Abstract
Deep foundation pits involving complex soil–water-structure interactions are often at a high risk of failure under heavy rainfall. Predicted deformation is an important index for early risk warning. In the study, an ANN model is proposed based on the Wave Transform (WT), Copula method, Convolutional Neural Network (CNN) and Long Short-Term Memory Neural Network (LSTM). The total deformation was firstly decomposed into low and high frequency components with WT. The CNN and LSTM were then used for prediction of the two components with rolling training and prediction. The input variables of the CNN and LSTM were determined and optimized based on the correlations analysis of Copula method of the two components with different random variables, especially with the rainfall. And finally, the predicted total deformation was obtained by adding the two prediction components. A deep foundation pit in Chengdu, China was taken as a case study, of which the horizontal deformation curves at different measuring points shows three types of developed trend, as unstable, less stable, and stable types. The predictions of the deformations of different development types by the proposed ANN model show high accuracies with a few input variables and can accurately prompt risk warning in advance.
Similar content being viewed by others
Introduction
Deep excavations for construction of metro stations, building basements and other underground facilities have extensively emerged over recent years in the densely populated cities. Owing to the complexity and variability of subsurface conditions, deep foundation pits that involve complex soil–water-structure interactions are often at a high risk of failure related to heavy rainfall1,2,3. Rainfall often increases the soil unit weights, decrease the matric suction or increase the pore water pressure, decrease the strength of soils, and sometimes induces seepage erosion4. For some soil with unstable structures such as expansive soil or collapsible loess, cracks and settlement troughs may exist in the upper stratum and provide preferential pathways for water infiltration4,5. These variations in soil strata due to the rainfall would lead to internal stresses and horizontal deformation in the retaining structures. Therefore, the deformation of the retaining structures can reflect the current state of the stability of these deep foundation pits. During construction of deep foundation pits, the deformation of the foundation pits is usually monitored to ensure the safety of the foundation pits and surrounding structures6. The foundation pit might be judged as unstable when the prediction deformation exceeded the threshold or showed an unpredicted acceleration. However, because the deformation of soils and structures is usually nonlinear and influenced by multiple factors, it is hard to predict accurately7.
The commonly-used prediction methods of nonlinear deformation in geotechnical engineering can be grouped into two categories: the physical-based models and data-based models. For physical-based models, numerical simulation method is usually adopted to conduct an inverse analysis using the measured data to infer the current mechanical parameters of soils6,8,9,10,11,12. The reasonable soil parameters using in the numerical simulation is crucial for accurately predicting deformation, but the soil parameters measured in the laboratory and the actual soil parameters are often different13. Based on actual monitoring data, the inverse analysis method can obtain the actual soil parameters6,14,15. Some researchers took the excavation sequence into consideration11,16,17,18,19,20. To improve the calculation efficiency, the intelligent algorithms are introduced in the inverse analysis method21,22,23,24. However, physical-based models are still complex and time consuming, as they need to consider many conditions and some conditions cannot be directly obtained25,26,27. The data-based models can directly predict the deformation by the measuring deformation data, which are simple and efficient with high accuracy and only limited input data are required. Back Propagation Neural Network (BP), Support Vector Machine and Gray Verhulst model are developed to predict the deformation of foundations28,29,30, the deformation of slopes31,32, and the deformation of foundation pits33,34,35,36.
Among these models, BP model is the most widely used model, which is a feedforward multiple-layer perceptron model using error back-propagation learning algorithm37,38,39. A representative BP neural network consists of three layers for the structure: an input layer, a hidden layer, and an output layer40. The BP model has strong abilities of information processing, self-learning, nonlinear mapping, error feedback adjustment, and fault tolerance37,38,39,40,41. However, BP model also has some disadvantages such as slow convergence speed, long training time, difficult in achieve the overall optimum, and its prediction performance greatly depends on the random selection of initial weights and thresholds35,42. And the BP model requires large quantity training data and the data need to be widely representative34,43. For actual engineering, the requirement of the data could hardly be satisfied. Therefore, the BP model might be adequately trained due to limited training data, which may result large error in prediction44. Some researchers revised BP model with parameter optimization progress by new algorithms to avoid the local optimal solution and poor prediction accuracy. The revised BP models, such as the GA-BP, the PSO-BP and the SSA-BP models show high prediction accuracies in applications45,46,47. Some researchers adopted ANN with different structures, as the Convolutional Neural Network (CNN) and the Long Short-Term Memory (LSTM) neural network, to analyze the time series in the case of limited information. CNN is popular in computer vision and image processing, which uses convolution layers extract the spatial information in images, and with fully connected layers to store information in time-series data48,49. With convolution layers, the CNN model can effectively extracts the features of the time-series and deal with time series problem effectively47,48,49,50,51,52,53,54,55. One dimensional convolution CNN model is widely used in data series analyzing47,48,49,50,51,52, and the input can be one-dimensional53,54 or multi-dimensional arrays55. CNN may increase the accuracy up to 30% and train models twice faster than other algorithms such as RNN, GRU, and LSTM56. CNN weight division can reduce the number of parameters to increase the efficiency of model learning54,55,56,57. The CNN models can solve various time-series data, such as univariate, multivariate, multi-step, and multivariate multi-step model56. The LSTM network is a type of revised Recurrent neural network (RNN), which is a powerful and robust type of ANN that uses existing time-series data to predict the future data over a specified length of time57. The RNN model can only recollect the recent information58, and the main drawback of the RNN model is its shorter memory to remember the features, vanishing and exploding gradients59,60. To revise the RNN model, LSTM adopts memory blocks with three gate units as input, output, and forget gates, which perform the role of the normal neurons in the hidden layers61. These gates help in updating and controlling the flow of information through the memory blocks. The applications in predicting the market movement show that LSTM provides better prediction capabilities compared to random forest, and is very suitable for predicting volatility62,63. And the LSTM model is able to model problems with multiple input variables64.
The deformation of deep foundation pit evolving geo-material is complex nonlinear dynamic process and is influenced by different conditions. Therefore, decomposing the deformation into several components with different frequencies and predicting each component separately with different model based on their features might be a good approach. In this study, the deformation of foundation pit is decomposed into two components, low and high frequency components, by Wavelet Transform (WT). And then, based on the features of the two components, CNN and LSTM neural networks are adopted to predict the two components separately. In addition, the input variables of the CNN and LSTM neural networks are determined by analyzing the correlation of the two components with different random variables by Copula method. Consequently, an ANN deformation prediction model for foundation pit with consideration of the rainfall based on WT, CNN, LSTM and Copula method was proposed.
Methods
WT method and the decomposition of the deformation
In contrast to Fourier analysis, which decomposes the signal into a series of superposition of sinusoidal waves of different frequencies, WT method decomposes the signal into a series of superposition of wavelet functions. For a given signal f(t), discrete wavelet transform is generally used, and the signal decomposition can be expressed as,
where, \(c_{i,j}\) is the discrete wavelet coefficient and \(\phi_{i,j} (t)\) is the discrete wavelet function.
The method of approximating signals with irregular wavelet functions enables WT to have the ability to analyze local information in a superior manner in the time domain. SymN wavelets are a commonly used type of wavelet function, where N is the vanishing moment65. The low-frequency and high-frequency energy after WT analysis are related to the frequency characteristics of the signal and the vanishing moment N of the wavelet. The selection of decomposition layers also affects the decomposition effect. In the first layer of decomposition, the WT decomposes the original signal into a high frequency signal and a low-frequency signal, the second layer further decomposes the low frequency signal into a high-frequency signal and a low-frequency signal. Whether to continue decomposing the low-frequency signal depends on the given number of the decomposition layers. Finally reconstruct the decomposed signals to obtain the low frequency component and the high frequency component66.
For a foundation pit, the factors that affect the development of deformation curves can be divided into two groups, as long-term and short-term factors. Long-term factors include the excavation process, creep of support structures, and long-term rainfall; while short-term factors include the short-term disturbance factors such as the operation of construction vehicles and equipment, short-term rainfall and evaporation, earthquakes etc. Based on the different influence factors, the deformation of the foundation pit can be decomposed into two components with low and high frequencies using the WT, as
where, H is the total horizontal deformation; t is time and the unit is day; HL and HH are the low frequency component and the high frequency component, respectively.
Correlation analysis based on Copula method
Copula method can combine the empirical distribution function of two random variables to reflect the degree of correlation between the variables. Kernel density estimation is adopted to determine the empirical distribution function of a random variable. Let X1, X2, …, Xn be independent random variables identically distributed as a random variable X. The kernel density estimation \(f_{{\text{n}}} (x)\) at a point x is defined as67,
where, h is the window width, and n is the sample size, k(x) is the kernel function and defined as68,
The function fn(x) is used to calculate the probability of a random variable X near a specific value x. When calculating the probability that the random variable X falls into the range as x less then xp, it is necessary to introduce the probability distribution function F(x < xp), which is the integral of the probability density function fn(x) over this range. Therefore, the empirical probability distribution function F is defined as,
Assuming that the empirical distribution functions F and G of random variables X and Y were obtained through Eqs. (3) to (5). Then, a joint distribution function C for variables X and Y with empirical distribution functions F and G can be obtained by Frank-Copula function, as
where, θ is the function parameter. And the Kendall Rank Correlation Coefficient τ is calculated as,
The larger the value of τ, the higher the correlation between the two variables X and Y.
The data of different variables which are easily accessible and can be fed into the ANN model fall into two categories: the deformation and the rainfall. The deformation data might be input to the ANN model are the data of the low and high components at time t, HL(t) and HH(t), deduced from measured deformation, while the rainfall data include daily rainfall at time t R(t) and the average rainfall Rm(n, t), which is average rainfall for n days at time t and defined as,
where, R(i) is the daily rainfall at time i.
For the low frequency component HL, three groups of correlation analyses were conducted, as followings
-
(1)
The correlations between the items of the low frequency component time series.
{HL(t), HL(t−1),…., HL(n+1)} and {HL(t−n), HL(t−n−1),…., HL(1)}
-
(2)
The correlation between the times series of incremental components and daily rainfall.
{∆HL(t), ∆HL(t−1),…., ∆HL(n+1)} and {R(t−n+1), R(t−n),…., R(1)}
-
(3)
The correlation between the times series of incremental components and the average daily rainfall.
{∆HL(t), ∆HL(t−1),…., ∆HL(1)} and {Rm(t, n), Rm (t−1, n),…., Rm (1,n)}.
Noted that n is an integer greater than or equal to 1. The Copula method is used to analyze two random variables with same size and one coefficient τ is obtained for the two variables. Therefore, for the analysis of each group, n values of coefficients τ should be obtained. The average values of τ for the three groups would be compared firstly to determine which variable should be input. And then, the variation of the τ against n for one variable would be analyzed to determine how many data should be input for the variable.
For the high frequency component HH, two groups of correlation analysis were conducted, as
-
(1)
The correlation between the items of the high frequency component time series.
{HH(t), HH(t−1), …, HH(n+1)} and {HH(t−n), HH(t−n−1), …, HH(1)}
-
(2)
The correlation between the times series of high frequency components and rainfall.
{HH(t), HH(t−1),…., HH(n+1)} and {R(t−n+1), R(t−n),…., R(1)}
And then analyze the average values of τ for each group and the variation of τ against n in each group to determine the input data for the LSTM model.
The CNN neural network for prediction of H L
The low frequency component reflects the increasing trend of the horizontal deformation of retaining structures during the construction of a foundation pit. Because the current data is a continuation of the previous state, there is a certain correlation between the items of the time series. The CNN with convolutional kernel is good at extracting the data features and the dependencies among the data, therefore CNN is adopted to predict the low frequency component. The architecture of a CNN network is usually composed of one input layer, several convolutional layers, several pooling layers, one fully connected layer, and one output layer, and the pooling layers are optional for CNN. More information can be retained without pooling layer which is helpful in improving the accuracy and robustness of the model. For the adopted CNN model, there are two convolutional layers, one fully connected layer, and no pooling layer.
Three variables, as HL, R and Rm, are optional for the CNN model, which means three sequences are needed before optimizing. And the optional input data set for CNN model denotes as \(V_{{{\text{CNN}}}}\), and is presented as,
Based on the Copula analysis, previous items of the HL have the highest correlation with its current item, comparing to the daily rainfall and average rainfall. Therefore, the optimized input data set for CNN at time t, denoted as \(V_{{{\text{CNN}}}}^{*}\), is presented as,
With the input of Eqs. (9) or (10), the output of the CNN model is one value of the predicted low frequent component at time t, denoted as HLp(t). Figure 1 shows the one-dimensional convolutional kernel sliding over the optional and optimized input. The kernel width is set to be 3 for the two inputs, but the heights for the optional and optimized inputs are 3 and 1, respectively, as show in Fig. 1.
Furthermore, for one dimensional convolution, the k-th convolution is to extract the feature graph Yk of the kernel by performing operations on the data Xij within the kernel. The convolution operation formula is
where, the width and the heigh are determined by the kernel size; \(\otimes\) represents convolutional operation; Wij is the weight coefficient of the k-th kernel in the layer; bij is the bias coefficient of the k-th kernel in the layer. g(x) is the RELU activation function with
And for each time, the training of the CNN is based on the mean square error MSE(HL), which depend on the difference between the predicted value HLp(t)and the actual value HL(t) at time t, as
The LSTM neural network for prediction of H H
For high frequency component, its changes are quite complex and show significant volatility. According to previous studies, the LSTM model provides good prediction in time series with volatility62,63. Therefore, LSTM was adopted to predict the high frequency component. And for the LSTM model, there are one hidden layer and 50 neurons adopted, and the optional input data set, denoted as \(V_{{{\text{LSTM}}}}\) with,
Based on the Copula analysis, the correlation between the items of the high-frequency component is relatively low comparing to the daily rainfall. Therefore, the optimized input data set \(V_{{{\text{LSTM}}}}^{*}\) is supposed to be one dimensional array as,
And with the input of Eqs. (14) or (15), the output for the model is the predicted high frequency component at time t, denoted as HHp(t). Furthermore, the training of the LSTM is based on the mean square error MSE(HH) as,
where, HH(t) are the actual frequency components at time t.
The ANN deformation prediction model
Based on the WT method, Copula method, CNN and LSTM neural network, an ANN deformation prediction model for foundation pit was proposed with the flowchart shown in Fig. 2. The on-site measuring deformation time series obtained is denoted as H(t−1), H(t−2),⋯, H(t−n). Based on Fig. 2, the procedure of the ANN model is described as following.
Step 1, perform wavelet decomposition, decompose the time series H into two sub-sequences, HL and HH.
Step 2, use Copula method to analyze the correlation of the components HL and HH with different variables, and determine and optimize the input variables of the ANN model.
Step 3, input the obtained data of the input variables into the CNN and LSTM neural network, and establish CNN and LSTM models by training these neural networks.
Step 4, use the CNN and LSTM neural network to predict low frequency components HLp(t) to HLp(t + m), and high frequency components HHp(t) to HHp(t + m), respectively.
Step 5, add the corresponding low-frequency and high-frequency components to obtain the final predicted total deformation. That is,
where, Hp(t), Hp(t + 1),…, Hp(t + m) are the prediction total deformations for the time t to the time t + m.
The CNN neural network model adopts rolling training and prediction method, as shown in Fig. 3. Assuming that a new deformation data H(t) is obtained at time t, and thus the low frequency components HL(t), HL(t−1)…, HL (1) can be obtained by wavelet decomposition. By comparing the predicted low frequency component HLp(t) with the corresponding actual value HL(t), the mean square error MSE(HL) can be calculated, and the CNN model is then trained and updated. And then the input variables with new obtained data are input into the updated CNN model to predict the next item of the time series, is denoted as next-day prediction. And at each subsequent time, a new deformation data is obtained, the training and prediction process is repeated again as time t, as rolling training and prediction. If multi-day prediction is required, the corresponding input data can be replaced by the predicted values but without updating the CNN model, as the multiple-day prediction at time t−1 shown in Fig. 3.
The LSTM neural network also adopts rolling training and prediction method, as shown in Fig. 4. The LSTM neural network is trained daily according to the MSE(HH). After each training step, the parameters of the LSTM model are updated accordingly. Then the next day prediction with the updated LSTM model is conducted. For each subsequent moment, a new measurement deformation data will be obtained and the new iterative training is then conducted. If multi-day prediction is required, the corresponding daily rainfall can be obtained from weather forecasting without updating the LSTM model, as the multiple-day prediction at time t−1 shown in Fig. 4. And the predicted values of the low and high frequency components at the corresponding moment are added to obtain the final prediction results of the deformation using Eq. (17).
Case study
Project profile
A deep foundation pit project in Chengdu City, China is shown in Fig. 5. The excavation depth of the foundation pit is 11.5 m to 14.3 m, and the width and length of the foundation pit plan are 114 m and 182 m respectively. There are seven exploratory borings, denoted as K1 to K7, along the A-A section in Fig. 5, and the obtained geological profile is shown in Fig. 6. The surface of the construction site is covered with approximately 0.5 m of plain fill soil; The underlying expansive soil layer has a thickness about 0.7 m to 12.7 m; fully-weathered, strongly weathered and moderately-weathered argillaceous sandstone are distributed below the expansive soil layer. The expansive layer is widely distributed in the construction site. The test results of undisturbed soil samples retrieved from the expansive soil layers show that the mineral composition, Atterberg Limits, and swelling properties of soil samples at different depths are basically the same. However, the water content of shallow expansive layer is significantly higher than that of deep expansive layer, resulting in large differences in both strength and deformation parameters, as shown in Table 1.
Two different retaining schemes were adopted for the foundation pit, as shown in Fig. 7. The first scheme is the pile anchor support scheme, which is used on the south, north, and east sides of the foundation pit; and the second scheme is slope excavating at the upper part and supporting the lower part by cantilever piles, which is used on the west side. The retaining structures at I-I section adopt the first scheme (Fig. 7a), with an excavation depth of 13.2 m. The retaining piles have a diameter of 1.2 m and length of 19.2 m, the spacing between the piles is 2.0 m, and the embedded depth of the retaining piles is 6.0 m. At the depth of 3.6 m, a row of prestressed anchor cables with a length of 22.6 m is set for the retaining piles. And the soil between the piles is sealed using a reinforcement mat with shotcrete. The retaining structures at II-II section adopt the second scheme (Fig. 7b), with an excavation depth of 13.9 m. The retaining piles have a diameter of 1.2 m and length of 14.9 m respectively, and the spacing between the piles is 2.0 m. The embedded depth of the retaining piles is 6.0 m. The depth of the slope excavation at this section is 5 m with an inclination of 1: 1.25, and a platform with a width of 5.0 m was designed behind the retaining piles. A 1.5 m high rubble concrete retaining wall is constructed at the foot of the excavation slope.
Monitoring results
The construction of retaining piles for the foundation pit were finished before November 24th, 2020. After then, the foundation pit was excavated in layers, and the monitoring of the horizontal deformation at the top of retaining piles began at the same time. As shown in Fig. 4, 24 horizontal deformation measurement points, denoted as ZA1 to ZA24, were arranged on the top of the retaining piles. The monitored horizontal deformations for the different measurement points on the top of the retaining piles are shown in Fig. 8.
According to the results in Fig. 8, the whole process of these deformation curves of the retaining piles at different measuring points can be divided into three types according to their developing trend, as stable, less stable and unstable types, respectively, and typical deformation curves for the three types are shown in Fig. 9a. Construction conditions and rainfall during the deformation monitoring period are also shown in Fig. 9a. According to the Chinese code (GB 50497-2019)69, the early warning values for the cumulative horizontal displacement and displacement rate for the retaining piles of the foundation pit in the study are 30 mm and 3 mm/day, respectively. The rainfall in the region began to increase in late February, and the deformation of ZA5, ZA7, and ZA13 measuring points also significantly increased. As for the stable type deformation curve of ZA13, the deformation gradually stabilized in late March and the final deformation does not exceed the warning value, indicating that the soils and retaining structures near the monitoring point were under stable state. While for the unstable curve of ZA5 and less the stable curve of ZA7, although their deformation rates were less than 3 mm during the period from February to April, their total deformation exceeded 30 mm in mid and late April, respectively, after a period of accumulation, which indication that some zones of the soil strata near the measuring points were under the post-failure stress state and there might be a potential risk of damage to the support structures. At present, the prediction of deformation for foundation is mainly carried out for the stable-typed deformation curves. If the development of less stable and unstable types of the deformation curves can be accurately predicted, it might provide an effective approach for early risk warning for deep foundation pits.
In March, the rainfall increased gradually, and the horizontal deformation of the measurement point ZA5 exceeded 30 mm in mid-April. As shown in Fig. 9b, in order to control the deformation, the back-pressure was applied locally on the north side of the bottom of the foundation pit in late-April, shown as in Fig. 9b at Section I-I. Figure 10 shows photographs of the foundation pit before the back-pressure applying. The long-term rainfall and rainwater infiltration induced water seeped out of the soil between the piles; cracks appeared between the piles and soils, on the slab and shallow expansive soil layer, and between the crown beam and slab. In late-May, the maximum deformation rate at ZA5 reached 7.6 mm/day. In order to further control the deformation and prevent collapse of the foundation pit, partial excavations outside of the retaining piles both on the north and south sides of the foundation pit were carried out on June 2nd, as illustrated in Fig. 9b with Section I-I, after which the deformation rate slowed down. And at the end of the construction of the basement on mid-June, the horizontal displacement of ZA5, near the middle of the north side, gradually stabilized after reaching 142.1 mm. Due to the unique engineering properties, expansive soil poses a significant risk of instability in foundation pits under rainfall, and reasonable prevention measures need to be adopted as early as possible.
Results
The input variables for the ANN deformation prediction model
The decomposition results for the deformation curves of ZA5, ZA7 and ZA13 is shown in Fig. 11. The Copula method was programmed using MATLAB. And then, the value of τ for both the low frequency component HL(t), and high frequency component HH(t) with different random variables, are calculated, as shown in Fig. 12.
As shown in Fig. 12a, HL(t) has high correlation with HL(t−n), and for n less than or equal to 9 days, the values of τ are greater than 0.9. The average rainfall has medium correlation with ∆HL(t), with highest value 0.616 with n = 11, while the daily rainfall has low to medium correlation with ∆HL(t) within the past 12 days. The results of the correlation analysis imply that the comprehensive impact of various influence factors, including previous rainfall, is reflected in the development trend of the time series itself. Therefore, the optimized input data for the CNN was supposed to be the values of HL within previous 9 days. And as shown in Fig. 12b, HH(t) has relatively low correlation with HH(t−n), and HH(t) is moderately correlated with the rainfall R at current time and previous 4 days. Therefore, the short-term daily rainfall can be an optimized selected for the LSTM model to predict HH.
For the CNN model, the initial learning rate is 0.01, and the maximum number of training times in a single day is 500 times. Ten different inputs were selected for the CNN model for ZA5, as in Fig. 13. The different inputs for the CNN model are defined as Eqs. (9) and (10). The average error for ZA5 in the year of 2020, as shown in Fig. 13, with the input \(V_{{{\text{CNN}}}}^{*} ({\text{n}})\) and n = 2, 3,.., 9 were 12.83%, 7.92%, 7.63%, 7.25%, 4.32%, 11.20%, 7.89% and 7.64%, and with the input \(V_{{{\text{CNN}}}}^{{}} (11)\) was 10.12% respectively. \(V_{{{\text{CNN}}}}^{*} (5)\) with the input of the low frequency components of the previous 5 days yields the highest accuracy in prediction within this period. And in the entire prediction process, the relative error of all prediction results with different input is less than 20%, as in Fig. 13.
For the LSTM neural network, the initial learning rate is 0.005, and the maximum training number is 500 times per day. Two different inputs were selected for the LSTM model for ZA5, as shown in Fig. 14. The definitions for the input of the LSTM model are defined as Eqs. (14) and (15). The comparison of the absolute error shows that with input \(V_{{{\text{LSTM}}}}^{*} (5)\), the daily rainfall at the current and previous 4 days, results higher prediction accuracy.
Deformation prediction results and early risk warning
The deformations of ZA5, ZA7 and ZA13 for the deep foundation pit were predicted by the proposed ANN model with the input data set \(V_{{{\text{CNN}}}}^{*} (5)\) and \(V_{{{\text{LSTM}}}}^{*} (5)\). The data obtained between November 24th and December 4th, 2020, were used as initial training data, with 6 training data sets for both the CNN and LSTM models. The rainfall data in Fig. 9a was used for the deformation prediction of all the three monitoring points of ZA5, ZA7 and ZA13. After the initial model is established, daily rolling training and prediction were carried out. Assuming that the current moment was April 13th, 2021, and the rolling training and prediction was carried out on December 5th, 2020 to April 13th, 2021, during which there are 130 deformation data and 130 daily rainfall data. Before April 13th, 2021, the next-day prediction values are present, and after April 13th, 2021, the 15-day prediction values are presented in Figs. 11 and 15. For each measured point, the initial model was established using only 11 displacement data and 11 rainfall data obtained from November 24th to December 4th, 2020, which can be constructed to 6 training data sets for the ANN model. During the subsequent next-day prediction of rolling training and prediction period from December 5th, 2020 to April 13th, 2021, 130 displacement data and 130 rainfall data were obtained, which combined with the previous data can be constructed to 130 training data sets, and 130 predicting deformation data were obtained correspondingly. On April 14th, 2021, a 15-day prediction was conducted without training updates, during which 15 rainfall data from weather forecasting were input and 15 predicted deformations were obtained. For the 3 measured points, as ZA5, ZA7 and ZA13, the ANN model predicts a total of 435 deformation data, with 145 data for each measurement point, and the comparison between the predicted and the measured data is shown in Figs. 11 and 15. The comparison shows high prediction accuracy with the ANN model in the case of small amount measured data.
The actual deformation value of ZA5 on April 3th, 2021 was 24.53 mm, and the 15-day prediction results of the ANN model on that day shows that 11 days later, on April 14th, the deformation value of ZA5 would exceed the warning value of 30 mm. So, the ANN model promoted risk warning for the first time on April 3th, 2021, which is much earlier than the actual date when the deformation exceeded 30 mm. According to the subsequent measured data, it was found that the deformation value of ZA5 exceeded 30 mm on April 17th, 2021. For monitoring point ZA7, on April 13th, 2021, the ANN model predicted that its deformation would exceed the warning value 30 mm on April 27th, 2021, thus the ANN model prompted the second risk warning. The measured data showed that the deformation of ZA7 exceeded the warning value 30 mm on April 29th, 2021. The proposed ANN model accurately predicts the time when the deformation reaches the warning value, and the time of the risk warning is greatly advanced, which is helpful for preventing major engineering catastrophes.
Conclusion
Regarding the deformation prediction of deep foundation pits, an ANN deformation prediction model is proposed based on the WT, Copula method, CNN and LSTM neural networks. The deformation predictions of a deep foundation pit were conducted by the proposed ANN model, and the following conclusions were drawn:
-
1.
The proposed ANN deformation prediction model decomposes the deformation of the deep foundation pit into a low frequency component and a high frequency component, and predicts the two components with CNN and LSTM neural network respectively. The CNN neural network was adopted to predict the low frequency component, and the input variables were selected as the previous low frequency components; and the LSTM neural network was adopted to predict the high frequency component, and the input variables were selected as the current and previous daily rainfalls. Only with a few variables, the proposed model can achieve high prediction accuracy.
-
2.
The parameters of the CNN and LSTM neural networks were updated with the rolling training each day, and the subsequent predictions are conducted with the updated parameters, which guarantees the ANN model can reflect the development trend of the deformation and gain a high prediction accuracy for all the different types of deformation curves. The proposed ANN model can accurately predict the time when the deformation reaches the warning value, and the time of the risk warning is greatly advanced, which is helpful for preventing major engineering catastrophes.
Data availability
The data used to support the findings of this study are available from the corresponding author upon request.
References
Elbaz, K., Shen, S., Tan, Y. & Cheng, W. Investigation into performance of deep excavation in sand covered karst: A case report. Soils Found. 58(04), 1042–1058 (2018).
Botero, E., Ovando, E. & Mendoza, M. J. Successful prediction of slope failure in an excavation trial. Eng. Fail. Anal. 109, 104392 (2020).
Xu, X. et al. Seepage failure of a foundation pit with confined aquifer layers and its reconstruction. Engineering failure analysis 138, 106366 (2022).
Jiang, W. & Tan, Y. Overview on failures of urban underground infrastructures in complex geological conditions due to heavy rainfall in China during 1994–2018. Sustain. Cities Soc. 76(01), 103509 (2021).
Li, J. & Zhang, L. Study of desiccation crack initiation and development at ground surface. Eng. Geol. 123(04), 347–358 (2011).
Zhang, J., Qiao, G., Feng, T., Zhao, Y. & Zhang, C. Dynamic back analysis of soil deformation during the construction of deep cantilever foundation pits. Sci. Rep. 12(01), 13112 (2022).
Yang, T. et al. Analysis of the deformation law of deep and large foundation pits in soft soil areas. Front. Earth Sci. 10, 828354 (2022).
Zhang, J., Gao, Y., Feng, T., Yang, J. & Yang, F. Upper-bound finite-element analysis of axisymmetric problems using a mesh adaptive strategy. Comput. Geotech. 102, 148–154 (2018).
Huang, K., Yang, W., Ma, Q. & An, Y. Influence of foundation excavation pit on adjacent metro tunnel using fluid-solid mechanics theory. Sci. Technol. 50(01), 198–205 (2019).
Dan, K. & Sahu, R. B. An inverse analysis for parameter estimation of braced excavation in soft clay using non-linear programming. Ind. Geotech. J. 45, 291–303 (2015).
Knabe, T., Schweiger, H. F. & Schanz, T. Calibration of constitutive parameters by inverse analysis for a geotechnical boundary problem. Can. Geotech. J. 49(02), 170–183 (2012).
Wei, G., Guo, B. & Wang, Z. Analysis of influence of deformation modes of retaining structures on deformation of a side shield tunnel. Sci. Rep. 12, 19974 (2023).
Xing, Y., Xie, D. & Li, Z. Study on effective stress parameter of unsaturated soil. J. Hydraul. Eng. 31, 77–81 (2000).
Ledesma, A., Gens, A. & Alonso, E. E. Parameter and variance estimation in geotechnical backanalysis using prior information. Int. J. Numer. Anal. Methods 20, 119–141 (1996).
Deng, J. & Lee, C. F. Displacement back analysis for a steep slope at the Tree Gorges Project site. Int. J. Rock. Mech. Min. 38(02), 259–268 (2001).
Zhu, H., Yang, L. & Tadashi, H. Back analysis of construction of deep excavation and deformation prediction. Chin. J. Geotech. Eng. 20(04), 33–38 (1998).
Finno, R. J. & Calvello, M. Supported excavations: Observational method and inverse modeling. J. Geotech. Geoenviron. 131(07), 826–836 (2005).
Tang, Y. & Kung, G. T. Investigating the effect of soil models on deformations caused by braced excavations through an inverse-analysis technique. Comput. Geotech. 37(06), 769–780 (2010).
Ye, S., Ding, S., Gong, X., Gao, S. & Chen, C. Monitoring and numerical simulation of deep foundation pit of a subway station in Lanzhou. Chin. J. Geotech. Eng. 40, 177–182 (2018).
Burridge, R., Hoop, M. V. D., Miller, D. & Spencer, C. Multiparameter inversion in anisotropic elastic media. Geophys. J. Int. 134(03), 757–777 (2015).
Zhu, H. & Liu, X. Comparison study of mixed optimal methods based on genetic algorithm in back analysis. Chin. J. Rock Mech. Eng. 22, 197–202 (2003).
Gu, Y. & Gu, C. Optimized back analysis of multiple parameters based on improved objective function. J. Hydraul. Eng. 39(08), 969–975 (2008).
Hashash, Y., Levasseur, S., Osouli, A., Finno, R. & Malecot, Y. Comparison of two inverse analysis techniques for learning deep excavation response. Comput. Geotech. 37(03), 323–333 (2010).
Ran, T., Liu, D. A., Mei, S. H., Wang, W. & Tan, L. Intelligent feedback analysis on a deep excavation for the gravity anchorage foundation of a super suspension bridge. Chin. J. Rock Mech. Eng. 38(S1), 2898–2912 (2019).
Zhou, C., Yin, K., Cao, Y., Ahmed, B. & Fu, X. A novel method for landslide displacement prediction by integrating advanced computational intelligence algorithms. Sci. Rep. 8(01), 7287 (2018).
van Asch, T. W. J., Malet, J. P., van Beek, L. P. & Amitrano, D. Techniques, issues and advances in numerical modelling of landslide hazard. Bull. Soc. Géol. Fr. 178(02), 65–88 (2007).
Corominas, J., Moya, J., Ledesma, A., Lloret, A. & Gili, J. A. Prediction of ground displacements and velocities from groundwater level changes at the Vallcebre landslide. Landslides 2(02), 83–96 (2005).
Yu, Y., Song, M. & Song, J. A novel hyper-parameters selection approach for support vector machines to predict time series. J. Comput. 7(12), 2921–2930 (2012).
Lv, Y., Liu, T., Ma, J., Wei, S. & Gao, C. Study on settlement prediction model of deep foundation pit in sand and pebble strata based on grey theory and BP neural network. Arab. J. Geosci. 13(23), 1238 (2020).
Song, Y. & Nie, D. Verhulst mode for predicting foundation settlement. J. Rock Soil Mech. 24, 123–126 (2003).
Du, J., Yin, K. & Lacasse, S. Displacement prediction in colluvial landslides, three Gorges reservoir, China. Landslides 10(02), 203–218 (2013).
Zhou, C., Yin, K., Cao, Y. & Ahmed, B. Application of time series analysis and PSO-SVM model in predicting the Bazimen landslide in the Tree Gorges Reservoir. China. Eng. Geol. 204, 108–120 (2016).
Goh, A. T. C., Wong, K. S. & Broms, B. B. Estimation of lateral wall movements in braced excavations using neural networks. Can. Geotech. J. 32(06), 1059–1064 (1995).
Zhang, C., Li, J. & Yong, H. Application of optimized grey discrete Verhulst-BP neural network model in settlement prediction of foundation pit. J. Environ. Earth Sci. 78(15), 441 (2019).
Li, Z., Hu, X. & Chen, C. Multi-factor settlement prediction around foundation pit based on SSA-gradient descent model. Sci. Rep. 12, 19778 (2022).
Guo, Q., Jia, Z. & Jing, Y. Deformation prediction of foundation pit based on finite element and Elman neural network. J. China Sci. Pap. 14(10), 1072–1077 (2019).
Hataf, N. & Soleimanbeigi, A. Prediction of settlement of shallow foundations on reinforced soils using neural networks. Geosynth. Int. 13(6), 161–170 (2006).
Azadi, M., Pourakbar, S. & Kashf, A. Assessment of optimum settlement of structure adjacent urban tunnel by using neural network methods. Tunn. Undergr. Sp. Technol. 37(2), 1–9 (2013).
Leu, S. S. & Lo, H. C. Neural-network-based regression model of ground surface settlement induced by deep excavation. Autom. Constr. 13(3), 279–289 (2004).
Ocak, I. & Seker, S. E. Calculation of surface settlements caused by EPBM tunneling using artifcial neural network, SVM, and Gaussian processes. Environ. Earth Sci. 70(3), 1263–1276 (2013).
Tarawneh, B. & Imam, R. Regression versus artifcial neural networks: Predicting pile setup from empirical data. KSCE J. Civ. Eng. 18(4), 1018–1027 (2014).
Zhang, L., Gao, T., Cai, G. & Koh, L. H. Research on electric vehicle charging safety warning model based on back propagation neural network optimized by improved gray wolf algorithm. J. Energy Storage 49, 104092 (2022).
Erzin, Y. & Gul, T. O. The use of neural networks for the prediction of the settlement of one-way footings on cohesionless soils based on standard penetration test. Neural Comput. Appl. 24(3–4), 891–900 (2014).
Freitag, S., Cao, B., Ninic, J. & Meschke, G. Recurrent neural networks and proper orthogonal decomposition with interval data for real-time predictions of mechanised tunnelling processes. Comput. Struct. 207, 258–273 (2017).
Li, J., Dong, X., Ruan, S. & Shi, L. A parallel integrated learning technique of improved particle swarm optimization and BP neural network and its application. Sci. Rep. 12, 19325 (2022).
Zhu, C. et al. Comparison of GA-BP and PSO-BP neural network models with initial BP model for rainfall-induced landslides risk assessment in regional scale: A case study in Sichuan. China Nat. Hazards 100(01), 173–204 (2020).
Zhu, X., Zhu, W., Lin, G. & Ke, Y. H. Study on land subsidence simulation based on a back-propagation neural network combined with the sparrow search algorithm. Remote Sens. 15(12), 2978 (2023).
Kim, B. S. & Kim, T. G. Cooperation of simulation and data model for performance analysis of complex systems. Int. J. Simul. Model. 18(4), 608–619 (2019).
Yamashita, R., Nishio, M., Do, R. K. G. & Togashi, K. Convolutional neural networks: An overview and application in radiology. Insights Imaging 9(4), 611–629 (2018).
Liu, S. et al. Data source authentication of synchrophasor measurement devices based on 1D-CNN and GRU. Electric Power Syst. Res. 196, 107207 (2021).
Yao, D., Li, B., Liu, H., Yang, J. & Jia, L. Remaining useful life prediction of roller bearings based on improved 1D-CNN and simple recurrent unit. Measurement 175, 109166 (2021).
Ghimire, S. et al. Streamflow prediction using an integrated methodology based on convolutional neural network and long short-term memory networks. Scientific Reports 11, 17497 (2021).
Lewinson, E. Python for Finance Cookbook: Over 50 Recipes for Applying Modern Python Libraries to Financial Data Analysis 464 (Packt Publishing, 2020).
Wibawa, A. P. et al. Time-series analysis with smoothed Convolutional Neural Network. J. Big Data 9(1), 44 (2022).
Zhong, Z. et al. Convolutional neural network-based seismic fragility analysis of subway station structure considering spatial variation of site shear-wave velocity. Comput. Geotech. 163(2), 105741 (2023).
Wang, K. et al. Multiple convolutional neural networks for multivariate time series prediction. Neurocomputing 360, 107–119 (2019).
ArunKumar, K. E., Kalaga, D. V., Kumar, C. M. S., Kawaji, M. & Brenza, T. M. Forecasting of COVID-19 using deep layer Recurrent Neural Networks (RNNs) with Gated Recurrent Units (GRUs) and Long Short-Term Memory (LSTM) cells. Chaos Solitons Fract. 146(01), 110861 (2021).
Canizo, M., Triguero, I., Conde, A. & Onieva, E. Multi-head CNN–RNN for multi-time series anomaly detection: An industrial case study. Neurocomputing 363, 246–260 (2019).
He, W. et al. Comparing SNNs and RNNs on neuromorphic vision datasets: Similarities and diferences. Neural Netw. 132, 108–120 (2020).
Cinar, Y. G., Mirisaee, H., Goswami, P., Gaussier, E. & Aït-Bachir, A. Period-aware content attention RNNs for time series forecasting with missing values. Neurocomputing 312, 177–186 (2018).
Hochreiter, S. & Schmidhuber, J. J. Long short-term memory. Neural Comput. 9(08), 1735–1780 (1997).
Fischer, T. & Krauss, C. Deep learning with long short-term memory networks for financial market predictions. Eur. J. Oper. Res. 270(2), 654–669 (2018).
Baek, Y. & Kim, H. Y. ModAugNet: A new forecasting framework for stock market index value with an overfitting prevention LSTM module and a prediction LSTM module. Expert Syst. Appl. 113, 457–480 (2018).
Rodriguez, A. X. & Salazar, D. A. Methodology for the prediction of fluid production in the waterflooding process based on multivariate long-short term memory neural networks. J. Pet. Sci. Eng. 208, 109715 (2022).
Peng, Z. & Wang, G. Study on optimal selection of wavelet vanishing moments for ECG denoising. Sci. Rep. 7, 4564 (2017).
Sarbaz, Y. & Abedi, B. Presenting a new decision support system for screening parkinson’s disease patients using symlet wavelet. Biomed. Eng. 31(04), 1950026 (2019).
Parzen, E. On estimation of a probability density function and mode. Ann. Math. Stat. 33(03), 1065–1076 (1962).
Fan, J. & Yao, Q. Nonlinear time series: Nonparametric and parametric methods. Springer Ser. Stat. 62, 629–630 (2005).
Ministry of Housing and Urban-Rural Development of the People's Republic of China. Technical Standard for Monitoring of Building Excavation Engineering (GB 50497–2019) (China Planning Press, 2019).
Acknowledgements
This study was financially supported by the National Natural Science Foundation of China (41977235).
Author information
Authors and Affiliations
Contributions
X.W. proposed ideas and drafted the manuscript; S.C. performed the in-situ measurement and collected the measuring deformation data; R.C. programmed for the deformation prediction models; Z.W. helped perform the analysis of the measuring data; Y.L. checked and edited the manuscript.
Corresponding author
Ethics declarations
Competing interests
The authors declare no competing interests.
Additional information
Publisher's note
Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
Rights and permissions
Open Access This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made. The images or other third party material in this article are included in the article's Creative Commons licence, unless indicated otherwise in a credit line to the material. If material is not included in the article's Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/.
About this article
Cite this article
Wei, X., Cheng, S., Chen, R. et al. ANN deformation prediction model for deep foundation pit with considering the influence of rainfall. Sci Rep 13, 22664 (2023). https://doi.org/10.1038/s41598-023-49579-z