Abstract
There is a general need to change hydropower operational regimes to balance the growing contribution of variable renewable energy sources in power systems. Quantifying the burden on generation equipment is increasingly uncertain and difficult. Here, we propose a framework combining technical and economic indicators to analyze primary frequency control (PFC) on a timescale of seconds. We develop a model integrating hydraulic, mechanical, and electrical subsystems to characterize efficiency loss, wear and fatigue, regulation mileage, and frequency quality. We evaluate burden relief strategies under three idealized remuneration schemes for PFC, inspired by those used in Sweden, the USA, and China, respectively. We show how burden and compensation vary under future scenarios of renewable power systems. Our framework can be used by producers to develop favorable operation strategies that reduce burden and increase economic value, and by transmission system operators to provide insights on the relation between incentive structures and regulating performance.
Similar content being viewed by others
Introduction
With current trends toward de-carbonization in the electricity sector1, the growing role of carbon free variable renewable energy (VRE) sources is profoundly changing power systems worldwide2,3,4. Effectively and efficiently dealing with the generation intermittency of VRE is a growing research field5,6,7,8. Consequences from high VRE integration9 will vary between power systems, and can be anticipated on a wide range of timescales. Fewer heavy, synchronously connected generators imply less inertia10, crucial for system stability on timescales of seconds. Coupled with atmospheric volatility that produces minute scale variations in VRE output, higher grid frequency volatility occurs on timescales where grid balancing from primary frequency control (PFC) is supposed to be most active—from seconds to minutes. This is the main focus of this paper. Common timescales adopted in studies on feasibility of renewable power systems is down to five-minutes11, we place emphasis on shorter-term system dynamic behaviors based on timescale of seconds.
Hydropower, the largest global renewable energy source, shoulders a large portion of the regulation and balancing duty in many power systems, which may include PFC, automatic generation control (AGC), voltage control, spinning reserve, standing reserve, and black start capability12, 13. The cost to hydropower units of providing grid ancillary services14,15,16,17,18 is approached here for PFC by considering physical characteristics and their relationship with economical remuneration schemes.
From the aspects of the physical features, we focus on (1) increased wear and fatigue19, 20 on hydropower machinery and (2) reduced production when efficiency losses are incurred during off-design operation. Wear and fatigue issue have been investigated regarding the service lifetime of runners21,22,23 and bearings24, 25 of Francis turbines and Kaplan turbines26,27,28,29, including the influence of PFC on wear and tear30, 31 and strategies on hydro life extension32. These works address the issue on detailed components from the aspects of hydraulics and tribology. In terms of reducing efficiency loss, investigations have been conducted based on small to large spatial scale studies, e.g., turbine design32, 33 and strategies of operation and power dispatch34,35,36,37,38,39.
From an economic perspective, ancillary service compensation mechanisms for frequency and voltage control are generally provided in regions with mature markets, including Europe (including Sweden), North America (including the USA), Oceania, and South America12, 40, 41. PFC is a differentiated product in various countries, generally traded through annual bilateral contracts and tendering processes12, 40. Though procurement methods, remuneration methods, remuneration structures, and detailed characteristics of the markets for PFC are categorized and compared11, 42, 43, the costs associated with PFC are often difficult to identify, as few regions in the world have an explicit ancillary service market to procure PFC service42, and new market designs for PFC service are being actively explored42,43,44. China's electricity market has been developing in recent years45 and the importance of ancillary services to VRE integration has become a key issue13. However, the Chinese market is still in the exploratory phase13, 45, and generally speaking, there is no standard market mechanism for procurement and compensation of ancillary services13, 46.
Many previous works highlight the importance of flexible hydropower regulation in achieving high VRE penetration11, 47, 48, trends in hydropower operations in the face of growing VRE49, and underestimated challenges are discussed11; however detailed research to support flexibility assumptions from the control, operation, and economic perspective of the hydropower community itself is rare. In one example, a fully renewable Nordic power system was presumed feasible, from a variability point of view, if hydropower provides proper regulation9.
Many hydropower owners are experiencing accelerated degradation of powertrain components due to evolving power system demands for flexibility50. A higher volume of balancing actions is driving producers to supervise costs more carefully, and transmission system operators (TSOs) to closely monitor ancillary service quality. As conventional producers operating at cost face lower utilization rates and even negative prices51, both producers and TSOs may be motivated to optimize balancing operations for higher revenues. However, the tools and models needed to minimize regulation burden for producers, maintain good regulation performance for TSOs, and achieve reasonable compensation structures for both sides are currently lacking. To bridge this gap, we conduct a systematic study to quantify and evaluate the unforeseen costs and trade-offs between burden and performance of regulation.
Here, we propose a framework combining technical operation strategies with economic indicators to obtain relative values of regulation burden and performance of PFC of hydropower units. To quantify, we establish a numerical hydropower plant (HPP) model with a Kaplan turbine, calibrated with measurements from two Swedish plants (Methods). We study Kaplan turbines since they are more complicated in terms of control (Supplementary Note 1). Hence, the methodology and results can easily be simplified and extended to other turbine types. Comparing to previous relevant works on Kaplan turbines, e.g., efficiency improvement through draft tube design52, 53 and control methods optimizations54, 55, and operating performance enhancements56, our model is interdisciplinary, including dynamics of hydraulic–mechanical–electrical subsystems. We also consider burden relief strategies and their implications under three idealized remuneration schemes for PFC, inspired by those used in Sweden, in parts of the USA, and in East China. They differ in underlying pricing philosophies based on three aspects for PFC: reserved capacity, actual utilization, and a comparison between actual and ideal contribution. Finally, we utilize the model to analyze how regulation burden and compensation for hydropower units could vary under future VRE scenarios.
Our work can be beneficial to both hydropower producers and TSOs: our framework can be a robust tool for producers to achieve favorable operation strategies for relieving burden and obtaining compensation, and we provide insights for TSOs interested in evaluating if their current remuneration structures give the desired incentives. Our framework contemplates power system level and component level issues, covering a wide range of scales under different VRE integration scenarios and operational conditions for different compensation structures from three continents.
Results
Framework for quantifying and evaluating the regulation
In the framework (Fig. 1), burden is represented by efficiency loss and wear/fatigue, and regulation performance is evaluated using regulation mileage and frequency quality. The technique to quantify burden and regulation performance and the corresponding indicators that serve as the main outputs of the numerical simulations are introduced in Methods.
Optimizing the regulation conditions of hydropower units is the key to easing their incurred burden. We comprehensively compare various regulation conditions by varying the turbine governor parameters (Ep1 to Ep3 in Supplementary Table 2), operating set-points (seven points in Supplementary Fig. 16) and regulation strategies (Methods). Under different conditions, we concisely analyze the following two idealized pricing schemes of regulation payments: strength payment, mileage payment, and contribution payment that are inspired, respectively, by the ones used by the TSO Svenska Kraftnät (SvK) in Sweden, by PJM Interconnection LLC (PJM) that is a regional transmission organization in the USA57, and by East China Energy Regulatory Bureau of National Energy Administration of China58. The schemes are detailed in Methods.
We adopt the proposed numerical model to conduct various simulations (Fig. 2. and Supplementary Note 6), of which the length is 24 h and timestep is 0.02 s, to test the above-mentioned indicators based on two real HPPs in Sweden (Methods). The input signal of Model 1 and Model 3 is a sequence of measured one-day (24-hour) Nordic grid frequency, and its sampling time is 1.0 s. The net load9, 59 and the frequency are introduced in Supplementary Note 3 and Supplementary Note 6 (including Supplementary Fig. 14 and Supplementary Fig. 15). All the variables in this paper are introduced in Nomenclature in Supplementary Note 1.
Burden quantification
In this section, we discuss the efficiency loss, as well as wear and fatigue due to regulation. The overall results of this study under various operation conditions are shown in Table 1, and detailed results of efficiency loss are presented in Table 2. It is shown that the governor setting directly influences the efficiency loss: the lower the droop (the higher the static gain), the more efficiency loss. However, the loss is not linearly related to the droop due to the complexity and nonlinearity in the system.
We investigate the composition of efficiency loss in regulation by comparing results across different strategies. For the normal PFC (S1) in HPP 2, the maximum efficiency loss due to regulation reaches 0.44%, 0.63%, and 1.3% under Ep1, Ep2, and Ep3 setting, respectively (0.27%, 0.49%, and 0.10% for HPP 1). The difference between efficiency losses under S1 and S0 (strict on-cam) is very small, indicating that the loss due to normal PFC is mainly caused by the trajectory deviation from the set-point. The extra loss due to off-cam operation is negligible for normal PFC, but not for wear reduction strategies. The operation strategy S3 (no RB movement) leads to a considerable efficiency loss that is larger than 1.9% under the high gain setting Ep3 and mainly caused by off-cam operation, showing the economic drawback of the strategy. While the strategy S2 (small floating dead-zone on runner control) only causes a slight increase (~0.03 %) of efficiency loss compared to S1. It should be noted that relatively minor changes in efficiency could have significant fleet-wide impacts, due to the huge scale of hydropower capacity in many power systems (Supplementary Note 9).
More specifically, the turbine efficiency and the trajectory of the GV opening (GVO) and RB angle (RBA) under three simulated operating strategies are shown in Fig. 3. The yellow trajectory describes the normal PFC (S1) with the set-point selected as point 6. In this case, the off-cam phenomenon is caused by the mechanical system, e.g., backlash, delay, and servo. A more obvious off-cam operation is presented by the gray trajectory, from the S2 with a filter for RBA (0.03 pu floating dead-zone). The black trajectory shows the extreme strategy S3 that is fixing the RBs, and the trajectory is out of the measurement range, demonstrating the need of extrapolation from the fitting of efficiency.
We found that the operating set-point has a considerable influence not only on the steady-state efficiency but also on the efficiency loss in transients, as shown in Table 2. The differences between the maximum and minimum of efficiency changes under seven points are considerable (e.g., 0.800%, 1.112%, and 1.637% under Ep1 through Ep3, respectively, for HPP 2). This causes complexity in the quantifying and evaluating process. In some cases, the efficiency even increases compared to the steady-state value, as highlighted by blue in the table cell. The main explanation is that the on-cam efficiency of a set-point (e.g., point 1) is not the global maximum. During the operation, the trajectory enters into the region with higher efficiency, for example, the right upper part of the blue trajectory in Fig. 3. Supplementary Fig. 18 presents this case in a clearer manner: the instantaneous efficiency can be higher than the steady-state value (see blue lines for point 1). It is also indicated that the set-point may not be the local maximum, due to a non-optimal combinator, leading to a more obvious efficiency increase. While for point 6 where the on-cam operation has a high efficiency (close to the global maximum), the instantaneous efficiency is mostly lower, and the efficiency loss is larger than 0.4% under a very favorable operation case, namely strategy S1 with parameter set Ep1. It is worth emphasizing that a non-optimal combinator would result in less efficiency loss. Meanwhile, performance improvement projects32, 56 are common nowadays for obtaining a better combinator to achieve higher on-cam efficiency, hence the off-cam efficiency loss would be even larger due to these works.
Since the magnitude of the efficiency loss is small, it is necessary to discuss uncertainties. There are two main potential error sources. First, the error of efficiency measurement in the index test is stated to be 0.2%, which is close to the highest accuracy that can be achieved in the current hydro turbine field. Second, extrapolation from data fitting inevitably causes errors. However, the influence of these errors in individual data points is counteracted and decreased in the simulation cases of which the operation trajectory covers multiple operating points during one day. Moreover, the influence of the water head and turbine rotational speed on the turbine characteristic is ignored due to the limitation of on-site measurement data, but it is acceptable for the small disturbance conditions of this study.
In terms of wear and fatigue, the governor setting has a direct influence, as shown in Table 1. A higher droop leads to longer distance and larger amount of movements. For the GV movements, results do not differ from S1 to S3, because different strategies only affect the RB side. The burden relief strategy S2 leads to a significant decrease of both the distance and amount of RB movements, and strategy S3 totally diminishes the RB movement. The effect of strategy S2 is demonstrated in time-domain in Supplementary Fig. 19. Besides, the influence from different operating points is small, and this decreases the complexity in analysis. On this stage, we only investigate the total distance and amount of movements to reflect the wear and fatigue; the simplified burden here can be extended by studying more influencing factors, e.g., cavitational operation, different wear types, etc. The correlation between these indicators to the actual damage, maintenance time, and lifetime estimation of components is an important future work.
Regulation performance
In this section, we discuss the regulation mileage and frequency quality as crucial trade-off perspectives of the burden. As shown in Table 1 and Fig. 4, there is a high correlation between regulation mileage and static gain, 1/bp (Methods). As to the operating strategy, the wear reduction strategy S2 and S3, especially S3, lead to decreases in mileage. The results are not influenced much by the operating set-points, and this is conducive to simplify the evaluation. In terms of frequency quality, the results are presented in Table 1 and Supplementary Table 5. A larger value indicates a better frequency quality. Overall, lower droop that corresponds to higher regulation strength of the unit results in better frequency quality, based on our setting that the regulation strength of the remaining units in the grid is unchanged. The influence of off-cam operation is shown clearly: when S2 is applied, the frequency quality worsens compared to the performance of S1 under the same Ep setting. The deterioration of the frequency quality is more obvious under S3.
Comparing the frequency quality and mileage between the two cases S1 with Ep1 and S2 with Ep2, one can observe that the latter case leads to a much better frequency quality (+0.45 % for HPP 1) with a slightly larger mileage. It demonstrates an advantage of adopting S2. This also implies that the mileage mainly represents the quantity, instead of quality, of the regulation and both the mileage and frequency quality are necessary for ensuring preciseness of evaluation.
Regulation payment
Evaluating consequences of regulation payment schemes is of great importance for both power producers and TSOs. Here, we analyze three idealized schemes (Methods) inspired by the payment schemes of SvK in Sweden, PJM in the USA, and the National Energy Administration in China based on their relative payment values. Relative values of payments under different conditions are presented in Table 1, and detailed results of regulation strength and contribution payment are presented in Supplementary Table 6 and Supplementary Table 7, respectively.
Both strength payment and mileage payment lead to compensation overall aligned with the performance, as it correlates well with RB movement and frequency quality. Contribution payment reflects the performance well, when applying different regulation strategies; nevertheless, it has an opposite trend with the performance under three settings of governor parameters, because the pricing philosophy is based on the comparison with the ideal value that also varies with governor settings, instead of focusing on indicators with absolute values as in the other two payment schemes.
Compared to strategy S1, strategy S3 leads to a considerable compensation decrease while causing an obvious drop in efficiency and poor frequency quality. Therefore, S3 may not be a promising choice for producers. Alternatively, strategy S2 can be suitable for producers, because it does not result in significant compensation decline (especially for HPP 2) and can largely decrease the RB movements without deteriorating the efficiency and frequency quality too much. An important finding is a large difference in different payments under burden relief strategies S2 and S3. This illustrates the influence that payment schemes might have on operating strategies chosen by producers.
In terms of strength payment, the value for HPP 2 under S3 and Ep3 is negative, because the turbine efficiency sharply decreases in the off-cam operation and the power output after the frequency change is even smaller than the original value. However, the regulation performance of the case is positive (with +0.38% in frequency quality and 958.6 MW in mileage) since the average frequency deviation is considerably smaller than the 0.1 Hz used to determine strength. This demonstrates a limitation of strength payment: it ignores the performance of actual delivered regulation. As shown in Fig. 5, the negative strength is avoided by varying the frequency step change to −0.05 Hz from the original value 0.1 Hz: the payment increases to 63.5% from −9.9% under S3 with Ep3 for HPP2. This reflects the complexity of achieving an appropriate implementation of strength payment.
Intricate results are found for contribution payments as well. Both the ratio of contributed regulating energy (λR-avg) and the score of regulation correctness (λC) decrease from Ep1 to Ep3 (Supplementary Table 7), showing that the difficulty to achieve high scores increases with the rise of the static gain; a main reason is that the amount of the effective regulation movements (Supplementary Note 8) increases. Besides, the values of λC under strategy S3 are generally larger than the ones under strategy S2; under Ep3, the payments for strategy S2 are even lower than the ones for strategy S3. A core cause for the complex outputs is that the pricing philosophy are more sensitive to physical features in the hydropower systems.
Another key factor in contribution payment is the threshold of ER-ideal for defining the effective regulation movement (Method and Supplementary Note 8). As shown in Fig. 6, the increase of the threshold reduces the amount of effective regulation movements and improves both indicators, especially the main indicator λR-avg, which varies significantly from negative to positive values, reflecting the necessity of applying the threshold. This demonstrates that the payment value is strongly influenced by detailed settings of the remuneration scheme, revealing a benefit of applying our model as a tool for optimization.
Future scenarios of VRE integration
High VRE integration leads to generation intermittency, less inertia, and affects the damping of electro-mechanical oscillations in power systems. These three aspects contribute to grid frequency deviation, which is a representative indicator of collective dynamics and stability of power systems60. For the Nordic power grid, the number of minutes per week with the grid frequency outside the normal bandwidth has a clear growth trend since 2001, demonstrating that maintaining the frequency level at 50 ± 0.1 Hz at all times is increasingly difficult for system operators4 (Supplementary Fig. 21); Meanwhile, the increase of VRE production portion from 2001 to 2013 is shown in Supplementary Fig. 22, and it is one of the causes of worsening frequency quality.
First, regarding the increased generation intermittency and net load variability (Supplementary Note 3) caused by the enlarged share of VRE9, 59 in power systems, much previous research focused on the characteristics9, 61, 62 and countermeasures from hydropower9, 63, 64 based on long timescales, and very few studies addressed sub-hourly scales61, 62. Standard deviations of the net load of the Nordic power system in various VRE scenarios based on different timescales (>daily) are quantified, and the value could be two times larger than the current case9; VRE variability and nonlinearity in the timescale of seconds were investigated65, however the explicit relationship between the VRE integration and net load variability in the sub-hourly scale is still unclear. Second, under future VRE integration scenarios of the Nordic power system, the Nordic TSOs estimate that the kinetic energy (which indicates system inertia) of the system during low loads (typically summer nights) will be 124;GWs in 2020 and possibly as low as 80 GWs in 2025. This is much lower than the 250 GWs of the current system10. Such a significant reduction in system inertia will go against stability of power systems and demand more regulating work. Third, electro-mechanical oscillations in power systems from wind and PV penetration can lead to both detrimental and beneficial impacts66, 67; burden on hydropower units from negative damping contribution of VRE integration should be concerned and analysed.
In this section, we apply deteriorated frequency sequences (mainly caused by the net load variability, the inertial, and the damping) as simulation model inputs (Supplementary Note 10 including Supplementary Table 8 and Supplementary Fig. 23) to study the influence of future VRE scenarios on regulation burden and compensation for individual hydropower units in the timescale of seconds. Relative values of the burden and the payments under different scenarios are shown in Fig. 7, and detailed results are presented in Supplementary Table 9 and Supplementary Table 10, respectively.
In terms of the burden, wear and fatigue aspect indicated by the distance and the amount of GV and RB movements are significantly aggravated under the future scenarios. More exactly, the amount of RB movements under Scenario 5 (with the worst frequency quality) and strategy S1 is more than twice of the value under Scenario 1 for the current condition; while this can be well resolved by applying strategy S2 (Supplementary Table 9). Meanwhile, Scenario 4–5 show that the increased net load standard deviation leads to more efficiency loss, however the influence from the inertia and the damping of the system on the efficiency loss is less than 5%, because the frequency sequences of Scenarios 2–3 mainly increase the denseness of the turbine operation trajectory rather than expand it the into low efficiency areas.
As to the payment, first, strength payment inherently does not change under different frequency sequences, revealing a key drawback of it. Second, mileage payment well captures the growth trend of the burden due to its good agreement with the movements of turbine actuators. Third, contribution payment to some extent responds to the different scenarios, especially under the high static gain (Ep3) and S1.
Discussion
Within the proposed framework, we conducted comprehensive quantification of the burden and quality of hydropower regulation through simulations of two Swedish HPPs. Aiming at the system dynamic behaviors in timescale of seconds, we characterized the efficiency loss, wear and fatigue, regulation mileage, and frequency quality with respect to different operating conditions, including governor droop, operating strategy, and operating set-point. We evaluated burden relief strategies under three idealized remuneration schemes for PFC and analyzed regulation burden and compensation under different future VRE scenarios.
A complexity of the quantification lays in the influence of the physical features in the hydropower system, especially the turbine characteristics. The efficiency loss, GV and RB movements, regulation mileage, performance score, and frequency quality differ across operating conditions and turbines, indicating that site-specific analysis may be necessary to quantify the burden of regulation at each HPP. While our refined and interdisciplinary model incorporates precise HPP features, it can flexibly adapt to diverse cases and is easily revised to analyze different turbine types. By developing a framework using Kaplan turbines, machines with high complexity due to double-regulated gates and blades, an extension to more simple and common turbine types, such as Francis turbines, is straight forward. Analysis for other purposes, e.g., analysis on safety and stability, and quantifications of additional variables of interest is feasible as well. Ideally, an on-site experimental investigation could produce more accurate and stricter results by including more operating points to achieve an efficiency distribution over a wider operational range. However, this type of study is difficult to accomplish due to the huge costs of conducting the tests. In short, the methodology adopted in this study effectively makes the most of the current state of the industry.
Our work provides insights into the relationship between regulation conditions and remuneration schemes, benefitting both hydropower producers and TSOs. From the standpoint of producers, our model can be a solid tool to develop favorable operation strategies for relieving burden and procuring compensation. Another benefit is the possibility to evaluate remuneration schemes. An example is that the burden relief strategy S2 can be considered for implementation, due to its favorable overall performance on wear reduction and regulation performance. Decisions along that line will, of course, depend on the economic consequences related to the remuneration method.
For TSOs, remuneration analyses using this framework can be used to formulate detailed operating guidelines or best practices for HPPs. The results can be evaluated to investigate whether the different implementations of different remuneration philosophies give the desired incentives and deliveries. The three payment approaches examined here represent different pricing philosophies: strength payment mainly compensating for reserved capacity by scaling the clearing price with the regulation strength; mileage payment evaluating the actual utilization with respect to regulation mileage; and contribution payment lies on comparisons between actual and ideal regulations, instead of absolute values (the strength or the mileage) as in the other two payment schemes. These philosophies correspond to two remuneration structures, e.g., availability and utilization40 or capacity and use12. None of the schemes is affected directly by variations in efficiency loss, which varies with turbine characteristics and operating points. It is up to the producers to reflect that in the clearing price. Wear, on the other hand, can be expected to correlate to mileage, and is hence influencing the mileage payment directly, whereas this factor is hidden in the clearing price in strength payment. Correlation between the burden and the remuneration is less regular under contribution payment, due to its high dependency on physical features in the system and detailed settings of the remuneration scheme (e.g., the threshold of the effective regulation movements).
Our work could relatively quickly impact the operation of HPPs in existing power systems with increasing renewables penetration. In the US, the lack of proper incentives for PFC are discussed42, 44, and the value of hydropower to the grid is a subject gaining increased attention, where aging HPPs are expected to alter their performance in new and unknown ways15. For China's ongoing electricity market reforms, the lack of proper mechanisms for procuring ancillary services for VRE integration is a key issue currently and gets more and more attention13, 45, 46. Within the Nordic TSOs, further development of the current markets is necessary with the emerging challenges from growing disconnect between electricity supply and market demand4, 68. The value of this manuscript is thus its immediate applicability to entities with both hydro and non-hydro assets.
In this study, we build a bridge between technical operation and economic evaluation, as an initial step. Additional work on economic values would go a long way towards the ultimate goal: holistic quantification of the cost of frequency control. We hope that our work triggers greater attention to and participation in the study of hydropower regulation to produce an effective and efficient operation for balancing renewable power systems.
Methods
We clarify the scope of this study as follows. The only operational control approach assessed is PFC, and other operation cases (e.g., start-up, stopping, and secondary frequency control) are not considered. The burden (efficiency loss, wear, and fatigue) is investigated from a physical perspective. Further economic modeling to assess the gain or loss of profit from regulation is necessary in the future to fully characterize the effects of PFC on system economics. Only one single unit of a HPP is analyzed in the model, while the model can be conveniently extended to analyze multiple-unit scenario. All the variables in this paper are introduced in Nomenclature in Supplementary Note 2.
Numerical model
The numerical models built in this study are presented in Supplementary Note 3 (including Supplementary Fig. 1 to Supplementary Fig. 4 and Supplementary Table 1). Model development regarding the turbine characteristics is a key point in this study and is introduced in Supplementary Note 4 (including Supplementary Fig. 5 to Supplementary Fig. 8) based on data from two practical cases presented below. The model validation is conducted based on comparisons of measurements and simulations, as shown in Supplementary Note 5 (including Supplementary Fig. 9 to Supplementary Fig. 13). It should be noted that in this work, the floating dead-zone is applied to the runner control only; frequency dead-zone (dead-band) is not included according to the case in the Nordic power grid, while it is utilized in many other countries including the USA41 and China.
Practical cases: two HPPs
We use two Swedish HPPs (HPP 1 and HPP 2), owned by Vattenfall, the largest hydropower owner and operator in Sweden, as the engineering cases in this study. HPP 1 contains two generating units with Kaplan turbines, while HPP 2 has three units with Kaplan turbines. One unit of each HPP is taken as the study case. The basic information and parameter values of the two HPPs are shown in Supplementary Table 3 and Supplementary Table 4. The combinator table, implemented in the governor of the HPPs as a lookup table for determining the RB angle, is illustrated in Supplementary Fig. 16. Applying more than one engineering case is necessary for this study. The main reason is that the analysis and result of efficiency loss are highly dependent on the turbine unit characteristics, which vary significantly across different turbines.
Regulation strategies
We analyze the following operation strategies S1–S3 and an ideal case S0. (1) S1: normal PFC in which GV and RB regulate without any artificial filter (widely implemented); (2) S2: PFC with a floating dead-zone filter (0.03 pu) for reducing the movement of RBs; (3) S3: PFC with the RBs being totally fixed (no RB movements); and (4) S0: Normal PFC in an ideal on-cam condition. Now-a-days, the implementation of burden relief strategy (S2 and S3) is under discussion in industry27, to avoid the serious fatigue issue on the RB and the hub. For strategy S2, the performance can be altered by changing the setting of the filter, and in this study we only analyze one representative case of S2; also, the filter is: a floating dead-zone that can lead to overall good regulation performance31 but not yet implemented in power plants, instead of normal dead-zone that is widely used in the world, especially in Chinese HPPs. The ideal case S0 is unrealistic and only implemented to identify the off-cam loss in normal PFC. Detailed settings are in Supplementary Note 6.
Method of quantification
Here, we introduce the method of quantification of the burden and quality of regulation. We quantify various indicators through simulations (Fig. 2) under three governor parameter sets (i = 1, 2, 3 for Ep1–Ep3), seven operating points within the maximum efficiency range (n = 1, 2,…, 7) and four regulation strategies (j = 0, 1, 2, 3 for S0–S3) for two HPPs (k = 1, 2 for HPP1 and HPP2). The detailed settings of the corresponding simulations are found in Supplementary Note 6.
We simply present the influence mechanism of the governor parameters and the focus is on the droop (bp). For a PI (proportional-integral) controller with droop, the transfer function is
Here, Δy and Δf are the GVO deviation and frequency deviation from set-point value, respectively, and bp, Kp, and Ki are the governor parameters. The corresponding gain is
which has a highly positive relationship with the GV movement distance30 and the regulation mileage. Tf is the period of the frequency oscillation. Equation (2) also shows that if the period (Tf) is large enough, the gain approaches 1/bp. The value of 1/bp is regarded as the static gain in this study and it significantly affects the relative amount of strength payment.
Efficiency loss: We classify the loss into the following compositions (Supplementary Fig. 17). The loss in steady-state operation, −Δηst, is
A negative value of the efficiency change indicates an efficiency loss. The “pu” is short for per unit. The ηst is the on-cam steady-state efficiency that is a constant value taken from the interpolation, and it varies for different operating points. It is not within the interests of this study because it is not influenced by transients in regulation. Here we mainly analyze the extra efficiency loss due to regulation, which is given as
Here, the ηSj is the average value of the instantaneous efficiency during the operation period (one day in this study) under a specific strategy (Sj). More exactly, the efficiency loss in transient due to deviation from the set-point (on-cam) can be obtained as
The loss due to off-cam in normal PFC is achieved by the difference between ΔηS0 and ΔηS1. The extra loss due to off-cam condition under strategy S2 and S3 is the difference between ΔηS0 and ΔηS2, and the difference between ΔηS0 and ΔηS3, respectively.
Wear and fatigue: For quantifying the wear and fatigue of turbines, we use the following two indicators30, 31 for both GV and RB. The first is the movement distance that is the accumulated distance of movements of GV and RB31, as described in
Here, N is the total amount of samples and is means the sample number. y and a represent GVO and RBA, respectively. From the standpoint of tribology, there is a linear positive correlation between movement distance and material deterioration on bearings25. The second indicator is the movement amount that is the total amount of movements, corresponding to the amount of direction changes. A large amount of actuator movement leads to dynamic loads on the turbine runner22, 69, and it also implies a multitude of load cycles that might increase the structure fatigue.
On this stage, applying the two representative and concise indicators of wear and fatigue is beneficial to the applicability of the model and the framework, based on simplifications to some extent. Influence mechanisms of detailed patterns of the regulation movements on lifetime and maintenance period of hydropower units is of great importance for future work.
Regulation mileage: We introduce regulation mileage to quantify the amount of work hydropower units expend to follow a regulation signal. The regulation mileage is described in
Here, pm is the active power in per unit; Pm-rated is rated power of the Kaplan turbine, and its unit is MW.
Frequency quality: We apply the frequency quality31 to comprehensively reflect the regulation performance of the hydropower unit, instead of utilizing the response time70 or phase shift of the regulation power. As shown in the lower part of Fig. 2, the core idea is comparing the new frequency sequence of the power system under different regulation conditions, to examine whether the frequency quality is deteriorated (Supplementary Note 6). The frequency quality is evaluated through the mean value, standard deviation, and root mean square error (RMSE with respect to the rated frequency 50 Hz) of the frequency sequence. The RMSE is taken as the main indicator. This method examines the influence of the regulation from a single Kaplan unit on the frequency of the whole grid.
Regulation payment
In this study, we only consider relative values of payment. Clearing prices are not considered in the quantification. The time of commitment and determination of payments for the cases in different countries are introduced in Supplementary Note 7.
Strength payment Pstrength, inspired by SvK, is here computed as
Here SR is the regulation strength; Pstep is the increase in output power caused by a frequency step change that is selected as from 50 Hz to 49.9 Hz by SvK. SR-base is a base value for normalizing the payment, and here it is set to the regulation strength (41.08 MW/Hz in Supplementary Table 6) of the unit in HPP 1 under Ep1 and S1. The payment will depend on governor parameterization, turbine characteristics, burden relief strategy, and operating point. Note that equation (8) considers the available reserve since Pstep will be affected by operational limits. The real hourly compensation for PFC is determined by this measure multiplied by the clearing prize, which is set on a pay-as-bid market and is supposed to reflect the costs for reserving and delivering the service. A contract between SvK and pre-qualified producers state the factors that can motivate the bids, including efficiency losses, lost income due to non-optimal planning with respect to electricity market prices or spill, and equipment wear. The contract also allows for some profit margin and a risk margin motivated by e.g., failures and prognosis uncertainties. There is also a second part of the real compensation from SvK, intended to adjust the above with respect to the extra energy spent or saved when delivering the service. The money related to the adjustment can hence go either way. This part, even though it depends on the actual operation, is omitted in this study, since its magnitude is considerably smaller than the strength payment part, and since its outcome is mainly determined by the signed mean frequency deviation.
Mileage payment: Pmile, inspired by PJM, is based on the mileage in power output
MR-base is a base value for normalizing the payment, and here it is set to the regulation mileage (449.5 MW in Table 1) of the unit in HPP 1 under Ep1 and S1. The actual scheme used by PJM does not measure the output mileage, but rather the mileage of a control signal that is computed from frequency deviation and area control error and distributed by PJM. The actual scheme also scales the mileage by a performance score, depending on comparisons between the control signal and power output, rewarding precision, correlation, and a small delay. Regulation mileage and performance are then multiplied by a market-driven clearing price to set the total regulation compensation.
Contribution payment: Pcontrib., inspired by East China Energy Regulatory Bureau of National Energy Administration58, is introduced here. The core idea, as shown in Supplementary Fig. 20, is to compensate regulation performance of hydropower units based on a comparison between the actual amount of electrical energy used for PFC and an “ideal” value.
For an arbitrary regulation period, the energy that contributes to regulation is defined as
Here, Nstart and Nend indicate the sample number of the start and the end of a period, respectively, and pm-set is the set-point of power output, and pm,is is the turbine active power at timestep is. The value of ER can be demonstrated as the area of the gray region in Supplementary Fig. 20. The ideal value of the energy for regulation, ER-ideal, is described as
Here, the ideal power deviation for the regulation Δpm-ideal is defined according to the steady-state characteristics of governor speed droop, as shown below
As shown on the top axis of Supplementary Fig. 20, the whole evaluation period (i.e., one day in this paper) is divided into many regulation movement periods. A regulation movement period is defined as the time spent between two neighbor zero-crossing points of frequency deviation. For evaluating the regulation performance for a regulation period (regulation movement) j, the following two values are applied.
Ratio of contributed regulating energy is:
Score of regulation correctness is defined as:
The regulation performance of the whole period can be evaluated by two indicators of effective regulation movement: average ratio of contributed regulating energy (λR-avg) and the ratio of regulation correctness (λC) as shown below.
Here, NR is the total amount of effective regulation movements of which the value of ER-ideal of the movement exceeds 0.2 s (Supplementary Note 8 and Supplementary Fig. 20). More exactly, the payment scheme aims to focus on relatively large regulation movements by filtering the influence from small ones.
The final formula of contribution payment, Pcontrib., is
Here the component scalars are weighted as 80% and 20%, respectively. Pm-base is a base value for normalizing the payment, and here it is set to 42.19 MW for both HPPs to normalize the average payment of the unit in HPP 1 under Ep1 and S1 to 100.0 % (as in Table 1).
Data availability
The data that support the findings of this study are available from the corresponding author upon reasonable request.
Code availability
Relevant code may be rendered available from the corresponding author upon reasonable request.
References
Schiermeier, Q., Tollefson, J., Scully, T., Witze, A. & Morton, O. Electricity without carbon. Nature 454, 816–823 (2008).
Mitchell, C. Momentum is increasing towards a flexible electricity system based on renewables. Nat. Energ. 1, 15030 (2016).
Armstrong, R. C. et al. The frontiers of energy. Nat. Energ. 1, 15020 (2016).
Svenska kraftnät, Statnett, Fingrid & Energinet.dk. Challenges and Opportunities for the Nordic Power System (Svenska kraftnät, Statnett, Fingrid and Energinet.dk, 2016).
Brouwer, A. S., van den Broek, M., Seebregts, A. & Faaij, A. Operational flexibility and economics of power plants in future low-carbon power systems. Appl. Energ. 156, 107–128 (2015).
Elliott, D. A balancing act for renewables. Nat. Energ. 1, 15003 (2016).
Brouwer, A. S., van den Broek, M., Zappa, W., Turkenburg, W. C. & Faaij, A. Least-cost options for integrating intermittent renewables in low-carbon power systems. Appl. Energ. 161, 48–74 (2016).
Rintamäki, T., Siddiqui, A. S. & Salo, A. How much is enough? Optimal support payments in a renewable-rich power system. Energy 117, 300–313 (2016).
Olauson, J. et al. Net load variability in Nordic countries with a highly or fully renewable power system. Nat. Energ. 1, 16175 (2016).
Ørum, E. et al. Future system inertia. (ENTSO- E, Brussels, Belgium, 2015).
Heard, B. P., Brook, B. W., Wigley, T. M. L. & Bradshaw, C. J. A. Burden of proof: a comprehensive review of the feasibility of 100% renewable-electricity systems. Renew. Sust. Energ. Rev. 76, 1122–1133 (2017).
Raineri, R., Ríos, S. & Schiele, D. Technical and economic aspects of ancillary services markets in the electric power industry: an international comparison. Energ. Pol. 34, 1540–1555 (2006).
Zhang, S., Andrews-Speed, P. & Li, S. To what extent will China's ongoing electricity market reforms assist the integration of renewable energy? Energ. Pol. 114, 165–172 (2018).
Oak Ridge National Laboratory. Case Study: Hydropower Constraints on OSAGE and TAUM SAUK Facilities. (Oak Ridge National Laboratory, Oak Ridge, TN, 2012).
Electric Power Research Institute. Quantifying the Value of Hydropower in the Electric Grid: Final Report. Report No. 1023144 (Electric Power Research Institute Palo Alto, CA, 2013).
Koritarov, V. et al. Modeling and analysis of value of advanced pumped storage hydropower in the United States. (Argonne National Laboratory, Lemont, IL, 2014).
Førsund, F. R. & Hjalmarsson, L. Renewable energy expansion and the value of balance regulation power, 97–126 (Edward Elgar Publishing, Cheltenham, UK, 2011).
Water Power Technologies Office. Hydropower Vision: A new chapter for America's 1st renewable electricity source. (U.S. Department of Energy's Wind and Water Power Technologies Office, Washington DC, 2016).
Dorji, U. & Ghomashchi, R. Hydro turbine failure mechanisms: An overview. Eng. Fail. Anal. 44, 136–147 (2014).
Liu, X., Luo, Y. & Wang, Z. A review on fatigue damage mechanism in hydro turbines. Renew. Sust. Energ. Rev. 54, 1–14 (2016).
Seidel, U., Mende, C., Hübner, B., Weber, W. & Otto, A. Dynamic loads in Francis runners and their impact on fatigue life. In Proc. IOP Conference Series: Earth and Environmental Science Vol. 22 032054 (IOP Publishing, Bristol, UK, 2014).
Trivedi, C., Gandhi, B. & Michel, C. J. Effect of transients on Francis turbine runner life: a review. J. Hydraul. Res. 51, 121–132 (2013).
Huth, H.-J. Fatigue design of hydraulic turbine runners. (Norwegian University of Science and Technology, 2005).
Simmons, G. F. Journal bearing design, lubrication and operation for enhanced performance. (Luleå University of Technology, 2013).
Gawarkiewicz, R. & Wasilczuk, M. Wear measurements of self-lubricating bearing materials in small oscillatory movement. Wear 263, 458–462 (2007).
Doujak, E. Effects of increased solar and wind energy on hydro plant operation. Hydro Rev. Worldwide 2, 28–31 (2014).
Wurm, E. Consequences of primary control to the residual service life of Kaplan runners. in Russia Power 2013 & Hydrovision Russia 2013 (PennWell, Moscow, Russia, 2013).
Momcilovic, D., Odanovic, Z., Mitrovic, R., Atanasovska, I. & Vuherer, T. Failure analysis of hydraulic turbine shaft. Eng. Fail. Anal. 20, 54–66 (2012).
Amiri, K., Mulu, B., Cervantes, M. J. & Raisee, M. Effects of load variation on a Kaplan turbine runner. Int. J. Fluid Mach. Syst. 9, 182–193 (2016).
Yang, W. et al. Wear and tear on hydro power turbines–Influence from primary frequency control. Renew. Energ. 87, 88–95 (2016).
Yang, W. et al. Wear reduction for hydropower turbines considering frequency quality of power systems: a study on controller filters. IEEE Trans. Power Syst. 32, 1191–1201 (2017).
Electric Power Research Institute. Hydro Life Extension Modernization Guides - Volume 2: Hydromechanical Equipment. (Electric Power Research Institute, Palo alto, CA, 2000).
Liu, X., Luo, Y., Karney, B. W. & Wang, W. A selected literature review of efficiency improvements in hydraulic turbines. Renew. Sust. Energ. Rev. 51, 18–28 (2015).
Bortoni, E. C., Bastos, G. S., Abreu, T. M. & Kawkabani, B. Online optimal power distribution between units of a hydro power plant. Renew. Energ. 75, 30–36 (2015).
Soares, S. & Salmazo, C. T. Minimum loss predispatch model for hydroelectric power systems. IEEE Trans. Power Syst. 12, 1220–1228 (1997).
Arce, A., Ohishi, T. & Soares, S. Optimal dispatch of generating units of the Itaipú hydroelectric plant. IEEE Trans. Power Syst. 17, 154–158 (2002).
Siu, T. K., Nash, G. A. & Shawwash, Z. K. A practical hydro, dynamic unit commitment and loading model. IEEE Trans. Power Syst. 16, 301–306 (2001).
Ma, C., Wang, H. & Lian, J. Short-term electricity dispatch optimization of Ertan hydropower plant based on data by field tests. J. Renew. Sustain. Energ. 3, 063109 (2011).
Dal’Santo, T. & Costa, A. S. Hydroelectric unit commitment for power plants composed of distinct groups of generating units. Electr. Power Syst. Res 137, 16–25 (2016).
Rebours, Y. G., Kirschen, D. S., Trotignon, M. & Rossignol, S. A survey of frequency and voltage control ancillary services—part II: economic features. IEEE Trans. Power Syst. 22, 358–366 (2007).
Rebours, Y. G., Kirschen, D. S., Trotignon, M. & Rossignol, S. A survey of frequency and voltage control ancillary services—part I: technical Features. IEEE Trans. Power Syst. 22, 350–357 (2007).
Ela, E., Tuohy, A., Milligan, M., Kirby, B. & Brooks, D. Alternative approaches for incentivizing the frequency responsive reserve ancillary service. Elec. J. 25, 88–102 (2012).
Ela, E. et al. Market designs for the primary frequency response ancillary service—Part II: case studies. IEEE Trans. Power Syst. 29, 432–440 (2014).
Ela, E. et al. Market designs for the primary frequency response ancillary service—Part I: motivation and design. IEEE Trans. Power Syst. 29, 421–431 (2014).
Ming, Z., Liu, X. & Peng, L. The ancillary services in China: an overview and key issues. Renew. Sust. Energ. Rev. 36, 83–90 (2014).
Pollitt, Yang & Chen. Reforming the chinese electricity supply sector: lessons from international experience. Cambridge Working Papers in Economics (University of Cambridge, Cambridge, 2017).
de Boer, H. S. H. S. & van Vuuren, D. D. P. Representation of variable renewable energy sources in TIMER, an aggregated energy system simulation model. Energ. Econ. 64, 600–611 (2017).
Deason, W. Comparison of 100% renewable energy system scenarios with a focus on flexibility and cost. Renew. Sust. Energ. Rev. 82, 3168–3178 (2018).
Oak Ridge National Laboratory. 2017 Hydropower Market Report. (U.S. Department of Energy Water Power Technologies, Washington, DC 2018).
March. P. Flexible Operation of Hydropower Plants. Report No. 3002011185 (Electric Power Research Institute, Palo Alto, CA, 2017).
Genoese, F., Genoese, M. & Wietschel, M. Occurrence of negative prices on the German spot market for electricity and their influence on balancing power markets. In Proc. 7th International Conference on the European Energy Market (IEEE, Madrid, Spain, 2010).
Mulu, B. G., Jonsson, P. P. & Cervantes, M. J. Experimental investigation of a Kaplan draft tube–Part I: Best efficiency point. Appl. Energ. 93, 695–706 (2012).
Jonsson, P. P., Mulu, B. G. & Cervantes, M. J. Experimental investigation of a Kaplan draft tube–Part II: Off-design conditions. Appl. Energ. 94, 71–83 (2012).
Schniter, P. & Wozniak, L. Efficiency based optimal control of Kaplan hydrogenerators. IEEE Trans. Energ. Convers. 10, 348–353 (1995).
Atta, K. T., Johansson, A., Cervantes, M. J. & Gustafsson, T. Phasor extremum seeking and its application in kaplan turbine control. In Proc 2014 IEEE Conference on Control Applications (CCA), Part of 2014 IEEE Multi-conference on Systems and Control 298-303 (IEEE, Antibes, France, 2014).
Mesa Associates, Inc. & Oak Ridge National Laboratory. Best Practice Catalog Propeller-Kaplan Turbine. (U.S. Department Of Energy, Washington DC, 2011).
Cost Development Subcommittee. PJM Manual 15: Cost Development Guidelines. (PJM Interconnection, Pennsylvania, 2016).
Shanghai Economic and Information Technology Commission. Assessment method for grid connected operation of power plants in Shanghai power grid (in Chinese), East China Energy Regulatory Bureau of National Energy Administration, http://www.sheitc.gov.cn/jjyx/676374.htm. (2018).
Söder, L. Simplified analysis of balancing challenges in sustainable and smart energy systems with 100% renewable power supply. WIREs Energ. Environ. 5, 401–412 (2016).
Schäfer, B., & Beck, C., & Aihara, K., & Witthaut, D., & Timme, M. Non-Gaussian power grid frequency fluctuations characterized by Lévy-stable laws and superstatistics. Nat. Energy 3, 119–126 (2018).
Widén, J. et al. Variability assessment and forecasting of renewables: a review for solar, wind, wave and tidal resources. Renew. Sust. Energ. Rev. 44, 356–375 (2015).
Graabak, I. & Korpås, M. Variability characteristics of european wind and solar power resources—a review. Energies 9, 449 (2016).
Graabak, I. & Korpås, M. Balancing of variable wind and solar production in continental europe with nordic hydropower – a review of simulation studies. Energ. Procedia 87, 91–99 (2016).
Graabak, I., Jaehnert, S., Korpås, M. & Mo, B. Norway as a battery for the future european power system—impacts on the hydropower system. Energies 10, 2054 (2017).
Anvari, M. et al. Short term fluctuations of wind and solar power systems. New J. Phys. 18(2016).
Eftekharnejad, S., Vittal, V., Heydt, G. T., Keel, B. & Loehr, J. Impact of increased penetration of photovoltaic generation on power systems. IEEE Trans. Power Syst. 28, 893–901 (2013).
Domínguez-García, J. L., Gomis-Bellmunt, O., Bianchi, F. D. & Sumper, A. Power oscillation damping supported by wind power: a review. Renew. Sust. Energ. Rev. 16, 4994–5006 (2012).
Fortum Energy Review. Building an effcient Nordic power market. (Fortum, Finland, 2016).
Storli, P. & Nielsen, T. Dynamic load on a Francis turbine runner from simulations based on measurements. In Proc. IOP Conference Series: Earth and Environmental Science Vol. 22 032056 (IOP Publishing, Bristol, UK, 2014).
Yang, W., Yang, J., Guo, W. & Norrlund, P. Response time for primary frequency control of hydroelectric generating unit. Int. J. Elec. Power Energ. Syst. 74, 16–24 (2016).
Acknowledgements
The research presented was carried out as a part of "Swedish Hydropower Centre - SVC". SVC has been established by the Swedish Energy Agency, Elforsk and Svenska Kraftnät together with Luleå University of Technology, KTH Royal Institute of Technology, Chalmers University of Technology, and Uppsala University (www.svc.nu). The authors also acknowledge the China Scholarship Council (CSC), StandUp for Energy, and the support from the National Natural Science Foundation of China under Grant No. 51379158. This manuscript has been authored by UT-Battelle, LLC under Contract No. DE-AC05-00OR22725 with the U.S. Department of Energy. The United States Government retains and the publisher, by accepting the article for publication, acknowledges that the United States Government retains a non-exclusive, paid-up, irrevocable, worldwide license to publish or reproduce the published form of this manuscript, or allow others to do so, for United States Government purposes. The Department of Energy will provide public access to these results of federally sponsored research in accordance with the DOE Public Access Plan (http://energy.gov/downloads/doe-public-access-plan). The authors thank S. Signore for his help and insightful discussions.
Author information
Authors and Affiliations
Contributions
P.N., U.L., W.Y., and B.S. formulated the research question and the scope. W.Y., P.N., L.S., and J.Y. built the numerical model. P.N. and L.S. engaged in the on-site tests and processed the measured data. W.Y. conducted the simulations. W.Y., P.N., L.S., J.Y., and U.L. analyzed the results regarding technical aspects. W.Y., A.W, P.N., L.S., and B.S. performed the analysis regarding economic aspects. W.Y., P.N., and A.W. drafted the paper. All authors contributed to commenting and discussing the paper.
Corresponding author
Ethics declarations
Competing interests
The authors declare no competing interests.
Additional information
Publisher's note: Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
Electronic supplementary material
Rights and permissions
Open Access This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license, and indicate if changes were made. The images or other third party material in this article are included in the article’s Creative Commons license, unless indicated otherwise in a credit line to the material. If material is not included in the article’s Creative Commons license and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this license, visit http://creativecommons.org/licenses/by/4.0/.
About this article
Cite this article
Yang, W., Norrlund, P., Saarinen, L. et al. Burden on hydropower units for short-term balancing of renewable power systems. Nat Commun 9, 2633 (2018). https://doi.org/10.1038/s41467-018-05060-4
Received:
Accepted:
Published:
DOI: https://doi.org/10.1038/s41467-018-05060-4
This article is cited by
-
A novel design and analysis of hybrid fuzzy logic MPPT controller for solar PV system under partial shading conditions
Scientific Reports (2024)
-
New insights into dynamic instability regions of spillway radial gate owing to fluid-induced parametric oscillation
Nonlinear Dynamics (2023)
-
The albedo–climate penalty of hydropower reservoirs
Nature Energy (2021)
-
Sensitivity and stability analysis of a Kaplan turbine system considering synergistic regulation
Nonlinear Dynamics (2021)
-
Smart renewable electricity portfolios in West Africa
Nature Sustainability (2020)
Comments
By submitting a comment you agree to abide by our Terms and Community Guidelines. If you find something abusive or that does not comply with our terms or guidelines please flag it as inappropriate.