.0% and 0.7% in the 2020s, 2030s, 2040s and 2050s, respectively, which requires acceleration relative to an annual rate of 1% for China in the 2010s40. Although the projected annual growth rates for wind (1%) and PV (0.8%) in China during the 2020s are comparable with the maximal annual rates of 1% in Spain, 0.9% in Turkey and 0.6% in the USA and New Zealand for wind or 1.1% in Japan and 1% in Germany for PV13, the expansion of these technologies may present greater challenges in China because of her larger absolute power demand1.

Fig. 3: Different paths to achieve carbon neutrality in China by 2060.
figure 3

a, Composition of the generated power by decade. The projected generation of power by oil, gas, bioenergy, nuclear power and hydropower are derived from the ‘1.5-°C-limiting’ scenario in a multi-model study2. The PV and wind power are projected by our optimal path and CFED7. Assuming that coal meets the remaining power demand, we estimate the demand for CCS installed with fossil fuel or biomass when achieving carbon neutrality in 2060. b, Dependence of the annual costs of PV, wind and CCS when achieving carbon neutrality by 2060 on the costs of transmitting electricity by UHV lines during 2021–2060 in the optimal path. c, Dependence of the annual costs of PV, wind and CCS when achieving carbon neutrality by 2060 on the costs of PV and wind power during 2021–2060 in our optimal (dashed lines) path and CFED7 (solid lines). In b, the total capacity of PV and wind power plants built during 2021–2060 in the optimal path depends on the capacity of electricity transmission, whereas the total distance of new UHV lines is indicated by the colour of the circle. The total capacity of PV and wind power built by 2060 in CFED7 depends on the annual growth rate of PV and wind power during 2021–2060, which is indicated by the colour of the circles in c. We predict the costs of CCS based on the MAC of CCS1 and the demand for CCS when achieving carbon neutrality by 2060 under different scenarios.

Upgrading power systems is crucial to accelerating the penetration of renewables in China7,27,28,29. For example, the growth of PV and wind power does not depend on investment in electricity transmission in CFED plans7 (Fig. 3c). By contrast, our model optimizes the dynamics of learning (Extended Data Fig. 8) and the strategy of energy storage (Extended Data Fig. 9) by accounting for investment in UHV lines (Fig. 3b). An example of the findings shows that, with the increase in PV and wind investment from $0 to $60 billion year−1 over the period 2021–2060, the ratio of cost reduction for PV, wind and CCS to the increase in costs for PV and wind power is 2.7:1 in the optimal path towards carbon neutrality in 2060, which is lower than the ratio of 6.4:1 in CFED plans7. This ratio increases to 5.4:1 in our optimal path when investment in PV and wind power systems increases from $60 to $250 billion year−1, but decreases to 0.4:1 in CFED plans7. Our results highlight the importance of ramping up PV and wind investment relative to current levels ($77 billion year−1 in 2020)41 to reduce the economic costs of achieving carbon neutrality.

Implication for alleviating poverty

Deploying renewables has been suggested as an effective way to reduce poverty42 by generating revenue from wealthier regions. This impact, however, has not been assessed by a national cost–benefit analysis in China. A higher carbon price generates more revenue for PV and wind power by saving more carbon costs (Fig. 4a). Accounting for the finances embodied in the transmission of electricity (see Methods), we found that the revenue from PV and wind power could be redistributed from the more developed east to the less developed west. Distributing the revenue to less-developed regions as the carbon price increases from $0 to $100 per tCO2 removes 21 million people from the low-income group (<$5,000 year−1) and adds 6 million people to the high-income group (>$20,000 year−1) (Fig. 4b,c).

Fig. 4: Co-benefits of deploying PV and wind power on poverty alleviation in China.
figure 4

a, Revenue from PV and wind power generation in 2060 under different carbon prices. b, Change in the distribution of per-capita income when the carbon price increases from $0 to $100 per tCO2. c, Change in the income of the 10% poorest people in 2060 owing to the deployment of PV and wind power during 2021–2060 under the carbon price of $100 per tCO2. d, Variation in the Gini coefficient when the carbon price increases from $0 to $100 per tCO2. The shaded area represents the 90% uncertainty in Monte Carlo simulations. e, Flow of finances embodied in the transmission of electricity generated by new PV and wind power plants built during 2021–2060 under the carbon price of $100 per tCO2. The insets show the variations in per-capita income by region when the carbon price increases from $0 to $100 per tCO2 in 2060.

Increasing the carbon price from $0 to $100 per tCO2 reduces income equality, with a decrease in the Gini coefficient from 0.453 to 0.441 (Fig. 4d). Adopting a carbon price of $100 per tCO2 generates a financial flow of $1,055 billion in the transmission of PV and wind power in 2060, which is 15-fold higher than China’s annual investment in poverty alleviation during 2014–2020 (ref. 37). The generation of PV and wind power is dominated by Northwest China (5.9 PWh year−1) and North China (5.2 PWh year−1), whereas the consumption is dominated by East China (5.7 PWh year−1) and Central China (4.3 PWh year−1). The transmission of electricity leads to the largest finance flow ($223 billion year−1) from East China to Northwest China (Fig. 4e). By increasing the carbon price from $0 to $100 per tCO2, deployment of PV and wind power benefits the poorest residents, with an increase in per-capita income from $29,000 to $34,400 in North China and from $29,100 to $30,600 in Northwest China.

Implication for climate policies

The gap between current decarbonization rates and the levels required to achieve carbon neutrality remains substantial8,9,10. China has been at the forefront of PV deployment since 2009 (ref. 27), accompanied by an accelerated growth of wind power1. Despite these accomplishments, it remains challenging to achieve carbon neutrality by 2060. As fossil fuels continue to dominate energy-related investments12, renewable growth could slow down as subsidies for companies generating PV and wind power decline20,21. Unlike previous studies1,2,6,27,28,29, our research reveals greater potential for PV and wind power generation in China, alongside the need for larger investment in power-system upgrades.

Our approach enhances the optimization of PV and wind power systems2,6,27,28,29 by applying a spatially explicit method that provides insights into climate mitigation in countries beyond China14. First, deeper decarbonization requires greater investments in renewables because of physical constraints in abating more CO2 emissions (for example, larger demand for land and infrastructure), even when accounting for technological improvements26,30. Despite the projection of decreasing renewable energy costs43, we emphasize the importance of policy interventions (for example, building large PV and wind power plants, grid integration, energy storage and demand-side power-load management) to reduce renewable costs. Second, deploying PV and wind power can offer new sources of income in less-developed regions with vast areas of desert and marginal lands. It has implication for accelerating economic development by deploying renewables in semiarid regions such as Africa and the Middle East44. Third, optimizing power systems for large developing countries can lower the costs of deploying renewables in the upcoming decades, making it feasible to achieve more ambitious climate targets beyond the 2060 carbon neutrality45. Our research highlights the technical and physical constraints on deploying renewables to mitigate CO2 emissions, the importance of scaling up investments to accelerate energy transition to PV and wind power and the optimal route to achieve carbon neutrality in the long run.

Methods

Geospatial data in this study

An overview of our optimization model is shown in Extended Data Fig. 1. We optimized the placement and capacity of PV and wind power plants in our model driven by geospatial data (Supplementary Method 1), including land cover, solar radiation, wind speed, surface air temperature, ground slope, latitude and longitude of the installed PV panels, terrestrial and marine ecological reserves, water depths of offshore stations and marine shipping routes (Supplementary Table 2). All land pixels were categorized into forest, shrubland, savannah, grassland, wetland, cropland, urban and built-up land, mosaics of natural vegetation, snow and ice, deserts and water bodies46. The suitability of the installation of PV panels or wind turbines was defined by land cover (Supplementary Table 3). Onshore wind turbines with the capacity of 2–2.5 MW and offshore wind turbines with the capacity of 5–10 MW are considered as the main models used in China at present47, so we considered models for onshore (General Electric 2.5 MW) and offshore (Vestas 8.0 MW) wind power plants (Supplementary Table 4) at a hub height of 100 m above the ground to convert air kinetic energy to electricity based on the recommended power-generation curve48 (Supplementary Fig. 3). Resources of solar and wind energy were associated with seasonal and diurnal variabilities and interannual differences. We estimated hourly solar radiation and wind speed at a hub height of 100 m above the ground as averages for 2012–2018 to provide a representative estimate of solar and wind energy in China (Supplementary Method 2). All geospatial data were projected to a resolution of 0.0083° in latitude and 0.033° in longitude for estimating the potential of power generation by installing PV panels or wind turbines in each pixel (Supplementary Methods 35).

The optimization model

We estimated the LCOE of the PV and wind power systems to indicate the grid parity of power generation, which is defined as the normalized net present value of all costs of investments, O&M, land acquisition, transmission and energy storage divided by the power generated during the lifetime (25 years (ref. 30)) of the PV and wind power plants35. Before solving the optimization problem, we sought the best strategy for installing PV panels or wind turbines with different shapes to achieve the maximal capacity of power generation in each county (Supplementary Fig. 4). We took the number of pixels installing PV panels or wind turbines and the time to build each PV or wind power plant by decade as decision variables. By accounting for the intertemporal dynamics of learning26,30, we developed a unique method to optimize the capacity of each power plant, the order of building power plants, the time to build each power plant and the option of energy storage when building a new power plant by solving a cost-minimization problem based on the LCOE for generating power by the projected PV and wind power plants:

$$\mathop{\min }\limits_{{\epsilon },{n}_{x},{t}_{x},{s}_{x}}{{\rm{LCOE}}}_{{\epsilon }}=\frac{\left({V}_{{\epsilon }}+{A}_{{\epsilon }}\right)\cdot \left[1+{R}_{y}\cdot {\sum }_{{\tau }_{p}=1}^{T}\frac{1}{{\left(1+{r}_{{\rm{d}}}\right)}^{{\tau }_{p}}}\right]+{G}_{{\epsilon }}\cdot {\sum }_{{\tau }_{g}=1}^{{L}_{g}}\frac{1}{{\left(1+{r}_{d}\right)}^{{\tau }_{g}}}}{{E}_{{\epsilon }}\cdot {\sum }_{t=1}^{T}\frac{1}{{\left(1+{r}_{{\rm{d}}}\right)}^{t}}}$$
(1)
$${V}_{{\epsilon }}=\mathop{\sum }\limits_{q=1}^{7}\mathop{\sum }\limits_{x=1}^{{n}_{q}}\left[1-{\xi }_{x}\left({t}_{x}\right)\right]\cdot {V}_{x}\left({n}_{x}\right),\,x\in q$$
(2)
$${E}_{\epsilon }=\mathop{\sum }\limits_{h=1}^{8,760}\left[\mathop{\sum }\limits_{q=1}^{7}\mathop{\sum }\limits_{x=1}^{{n}_{q}}{E}_{x,h}\left({n}_{x}\right)-{\eta }_{{\rm{tra}}}{\varTheta }_{h}-{\eta }_{{\rm{store}}}{\varLambda }_{h}\right],\,x\in q$$
(3)
$${\varTheta }_{h}=\mathop{\sum }\limits_{q=1}^{7}\max \,\left[0,\mathop{\sum }\limits_{x=1}^{{n}_{q}}{E}_{x,h}\left({n}_{x}\right)-{M}_{q,h}\right]=\mathop{\sum }\limits_{q=1}^{7}{U}_{q,h},\,x\in q$$
(4)
$${\varLambda }_{h}=\mathop{\sum }\limits_{q=1}^{7}\max \,\left[0,\mathop{\sum }\limits_{x=1}^{{n}_{q}}{E}_{x,h}\left({n}_{x}\right)+{U}_{q,h}-{M}_{q,h}\right],\,x\in q$$
(5)

in which ϵ is a new power plant (ϵ = 1 to 3,844), x is a power plant built before ϵ, nx is the number of pixels installing PV panels or wind turbines in plant x, tx is the time to build plant x, sx is the option of energy storage (1 for pumped hydro and 2 for chemical batteries) when building plant x, T is the average lifetime of a power plant, h is hour, q is a region (1–7 for Central China, East China, North China, Northeast China, Northwest China, South China and Southwest China, respectively), nq is the number of power plants in region q, rd is the discounting rate (5%)2, τp is a year in the operation of plant x, τg is a year during operation of energy storage in plant x, Lg is the lifetime of storage (50 years for pumped hydro6 and 15 years for chemical batteries49), Eϵ is the total power generation, Vϵ is the total investment in power plants, Aϵ is the total cost of electricity transmission, Gϵ is the total cost of storage, Ry is the ratio of O&M costs to investment costs (1% for PV50 and 3% for onshore and offshore wind power plants51), Vx is the investment in plant x, ξx is the ratio of cost reduction by learning when building plant x, Ex,h is the hourly generation of power in a county, Θh is the hourly transmission of electricity, Λh is the hourly storage of electricity, ηtra is the fraction of electricity lost during transmission, ηstore is the fraction of electricity lost during storage, Mq,h is the hourly consumption of electricity in region q and Uq,h is the hourly transmission of electricity from other regions to region q.

We optimized the increase in power capacity at an interval of 10 years during 2021–2060 because it generally takes 10 to 20 years for new technologies to be widely applied52. Given the variation of renewable energy within a decade, we performed a sensitivity experiment by optimizing the model at an interval of 5 years, in which the installed PV and wind power capacity and total costs both change moderately (Extended Data Fig. 8). Nevertheless, simulating the penetration of renewable energy within a decade will be useful to improve the optimization model.

We considered the connection of power plants in a county to one of the substations from the UHV transmission lines projected in the CFED plan7 (Supplementary Data Set 1) with the costs of building new UHV lines (Supplementary Method 6) and developing systems for storing energy (Supplementary Method 7). We estimated Uq,h using three assumptions. First, the electricity generated by all PV and wind power plants in a region is used to meet the power demand in this region as a priority. Second, the extra electricity is connected to a substation in the UHV line and transmitted to a region in which the next substation in the line is located. Third, the electricity transmitted to a region is distributed to each county based on the distribution of the consumption of electricity in this region. We have considered the impact of transmission access on where and when to build new PV and wind power plants. When optimizing the construction time of 3,844 PV and wind power plants, we have accounted for the costs of building new UHV transmission lines when a new power plant is built, which influences the LCOE of this plant and the construction time of all new plants. By optimizing the construction time of each new power plant, we considered that a new UHV line required for this new plant will be constructed at the same time.

As a caveat of this study, we do not have explicit information for all UHV transmission lines, so we assumed that the UHV lines projected by the central government are used as a proxy for UHV lines between the main regions in the country. This assumption is useful to determine the demand for electricity transmission between regions, but it could lead to bias in our cost estimation because of the lack of detailed information for all UHV lines. For example, the projection of 128 UHV lines with a capacity of 12 GW each from Huaidong to Wan’nan in our model indicates that at least a total transmission capacity of 1,536 GW is required for transmitting electricity from the region centred in Huaidong to the region centred in Wan’nan, but the ultimate UHV lines built between these two regions might be different from our prediction. This limitation can be addressed when the detailed information for all UHV transmission lines are available. To consider the outflow of electricity generated in a county, we sought the substation of UHV lines that is closest to this county and then we estimated the cost of electricity transmission from this county to the transmission substation and the cost of electricity transmission using one of the UHV lines. Although this study projected the construction of a large transmission capacity to optimize power systems, it is important to account for the physical, technical and economic constraints. These include the demand for advanced polymer matrix composites that can operate under a voltage of >1,000 kV, the construction of UHV lines over challenging terrains, the maintenance of these lines and ensuring the security of electricity transmission under extreme weather conditions.

We sought the optimal system for storing energy when building a new power plant using either mechanical storage (pumped hydro) with a lifetime of 50 years and a round-trip efficiency of 70% or chemical storage (batteries) with a lifetime of 15 years and a round-trip efficiency of 85% (see the parameterization of two systems in Supplementary Table 5) to minimize the LCOE (Extended Data Fig. 9).

Last, ξx is calculated as a function of the total capacity of installed PV or wind power (Supplementary Method 8) based on the measured rates of learning in China (Supplementary Table 1). We examined the sensitivity to adopting the international rates of learning in our model (Fig. 2c).

Capacity and costs of power generation

For a new PV or wind power plant x, the annual generation of power was calculated:

$${E}_{x,h}=\mathop{\sum }\limits_{j=1}^{8,760}\mathop{\sum }\limits_{i=1}^{{n}_{x}}{W}_{i,j}$$
(6)

in which i is a pixel, j is the number of hours in a year and Wi,j is the hourly generation of power in a pixel installing PV panels (calculated in Supplementary Method 3), onshore wind turbines (calculated in Supplementary Method 4) or offshore wind turbines (calculated in Supplementary Method 5). The parameters used to estimate the projected PV and wind power generation are listed in Supplementary Table 6.

The investment cost of a new PV or onshore wind power plant x was calculated6:

$${V}_{x}=\mathop{\sum }\limits_{i=1}^{{n}_{x}}\left({\mu }_{{\rm{fix}}}{P}_{i}+{\mu }_{{\rm{land}}}{S}_{i}\right)+2{\mu }_{{\rm{line}}}\sqrt{{\rm{\pi }}{\sum }_{i=1}^{{n}_{x}}{S}_{i}}+{\mu }_{{\rm{tran}}}{\rm{int}}\left(\frac{{\sum }_{i=1}^{{n}_{x}}{P}_{i}}{{P}_{{\rm{fix}}}}\right)$$
(7)

in which i is a pixel, Pi is the installed capacity of PV panels (calculated in Supplementary Method 3) or onshore wind turbines (calculated in Supplementary Method 4), Si is the area of pixels installing PV panels or wind turbines, Pfix is the capacity of a voltage transformer (300 MW), μfix is unit capital costs, μland is unit cost of land acquisition, μline is unit cost of line connection and μtran is unit cost of voltage transformation.

We assumed that the installed voltage transformer has a capacity of 300 MW (ref. 53). When estimating the unit cost of land acquisition, we considered that onshore wind turbines take up only 2% of area in a pixel and PV panels take up 100% of area in a pixel54. We derived μfix as the sum of costs for modules (μmodule), inverters (μinverter), mounting materials (μmounting), secondary equipment (μsec), installation (μins), administration (μadm) and grid connection (μgrid) using the data for PV panels ($0.64 per watt) published by the China Photovoltaic Industry Alliance55 and using the data for onshore wind turbines ($0.68 per watt) from a previous study56. We demonstrated the impact of using different capital costs by examining the sensitivity to adopting high capital costs ($0.73 and $0.88 per watt for PV panels and onshore wind turbines, respectively)35 or low capital costs ($0.23 and $0.76 per watt for PV panels and onshore wind turbines, respectively)36 in the sensitivity tests (Fig. 2c).

The investment cost of an offshore wind power plant x was calculated on the basis of the distance of offshore wind turbines in this power plant to the onshore power station57:

$${V}_{x}=\mathop{\sum }\limits_{i=1}^{{n}_{x}}\left[{{\mu }}_{{\rm{baseline}}}\left({z}_{0}+{z}_{1}{D}_{L,i}\right)\left({z}_{2}+{z}_{3}{D}_{P,i}\right){P}_{i}\right]$$
(8)

in which i is a pixel, μbaseline is the unit cost of offshore wind turbines, Pi is the installed capacity of offshore wind turbines (calculated in Supplementary Method 5), DL,i is the distance of the offshore wind turbines to the onshore power station and DP,i is the water depth of the installed offshore wind turbines. The coefficients z0 (0.0057), z1 (0.7714), z2 (0.0084) and z3 (0.8368) were calibrated using engineering data57. The parameters used to determine the costs of PV and wind power generation are listed in Supplementary Table 7. The parameters used to determine the costs of UHV transmission and energy storage are listed in Supplementary Table 8.

We adopted a fixed ratio of O&M costs to investment costs for the projected PV and wind power plants50,51. We adopted 25 years (ref. 30) as the average lifetime of PV or wind power plants. We considered the costs of electricity transmission by UHV when increasing the installed capacity of a power plant. We sought the geographic centre among all pixels suitable for power generation and then increased the number of surrounding pixels (nx) installing PV panels or wind turbines. The capacity of power generation by each power plant increases as the number of pixels installing PV panels or wind turbines increases in the order of the distance to the geographic centre. The inclusion of more pixels in a power plant, however, increases not only the capacity of this PV or wind power plant but also the total costs in the power systems. The LCOE for a new power plant first decreased when we increased the power capacity by increasing the number of pixels for installation of PV panels or wind turbines, because the capital costs were divided by the generated power, but then increased owing to the increasing costs of purchasing land and the decreasing power-use efficiency (Extended Data Fig. 2). We sought the optimal capacity for each power plant for achieving the minimum of the LCOE.

MAC

We assumed that the electricity generated by new PV and wind power plants was used to replace oil, gas and coal in the order of fuel price to produce the highest profits6. Solving the cost-minimization problem in equation (1) was constrained by the target of the annual abatement of CO2 emissions by substituting fossil fuels when a new PV or wind power plant ϵ was built (Fϵ):

$${F}_{{\epsilon }}={\theta }_{{\rm{fossil}}}\cdot {E}_{{\epsilon }}-\mathop{\sum }\limits_{q=1}^{7}\mathop{\sum }\limits_{x=1}^{{n}_{q}}\left({\gamma }_{x}\cdot {S}_{x}\right)-\frac{{\sum }_{q=1}^{7}{\sum }_{x=1}^{{n}_{q}}\left({v}_{x}\cdot {S}_{x}\right)}{25},\,x\in q$$
(9)

in which Eϵ is the total power generation, Sx is the area of pixels installing PV panels or wind turbines, θfossil is the CO2 emission factor of coal (0.84 kg CO2 kWh−1), oil (0.72 kg CO2 kWh−1) or gas (0.46 kg CO2 kWh−1)58 that is substituted by PV and wind power, γx is the flux of the terrestrial carbon sink disaggregated from a bottom-up estimate59 and vx is the concentration of soil carbon in lands covered by vegetation60 transferred to PV panels or wind turbines (Supplementary Table 9).

We derived the MAC for a new PV or wind power plant ϵ, MACϵ, based on the abated CO2 emissions:

$${{\rm{MAC}}}_{{\epsilon }}=\frac{{{\rm{LCOE}}}_{{\epsilon }}\cdot {E}_{{\epsilon }}-{{\rm{LCOE}}}_{{\epsilon }-1}\cdot {E}_{{\epsilon }-1}-{\varrho }\cdot \left({E}_{{\epsilon }}-{E}_{{\epsilon }-1}\right)}{{F}_{{\epsilon }}-{F}_{{\epsilon }-1}}$$
(10)

in which ϱ is the price of coal, oil or gas. We obtained the prices of coal ($0.043 ± 0.015 per kWh as the 95% confidence interval)61, oil ($0.141 ± 0.057 per kWh)62,63 and gas ($0.058 ± 0.016 per kWh)64 in China as the averages during 2010–2020, when they are considered to generate electricity with an efficiency of 35%, 38% and 45%, respectively65. The generation of power by fossil fuel in the 2010s in China was dominated by coal, with a contribution66 of 96% in 2020, but the composition of fossil fuel in the future is as yet unknown for China. We assumed that the future fossil-fuel composition in China will be constant in our central case, but we performed two sensitivity experiments to consider the impact of changes in fuel composition. First, the share of oil for generating power increases from the current level in 2020 (0.3%) to 50% in 2060 by substituting coal when the share of gas is identical to that in the central case. Second, the share of gas for generating power increases from the current level in 2020 (4.1%) to 50% in 2060 by substituting coal when the share of oil is identical to that in the central case (Extended Data Fig. 6).

Hourly power demand

We predicted the hourly power demand by 2060 based on the flexibility of power loads by sector (Supplementary Table 10). First, we scaled up the historical hourly power loads from electrical grids67 in 2018 by the increase in total power demand under the projected rate of electrification33 in 2060 (58%) for six non-power sectors, including agriculture, industry, transport, building, service and household electric appliances, in 31 provinces. We assumed that the power loads are flexible for agriculture, industry, building, service and household electric appliances, except for heating and cooling in houses and electric cars, so we could simulate the profiles of the hourly power demand to match the hourly power generation by PV and wind endogenously in our optimization model. Second, we predicted the hourly power demand by electric cars. We obtained the profile of traffic flow in each street every five minutes in 2018 in Shenzhen68, which was assumed to represent the variation of traffic flow in the future owing to a lack of data for other cities in China. When electricity is used by electric cars, one-third of vehicles are charged immediately, one-third are charged in one hour and one-third are charged in two hours25.

Third, we predicted the hourly power loads for heating and cooling in houses. We obtained the hourly energy used for space heating and cooling in houses by region in China69. Finally, we considered the impact of temperature on the power demand for heating and cooling in houses and electric cars based on the projected temperature under climate warming. The electricity used for heating increases by 0.98% as the annual average temperature decreases by 1 °C when the hourly temperature is below 16 °C (ref. 70), whereas the electricity used for cooling increases by 0.63% as the annual average temperature increases by 1 °C when the hourly temperature is above 28 °C (ref. 25). We predicted the hourly power demand for heating and cooling for 31 provinces for 2021–2060 based on the gridded hourly temperature71 averaged for 2016–2020 and the projected change in annual average temperature during 2021–2060 under the SSP1-2.6 scenario from an Earth System Model17. The power demand shifts in the daytime to match the peak of hourly PV and wind power generation (Supplementary Fig. 5).

Actual PV and wind power plants

We adopted a pixel resolution of 1 × 3 km2 for installing PV panels or wind turbines, which allows us to predict the location and capacity of individual PV and wind power plants in our optimization model. We cannot validate the locations and capacities of the projected PV or wind power plants that had not yet been built, so we used the locations and capacities of the commissioned PV and wind power plants in OpenStreetMap31 that were closest to the projected PV or wind power plants to evaluate our prediction (Extended Data Fig. 3). We estimated the geographical distance of locations between the projected and actual PV and wind power plants. A full validation of our optimization model required detailed information on the PV and wind power plants when they are to be built in the coming decades, so we only compare the projected capacities of power plants normalized by current area with the actual capacities of the existing power plants in OpenStreetMap31.

Distribution of income

We estimated the impact of finances embodied in the flow of electricity generated by new PV and wind power plants on the redistribution of income in 2060. First, we estimated the distribution of income among the population at a county level based on the frequency distribution of income among the residents of urban and rural populations derived from a national survey72 in 2015. We considered that the annual growth rate of population is 2% for Gansu, Inner Mongolia, Ningxia, Qinghai, Xinjiang and Xizang, which is higher than other provinces (1%) resulting from more new jobs and higher income created in these less-developed provinces66. Second, we compiled the per-capita disposable income for urban and rural populations at the county level66 for 2015–2019. We made a linear projection of per-capita disposable income to 2060 based on the rate of growth of income by province during 2021–2060. We calibrated the growth rate of per-capita income for each income group at the county level during 2015–2060 to guarantee that the projected per-capita income as an average for each county in 2060 was equal to the projection for 2060. Given a carbon price (ς), we assumed that only power plants with MACs below this carbon price were constructed. We estimated the revenue (Rϵ) from power generation when building a new PV or wind power plant (ϵ):

$${R}_{{\epsilon }}={\varrho }\cdot {E}_{{\epsilon }}+\zeta \cdot {F}_{{\epsilon }}-{{\rm{LCOE}}}_{{\epsilon }}\cdot {E}_{{\epsilon }}$$
(11)

in which ϱ is the price of coal, oil or gas in China that is substituted by PV or wind power, Fϵ is total abatement of CO2 emissions, Eϵ is total PV and wind power generation and LCOEϵ is the LCOE for the projected PV and wind power plants after building plant ϵ.

Revenue from PV and wind power generation could be derived from the electricity price minus the LCOE, but the electricity price can be influenced by many socio-political factors25,50. We focused on analysing the impact of carbon price as a proxy for climate policies on the revenue of PV and wind power, so we considered that the electricity price depends on the fossil fuel prices and carbon price. The prices of fossil fuel may increase in the future owing to the scarcity of fossil fuel73, which can increase the revenue of replacing fossil fuel with renewables, including PV and wind power. To estimate the prices of fossil fuel in 2060, we randomly draw the prices from the normal distributions, the average and standard deviations of which are estimated from the prices that are available from 2010 to 2020 (Extended Data Fig. 6). Predicting the impact of energy scarcity on the prices of fossil fuel and thus the revenue of PV and wind power is not considered in this study.

We represented the income inequality by dividing the population into 2,002 groups based on the order of income in each county. We excluded pixels in urban areas for the construction of utility-scale PV or wind power plants, so we allocated the revenue among the rural population in each county. When a carbon tax was levied on fossil fuels, we predicted the change in the per-capita income for each group in the population by considering the increased costs of power generation, the revenue from PV and wind power generation and the costs of carbon tax saved by reducing the use of fossil fuel (Supplementary Method 9). Finally, we estimated the income Gini coefficient in China using a formula74 based on the changes in the fractions of income and population in each population group for 2,373 counties in 2060 when the carbon price increases from $0 to $100 per tCO2.

Uncertainty analyses

We estimated the uncertainties in the MAC and the Gini coefficient by running an ensemble of Monte Carlo simulations 40,000 times75. We randomly varied the parameters in these simulations, including: (1) the variability of PV power generation (±5%) over a suitable pixel (Wijy) owing to the impact of aerosol deposition on PV panels76 and the variability of wind power generation (±2%) over a suitable pixel (Wijy) owing to the impact of climate change on wind resources77, (2) the growth rate of power demand by province during 2020–2060 (±1%)7, (3) the parameters used in the calculation of initial investment costs based on the variability of capital costs (±10%) from previous estimates55,56, (4) the historical rates of learning for different cost components measured in China (Supplementary Table 1) and (5) the parameters used for calculating the costs of UHV transmission and energy storage from different studies (Supplementary Table 8). Last, we adopted the medians of the MAC and the Gini coefficient to represent our best estimates, whereas we used the 90% uncertainties and interquartile ranges to represent their uncertainties.