Introduction

In Turkey and globally, the extraction of coal seams is frequently conducted through the utilization of longwall method. According to1, longwall mining is an exploitation method commonly applied in flat deposits, where the face is established for mineral extraction. Nowadays, longwalls are designed to be approximately 300 m in width and 1–2 km in length, depending on the seam structure. The coal seam prepared for production becomes ready for extraction through the combination of galleries, known as the gate road and road ways, which are opened parallel to the coal seam. The gate roads play a crucial role in the layout of longwall mining as they serve as the exclusive escape and access routes to the longwall face2,3,4. Today, lignite mining heads for deeper mining all around the world. Lignite mining in countries such as Turkey, China, and Australia will be performed at deeper levels from now on. In this case, the importance of stress–strain and numerical modeling studies in the literature is increasing. Examining the previous numerical modeling studies, it is seen that there are several studies carried out. Reference5 has studied the same coal field. They have revealed that maximum vertical abutment stresses were formed at a distance of 7 m in front of the face in the numerical modeling they made. With a combination of analytical, observational and empirical methods, “Ref.6 developed a new cavability assessment criterion for longwall roof strata cavability, and they assisted in stress modeling”. “Reference7 investigated the effect of rock bolt penetration on roof loads to ensure the stability of the tailgate-main gate in the longwall production method”. “Reference8 identified the relative magnitude of horizontal stress change below a series of parallel longwall panels as a consequence of multi-seam mining with finite element modeling”. “Reference9 made numerical modeling for the loads in critical regions determined on the longwall panel and for the forming zone of broken rock rubble, called gob. “Reference10 made stress modeling of bauxite seam in the longwall, added discontinuities to the model, and they revealed that the pillar left between two panels is sufficient by using numerical modeling”. “Reference11 showed the effect of discontinuities on the stresses on the pillar in the longwall top coal caving (LTCC) with a numerical model”. “Reference12 calculated safety factors according to the pillar size to be left between two panels by numerical modeling”. “Reference13 revealed that additional stresses occur on the longwall panel after the face advances 120 m”. “Reference14 carried out studies on stress numerical modeling on longwall chain pillars with drill techniques”. “Reference15 tried to model the maximum convergence values from roof to floor in a mechanized longwall under poor main roof conditions”. Also, numerical methods provide powerful tools for the analysis and design of LTCC mining operation systems with complex mining conditions5,16,17,18,19,20,21,22,23,24,25,26,27,28,29,30. “Reference31,32 studied mining cribs models in underground mines and aims to enhance stability, minimize resource wastage, and potentially improve cost-efficiency using numerical analysis, while also emphasizing the importance of proper design, durability, safety considerations, and compliance with regulations in implementing this alternative support system in underground mines.”

In this study, the optimum dimensions of the pillar to prevent the main road and panel tailgate-main gates from being affected by production-induced stresses towards the end of the panel in the production of longwall are investigated through numerical modeling studies. In the models, pillar distances from 10 to 60 m are modeled. In the numerical modeling, the lowest mean stress occurring in the main road is observed in the pillar distance of 10 m with 8.1155 MPa. In addition, when pillar distance of 10 m is left, the coal recovery efficiency in the panel reaches the highest value. Therefore, it is calculated that pillar distance of 10 m does not reach a stress value that will affect the production on the main road and tailgate-main gates.

Boundary conditions and rock mass calculations

In engineering applications, defining the physical and mechanical properties of the rock material as well as the rock mass behavior is very important in roof stress–strain analysis and support design.

Reference33 introduced the geological strength index (GSI), both for hard and weak rock masses. Experienced engineers and miners generally prefer simple, fast, but reliable classification which is based on visual control of geological conditions. Reference33 proposed such a practical classification for estimating GSI based on only visual inspection (Fig. 1). Based on the real rock structure classification and the discontinuity surface condition, a block in the 5 × 5 matrix of Fig. 1 can be found and the corresponding GSI value can be read from the figure. According to33, a range of values of GSI should be estimated in preference to a single value.

Figure 1
figure 1

Characterization of Marl and Coal rock mass classifications33.

The Hoek–Brown failure criterion is a widely accepted approach for predicting the relationship between principal stresses at the point of failure in a rock mass. Through trial-and-error methodology, it was determined that the relationship between the major principal stress and the minor principal stress is curved. The failure criterion establishes a connection between the major principal stress (σ1) and the minor principal stress (σ3) at the point of failure. The equation describing this criterion is provided below as Eq. (1).

Generalized Hoek–Brown criterion is presented in Eq. (1).

$${\sigma }_{1}={\sigma }_{3}+{\sigma }_{ci}{\left({m}_{b}\frac{{\sigma }_{3}}{{\sigma }_{ci}}+s\right)}^{a}$$
(1)

In the Hoek–Brown failure criterion:

σ1 and σ3 represent the maximum and minimum effective stresses at failure, respectively. mb is the value of the Hoek–Brown constant for the rock mass. s and a are constants that rely on the characteristics of the rock mass. σci is the uniaxial compressive strength of the intact rock. The constant "s" is linked to the tensile strength between the blocks or grains within the rock mass and the degree of adherence of the rock material. In the case of the rock material, the typical value of "s" is 1. This value decreases from 1 to 0 in relation to the quality of the rock mass. The constant "mb" is subject to variation based on factors such as the specific type of rock in consideration.

Once the Geological Strength Index has been predicted, the parameters which describe the rock mass strength characteristics, are calculated as follows:

$${m}_{b}={m}_{i}exp\left(\frac{GSI-100}{28}\right)$$
(2)

For GSI > 25, i.e. rock masses of good to reasonable quality, the original Hoek–Brown criterion is applicable with

$$s=exp\left(\frac{GSI-100}{9}\right)$$
(3)
$$ {\text{a}} = \, 0.{5} $$
(4)

For GSI < 25, i.e. rock masses of very poor quality, the modified Hoek–Brown criterion applies with

$$ {\text{s}} = 0{\text{ and a }} = \, 0.{65 }{-} \, \left( {{\text{GSI}}/{2}00} \right) $$
(5)

For GSI = 25 the modified Hoek–Brown criterion applies with

$$ {\text{a}} = \, \left( {{125 }{-}{\text{ GSI}}} \right)/{2}00 {\text{a }} = \, 0.{5} $$
(6)

Laboratory experiments and field studies are carried out to find intact rock and rock mass properties. It is important to use rock mass properties instead of rock material properties in numerical modelling. That’s why, GSI classifications are made according to the33 as seen Fig. 1. Physical and mechanical properties of intact rock material are given in Tables 2 and 3.

Rock mass materials show elastic behaviour under low stress. As stress increases rock mass shows plastic and viscosity behaviour. The failure criterion is used to determine whether stress in the rock will lead to inelastic behaviour, including fracture in rock mass. For rocks under high stresses, plastic deformation occurs and brittle failure follows plastic deformation. The failure criterion is used to compute the plastic deformation. Two widely used failure plane criteria for rocks are the Mohr–Coulomb model and the Drucker-Prager model. The stress strain in the rock mass can be macro fractured into an elastic and plastic part. The elastic part of the strain can be computed from a linear elastic constitutive model.

Due to the complex distribution of the initial underground and mining stress fields, stress fields cannot be analyzed and described entirely. Thus, the following admissions are necessary in the model. With a continuous increase in the front abutment pressure, internal macro-cracks form in the coal panel, which then enters the limit-equilibrium state according to the33. In the coal panel, longwall face is accepted as limit equilibrium zone. Main and tailgate are accepted as plastic zone. The panel part to be left as pillar is modelled as elastic zone since it is not disturbed (Fig. 2).

Figure 2
figure 2

Boundary conditions in coal panel41.

Longwall modeling consists of three basic stages. These are;

  1. 1.

    Meshing

  2. 2.

    Definition of material behavior

  3. 3.

    Definition of boundary and initial condition

Thanks to boundary and initial conditions, physical limits of the model and original conditions are implemented in the model. Boundary conditions applied in the model and stress values are given in Fig. 3 and Table 1.

Figure 3
figure 3

Boundary conditions of calculated area borders41.

Table 1 Boundary conditions stress values of the model.

Considering the working depth, density values, and elasticity modulus of the rocks in the field (given in Table 3); the vertical and horizontal in-situ stresses that will occur on the panel, tailgate-main gate, and main haulage road are calculated using the equations given below34.

$$ \sigma_{{\text{h}}} = {\text{k }} \times \, \sigma_{{\text{v}}} $$
(7)
$$k=0.25+7\times E\times \left(0.001+\frac{1}{z}\right)$$
(8)

where, σV: Vertical in-situ stress (MPa), σh: Horizontal in-situ stress (MPa), k: The ratio of horizontal in-situ stress to vertical in-situ stress, E: Average modulus of elasticity of rock masses in vertical direction up to the worked depth (GPa) and z: Working depth (m).

By using Eqs. (7) and (8), at 200 m working depth, vertical and horizontal in-situ stresses are found as 4.23 MPa and 1.21 MPa, respectively.

Here, coal is extracted by retreating longwalls, employing top coal caving in longwall faces that are 3 m high, positioned at the bottom of the coal seam. The remaining 5 m thick top layer of the seam is subsequently caved and extracted through the use of a folding gob shield located at the rear of the shields. In the field, the daily progress rate averages 3.2 m.

Calculation of in-situ stresses and creating models

In the present study35, solid modeling software is used and a longwall panel of 3 m’ seam thickness and 150 m’ length is modeled. In longwall mining, in order that additional stresses occurring in and around the longwall do not affect the main haulage road at the end of the panel produced, production is stopped at a certain distance to the end of the panel and a safety pillar is left for safety purposes.

In the present study, a total of 6 longwall models are created with pillar distances of 60 m, 50 m, 40 m, 30 m, 20 m and 10 m respectively. Figure 4 shows the view of the modeled longwalls. Considering the panel dimensions, the areas used on the model for stress analysis are 9000 m2 for 60 m pillar distance, 7500 m2 for 50 m pillar distance, 6000 m2 for 40 m pillar distance, 4500 m2 for 30 m pillar distance, 3000 m2 for 20 m pillar distance and 1500 m2 for 10 m pillar distance.

Figure 4
figure 4

Longwalls modeled in different pillar distances35.

In modeling studies, the geomechanical parameters of the coal and surrounding rocks of the Tuncbilek region are taken into account. The mine depth is 200 m. Table 2 shows the geomechanical parameters of coal and surrounding rocks in the field. The data provided in Table 2 are actual results obtained from rock mechanics tests conducted on coal and surrounding rock samples taken from the field. In converting these data into rock mass data, the Generalized Hoek–Brown criterion given in Eq. (1) is used. Since the site is represented as a mass in modeling studies, the rock material properties given in Table 1 are transformed into rock mass data using36. The rock mass data used in models is given in Table 3. Figure 5 shows the plan views of the longwall panel and pillars in the worksite and the view of the longwall.

Table 2 Geomechanical parameters of coal and surrounding rocks5,38,39,40.
Table 3 Rock mass data used in the model.
Figure 5
figure 5

Panel plans and view of longwall (not to scale).

According to previous research, the gob zone in longwalls is categorized into three groups: new gob, compressed gob, and well-compressed gob. In their modeling study conducted in 2013, “Ref.37 assigned a Poisson's ratio of 0.25 to well-compressed gob, a Poisson's ratio of 0.30 to compressed gob and a Poisson's ratio of 0.40 to new gob. Similarly, they set the elasticity modulus of new gob to 100 MPa and elasticity modulus of compressed gob to 200 MPa, while the elasticity modulus of well-compressed gob is determined as 500 MPa”. As the longwall advances, the old gob zone becomes more compressed, influenced by the overlying strata. Theoretically, the internal friction angle of well-compressed gob decreases. This can be better understood by comparing the measured internal friction angle of a mass in its free state with the internal friction angle when the same mass is subjected to vertical compression. In the created model, the gob material is also divided into three groups using same strength parameters. Since gob material consists of fragmented material, the mass behavior in the model is selected as plastic.

Arch yielding supports have not been modeled in the created models within the scope of the study. During modeling studies, each model consists of 4 zones: main road, tailgate, main gate, and panel. The rock mass data given in Table 3 are entered into the zones created in each model. Mass data of Marl are entered in the main road, tailgate and main gate, while mass data of Coal in the panel zone. The site is represented on the model in the most accurate way. These processes are followed by the stress analysis phase. Reference41 is used in stress analysis. Figure 6a shows the view of the models in ANSYS software.

Figure 6
figure 6

(a) View of the created model in ANSYS software, (b) application of horizontal and vertical in-situ stresses (MPa) on the model41.

Before the stress analysis, some operations should be performed on the model. These operations include fixing the model, identification of horizontal and vertical in-situ stresses on the model, and meshing process. Horizontal and vertical in-situ stresses calculated using Eqs. (7) and (8) are applied on models in the ANSYS software. In other words, the created models are exposed to loads under the calculated in-situ stresses. Figure 6b shows the stresses applied on the main haulage road, tailgate-main gate and panel in models. Considering that even the smallest change in horizontal and vertical in-situ stresses will greatly change the stresses occurring around underground structures. This stage becomes the most important stage of the modeling process. In order for the models created to give the most accurate result, it is of great importance that the horizontal and vertical in-situ stresses in the field are calculated in the most accurate way and entered into the models. When evaluated from this point of view, the horizontal and vertical in-situ stresses acting on main haulage road, tailgate-main gate and panel in the models should be applied to these regions considering the conditions in which the longwall model created is just underground. The force vectors shown in Fig. 6b represent the calculated horizontal and vertical in-situ stresses. These stresses on the relevant regions are defined with the help of the force vectors as seen in the Fig. 6.

The view of the model after the meshing process is given in Fig. 7a. The aim of the meshing process on the model is to divide the model into small parts, allowing more precise analysis. Another step before the stress analysis is to fix the model in the opposite direction of the load or stress in order to resist the applied stress and loads. Figure 7b shows the fixed version of the model.

Figure 7
figure 7

(a) View of the model after the meshing process, (b) fixing the model41.

The force vector shown in Fig. 7 is the fixing model used to fix the created model on a ground similar to real life case.

Results and evaluation

In calculations, the Von Mises stress criterion is employed to determine the principal stress value. It is expressed by the formula42.

$${\sigma }_{vm}=\sqrt{3}.J$$
(9)

where J is given by:

$$J =\frac{1}{\sqrt{6}}.\sqrt{({\sigma }_{1}-{\sigma }_{2}{)}^{2}+({\sigma }_{2}-{\sigma }_{3}{)}^{2}+({\sigma }_{3}-{\sigma }_{1}{)}^{2}}$$
(10)

where \({\sigma }_{1}\): major principal stress; \({\sigma }_{2}\): intermediate principal stress; \({\sigma }_{3}\): minor principal stress.

Following the determination of the load conditions on the created models, the models are run, and the occurred stress values are calculated. Stress distributions in different pillar distances are given in Fig. 8.

Figure 8
figure 8

Stress distributions in different pillar distances41.

The junction points of the main road and tailgate and main gate are identified, and the stress values occurring in these zones are calculated. Figure 9a shows the measurement points on the main road. In Table 4, the stresses occurring depending on the pillar distances at the determined measurement points are given, while Fig. 9b gives a graphical display of these stresses.

Figure 9
figure 9

(a) Measurement zones on the main road41. (b) The pillar distance-based stresses occurred in the main road.

Table 4 Vertical stresses occurred in the main road at different pillar distances.

Considering the pillar distance-based stresses occurring in the main road, which are given in Table 4 and Fig. 9b; it is seen that these stress values are very close to each other. It is observed that the lowest stress that occurred in zone A in the main road is 7.8828 MPa at a pillar distance of 10 m, while there is a 0.82% decrease compared to the stress value at a pillar distance of 60 m. On the other hand, it is observed that the lowest stress that occurred in zone B is 7.6835 MPa at a pillar distance of 40 m, while there is a 0.91% decrease compared to the stress value at a pillar distance of 60 m. Following these zone-based stress values, in order to evaluate the stress distribution on the main road, tailgate and main gate more objectively by the pillar distance, mean stress values occurring along these zones are calculated. The mean stress values calculated are given in Table 5. The stresses occurring along the main road at different pillar distances are collectively given in Table 6. Graphical display of the mean stress distributions occurring in the main road, tailgate and main gate at different pillar distances are given in Fig. 10.

Table 5 Mean vertical stresses occurred at different pillar distances.
Table 6 Vertical stresses occurred in the main road at different pillar distances.
Figure 10
figure 10

Mean vertical stresses occurred in the main road, tailgate and main gate at different pillar distances.

Considering the mean stress values given in Tables 5, 6 and Fig. 10, it is seen that the stresses occurring along the main road at different pillar distances are quite close to each other. It is seen that the lowest mean stresses in the main road occur at a pillar distance of 10 m with 8.1155 MPa, while the highest mean stresses at a pillar distance of 20 m with 8.1369 MPa. Within these stresses, there is only a 0.26% stress difference between the maximum value and the minimum value. This stress change is not thought to have any negative impact on the stability of the main road. Examining the mean stress distribution on the tailgate, it is observed that the lowest mean stresses occur at a pillar distance of 60 m with 7.9967 MPa, while the highest mean stresses at a pillar distance of 10 m with 8.2859 MPa.

In this case, there is a 3.5% change between the minimum and maximum mean stress values occurring in the tailgate. Considering the geomechanical parameters of the formation in which the tailgate is opened, this change is not thought to have any adverse effect on the stability of the tailgate. Examining the mean stress values occurring in the main gate, it is seen that the lowest mean stresses occur at a pillar distance of 60 m with 8.0313 MPa, while the highest mean stresses at a pillar distance of 10 m with 8.2813 MPa. It is seen that there is a 3.02% change between the minimum and maximum mean stress values occurring in the main gate zone. Considering the geomechanical parameters in the formation in which the main gate is opened, this change is not thought to have any adverse effect on the stability of the main gate. When evaluated in general, it is observed that the stresses occurring in the tailgate and main gate increase as the pillar distance decreases. However, it is clear that these increases in stress distribution will not have any negative effect on the stability of the main road, tailgate and main gate. It is observed that the mean stresses occurring in the main road, on the other hand, change without much dependence on the pillar distances.

When looking at the graph provided in Fig. 10, it can be observed that as the pillar distance shortens, there is an increase in stresses occurring in the tailgate and main gate, while the stresses occurring in the main haulage road remain almost unchanged. Although there may not be a noticeable difference in stress changes on the graph, it can be seen that the average stress change in the tailgate from a 60-m pillar distance to a 10-m pillar distance is 0.2892 MPa. This value is approximately equal to 30.11 tons/m2. In this regard, it can be concluded that as the pillar distance shortens, an additional load of 30.11 tons per square meter is applied to the tailgate. The same situation applies to the main gate, where the average stress change from a 60-m pillar distance to a 10-m pillar distance is 0.25 MPa. This value is approximately equal to 26.03 tons/m2. Therefore, it can be deduced that as the pillar distance decreases, an additional load of 26.03 tons per square meter is imposed on the main gate. These values indicate that the models designed within the scope of the study are in good agreement with the longwall stress mechanism.

The stress change occurring in the main haulage road region, on the other hand, decreases slightly as the pillar distance shortens. In this region, it has been observed that the average stress change is 0.0175 MPa lower compared to a 60-m pillar distance. This result is believed to be due to the increase in stress, as the pillar distance shortens, being transferred to the tailgate and main gate in accordance with the pressure arch theory43,44. Additionally, parallel to the conducted study, “Ref.12 studied 6 different panel pillar distances. They have examined the stress conditions occurring at different pillar sizes based on the safety factor and indicated that, through detailed numerical modeling studies, the pillar size can be reduced, allowing for the determination of an optimal distance.” Similarly, in parallel with the conducted study, in their research, “Ref.14 evaluated the stresses occurring at the pillars using a numerical analysis method. Upon examining the obtained results, it is observed that the results align with those achieved within the scope of the study.”

Besides, considering the coal recovery rates calculated according to the longwall dimensions and pillar distances designed in the models in case the pillar distance is reduced to 10 m the available coal recovery rate will increase to 83.33% due to the decrease in panel pillar.

Conclusion

In longwall mining, the stability of main roads is crucial for production, support, ventilation, and safe production throughout the mine life. On the other hand, to work by minimizing production losses considering work safety is important for the efficient production of underground sources. In the study, pillar distances at the end of the panel are investigated for various pillar distances in order to prevent damage to the main roads, safe transportation of the longwall equipment to the new panel and the continuity of mine production. In the stress analysis, the lowest stress occurring on the main road at a pillar distance of 10 m is calculated as 8.1155 MPa. The stress value at a pillar distance of 60 m is calculated as 8.1330 MPa. In this context, considering the strength parameters of the rocks surrounding the main road, it is found that the pillar distance of 10 m does not cause a problem in the main road stresses. Furthermore, coal recovery will be increased compared to other pillars distances. Finally, it should be stated that in modeling pillar size studies, work safety should be especially considered.