Introduction

Problems experienced in tunnel excavation in schists generally occur due to face sliding occurring in the tunnel face and failures in support systems due to squeezing in the excavated parts of the tunnel. When the problems that occur during the tunnel excavation are examined, it is seen that the face slips occur under the shallow cover, while both the face slides and the squeezing mechanism are effective under the high cover1. The compression mechanism is investigated in studies conducted on such weak grounds2,3,4,5. In these studies, it is essential to provide tunnel face and ceiling stability and active and passive support system approaches in order to prevent squeezing have been opened to discussion. In these approaches, Shubert6 suggested deformation gaps in support systems, while Hoek7,8 suggested that the TH type should be chosen as the sliding type of snap-on steel rib in tunnels. New Austrian Tunneling Method (NATM) in the design of the support system Rabcewicz9,10,11, Rabcewicz and Golser12, and Muller13 also proposed for squeezing ground. The basic principle in the NATM method is based on the principle of maximizing the bearing capacity of the soil by allowing deformations with a flexible outer arch principle. However, it has emerged that revisions are needed during the support design process according to the principle of a flexible outer arch, which is the basic philosophy of this method14,15,16. Aygar16 insisted that, in weak grounds and large-diameter tunnels, the need for rigid lining has emerged instead of the flexible outer belt principle. According to Kontogianni et al.17 stated that 50% of the deformations that occur are due to the time-dependent creep effect and face propagation. For squeezing ground, Jethwa2 emphasized that the support system pressure should be 2–3 times higher than the short-term support system pressure in his study in the Chhibro tunnel in the Himalayas. Malan and Basson18 stated that the squeezing mechanism increases with increasing depth and decreasing rock mass properties. Sing et al.19 defined the squeezing mechanism according to the NGI (Nowagin Geological Institute) system (Q). Hoek and Marinos3 and Jethwa et al.2 classified the compression mechanism according to the compressive strength of the rock mass and the in-situ stresses. Goel et al.20 determined the squeezing conditions according to the N (Rock Mass Number) coefficient and showed it graphically. According to Aydan et al.21, on the other hand, divided the compaction into 5 different categories and classified them according to the very squeezing ground from the nonsqueezing conditions.

As a common view in all studies2,3,20,21,22,23,24, they determined that the ceiling stability and face stability are critical in the tunnel face. Barla25 stated that compression is very important in the long term and that the support system design should be performed accordingly. On the other hand, Chern et al.26 also stated that stability problems are likely to be encountered when the strain exceeds 1%. Shrestha and Panthi27 analyzed plastic deformations in schist and mica ganys. Panthi28 indicates that plastic deformations in weak rocks occur when tangential stresses exceed rock strength. The tunnel excavation method is another important factor affecting tunnel design in compacted soils. Here, discussions continue on whether the excavation method in large-diameter tunnels is the classical tunneling method, gradual excavation (top heading, bench and invert), or the full section tunneling method29,30,31,32,33. In addition, support design principles are classified as active and passive approaches. What kind of support system design will be carried out in compacted soils is also a matter of discussion1,6,25. Aygar16 suggested the implementation of an active support system instead of a passive approach in large-diameter tunnels opened in squeezing ground and stated that the NATM principles should be revised.

As can be seen, the design of the support system is very important in tunnels exposed to squeezing on weak soils. Within the scope of this study, the problems and collapse section of the T6 tunnel excavated in the schists and under high overburden within the scope of the Bursa Yenişehir High Speed Railway Project is evaluated. It is explained whether the main cause of the collapse is due to the support system or the excavation methodology. Excavation methodology in squeezing ground is proposed and limitations is shown. For this purpose, 3D analyzes were performed with the Flac3d program, and the tunnel collapse section is modeled exactly according to the construction phase. By examining the deformations that occurred, the main cause of the collapse is revealed.

Tunnel specifications

The T6 tunnel is between km: 61 + 910.00 and Km: 64 + 350.00 within the scope of the Bursa Yenişehir High Speed Train Project, and its total length is 2440 m (Fig. 1). The tunnel overburden height is around 200 m maximum34. During the tunnel excavation, serious deformations were encountered between km: 62 + 822.00 and km: 63 + 026.00. Reprofiling and strengthening works were carried out continuously in these sections. The excavations in the top heading of the tunnel were completed, but the bench and invert excavations were not carried out in the 28 m section between km: 62 + 910 and km: 62 + 938. In this process, the deformations in the tunnel continued to increase at the junction points, and a collapse occurred at the junction of the tunnel and the tunnel was closed.

Figure 1
figure 1

Location map of the T6 tunnel (National Online Project, https://www.nationsonline.org/oneworld/map/turkey-map.htm) and its entry and exit portals on Google Earth view (the Google earth pro 7.3.4.6442 (64bit).

The Google Earth image of the tunnel route is given in Fig. 1. The tunnel is designed as a single tube, its height is 8.0 m and the excavation diameter is 13.5 m (Fig. 2). The T6 tunnel was designed according to the principles of the New Austrian Tunneling Method9,10,11,12,13.

Figure 2
figure 2

Typical cross-section of the T6 tunnel.

Geological and geotechnical conditions in T6 tunnel

Triassic Karatepe formation is encountered along the route. Considering the boreholes and geological mapping data, the section along the route passes through the Karatepe metasandstone-schists member and limestone unit, which consists of alternations of sandstone, metasandstone, shale, mudstone, metaconglomerate, limestone, tuff, agglomerate, and spilitic basalt. The geological profile is given in Fig. 3.

Figure 3
figure 3

T6 tunnel geological and geotechnical profile34.

The rock mass parameters determined for the schist unit in the tunnel are given in Table 1.

Table 1 Geotechnical parameters.

Problems encountered in the tunnel

During the tunnel excavation, deformations occurred in the tunnel continuously. As a result of the deformations, cracks in the shotcrete and ruptures in the bolts appeared. A continuous increase in deformations was observed during excavation in the tunnel (Fig. 4), and it was stabilized after the bench and invert excavations. At most points along the tunnel profile, deformations have penetrated the section (Fig. 5). The cross-section measurement is taken after the excavation completed.

Figure 4
figure 4

Deformation measurements were taken at km: 62 + 881.

Figure 5
figure 5

km: 62 + 832 deformation section (in m).

One of the biggest problems encountered in the tunnel face was the slides on the slickenside surfaces on the schists surface (Fig. 6). After the excavation, the stability of the face could not be ensured. This situation adversely affected the tunnel support systems. As can be seen from Fig. 6, the most important factor affecting the rock mass parameters is the predominance of slippery surfaces in the schists. This situation both caused problems in the stability of the face during the excavation and caused failures in the support systems due to squeezing in the long term.

Figure 6
figure 6

Tunnel face excavation view in the graphitic schist.

Tunnel excavation continued from both entrances. The tunnel excavation was completed up to km: 62 + 938 from the exit side and the bench excavations were completed up to km: 62 + 910 in the entrance section. The top heading of the 28 m section in between has also been excavated (Fig. 7). In addition, inner lining concrete has been completed from km: 63 + 026 at the tunnel exit to 62 + 762 from the tunnel entrance.

Figure 7
figure 7

Tunnel excavation situation.

After this stage, because of the extreme deformations experienced in the 28 m section that was not excavated, a collapse occurred in the tunnel, and this section of the tunnel was completely closed (Fig. 8).

Figure 8
figure 8

The tunnel collapsed section between km: 62 + 910 to 62 + 938.

Evaluation of tunnel squeezing conditions and tunnel behaviour

One of the biggest problems experienced in tunnels collapsed in schists is that it develops due to squeezing. For this reason, it is imperative to examine the squeezing situation in the design of tunnel support systems. The equations determined according to Sakurai5, Jethwa et al.2 and Hoek and Marinos3 are used to examine the compression situation.

Sakurai5 correlated the compressive strength of the rock mass with the strain in the tunnel to define compression.

Sakurai5, in his study, examined the squeezing conditions in different underground structures. Equation (1) has been proposed for the sections that require a special support system due to the encountered problems. Here, depending on the compressive strength of the rock mass, the parts under the curve drawn according to the strain do not require a special support system, while the sections above the line require a special support system.

Here, Sakurai5 proposed Eq. (1) to determine the strain.

$$\upvarepsilon_{{{\text{pc}}}} = {1}.0{73}\sigma_{{{\text{cm}}}}^{{ - 0.{318}}} .$$
(1)

The compressive strength (σcm) of the rock mass was 0.17 MPa and the Ɛpc value is calculated as 1.88.

In Fig. 9, the squeezing condition is below the critical line.

Figure 9
figure 9

Strain for different rock mass strengths5.

Jethwa et al.2, on the other hand, defined compression as depending on the Nc coefficient. Nc is given in Eq. (2).

$$Nc=\frac{{\sigma }_{\text{cm}}}{Po}=\frac{{\sigma }_{\text{cm}}}{\gamma \times h}.$$
(2)

σcm: uniaxial compressive strength of the rock mass, h: height, γ: unit weight.

The Nc value is calculated as 0.04. According to the Nc value, it shows a high compression status according to Table 2.

Table 2 Squeeing degree according to Jethwa et al.2.

Hoek and Marinos3 defined the degree of squeezing as similar to Jethwa et al.2, depending on the compressive strength of the rock mass and in-situ stress. The strain value is calculated based on these two values. Strain value (Ɛ) is given in Eq. (3).

$$\upvarepsilon = 0.{2} \times (\sigma_{{{\text{cm}}}} /{\text{p}}_{0} )^{{ - {2}}} .$$
(3)

The ε value is calculated as 133. In Fig. 10, the relationship between strain value and σcm/p0 is drawn. Here, the squeezing situation is determined as an extreme squeezing problem.

Figure 10
figure 10

Approximate relationship between strain and the degree of difficulty associated with tunnelling through squeezing rock. Note that this curve is for tunnels with no support3.

According to Hoek and Marinos3 he stated that there will be serious stability problems in the tunnel and said, “This is an extremely difficult three-dimensional problem for which no effective design methods are currently available. Most solutions are based on experience”.

Analytical solutions and tunnel support reaction curves

For the design of the support systems according to the squeezing problem in the tunnel, analytical solutions and the reaction curves of the support systems must be determined. Many researchers have carried out studies about this subject8,35,36,37,38.

It is considered to be homogeneous and under hydrostatic pressure in analytical solutions. The Mohr Coulomb criterion is used as the renewal criterion and the tunnel is assumed to be circular35. In Table 3, closed system equations are given.

Table 3 Closed form solution equation8,35.

The in-situ stress at 200 m overburden height is calculated as p0 = 0.022 × 200 = 4.4 MPa. If the compressive strength of the rock mass is σcm, it is 0.17 MPa, and the σcm/P0 ratio is 0.04. The displacement at the tunnel face is 41 cm and the plastic displacement around the tunnel is 2.69 m. Table 4 presents the summary table.

Table 4 Analytical solution results.

As can be seen, it is inevitable that tunnel stability cannot be achieved in the unsupported condition and serious face stability problems and deformations occurs. Many researchers have conducted studies to determine the deformations that occur in the tunnel39,40,41,42,43. Vlachopoulos and Diederichs43 equations (Eq. (14)) is used to determine the longitudinal dispaclacement profile along the tunnel. The longitudinal displacement profile for h = 200 m is given in Fig. 11.

$$u_{i} = \left\{ {\begin{array}{*{20}l} {u_{im} \cdot \left[ {\frac{{u_{if} }}{{u_{im} }} \cdot e^{{x/r_{0} }} } \right],} \hfill & {x < 0} \hfill \\ {u_{im} \cdot \left[ {\left( {\frac{{u_{im} }}{3}} \right)e^{{ - 0.15\left( {r_{pm} /r_{0} } \right)}} } \right],} \hfill & {x = 0} \hfill \\ {u_{im} \cdot \left[ {1 - \left( {1 - \frac{{u_{if} }}{{u_{im} }}} \right) \cdot e^{{\left( { - 3x/r_{0} } \right)/\left( {2r_{pm} /r_{0} } \right)}} } \right],} \hfill & {x > 0} \hfill \\ \end{array} } \right..$$
(14)
Figure 11
figure 11

Longitudinal displacement profil for h = 200 m.

In the unsupported condition, 41 cm deformation occurs in the tunnel face, while this value increases to 52 cm, 1 m behind the tunnel. 20 m behind the tunnel, the deformations go up to 1.77 m.

As can be seen, serious deformations occur both in the tunnel face and in the tunnel behind the tunnel under 200 m of overburden height.

It is extremely important to determine the ground reaction curve and support reaction curves for the design of the support system in tunnels. Here, it is extremely important for the stability of the tunnel to apply the support at the right time41,44,45,46,47.

So, the variation of the soil reaction curve (GRC) and the radius of the plastic zone is given in Fig. 12. Here, it is seen that the radius of the plastic zone and the soil reaction curve develop very rapidly.

Figure 12
figure 12

Longitudinal displacement profil for h = 200 m.

The C3 support system had to be revised after the severe deformations failures in the support systems in the tunnel. Details of this support system are given in Fig. 13 and in Table 5. In this section, the analyses will be made according to the given support system. As a support system, 40 cm C20/25 shotcrete, HEB 200 steel rib (75–100 cm spacing) 8–12 m long self-drilling drives, 9 m long 3.5″ diameter umbrella, temporary inverted, double layer wire mesh (Q589/443). In addition, to ensure tunnel face stability, 10 cm shotcrete and Q221/221 type mesh steel will be applied after each excavation in the tunnel face with 9 m long self-drilling bolts. The excavation carried out by keeping the distance between the tunnel top heading and bench excavations at a minimum distance (approximately 4.0 m).

Figure 13
figure 13

C3 support details.

Table 5 C3 support system details.

Support reaction curve and ground reaction curve were drawn for outer lining elements.

The analyses were carried out according to the principle of placing the support elements immediately by allowing minimum deformation in the tunnel face. In a sense, a rigid support is considered.

For tunnel support systems, the equations given according to Hoek and Brown7 and Hoek8 are used. Equations are given in Table 6.

Table 6 Support capacity equation7,8.

The support pressure, support stiffness and maximum displacement are given in Table 7.

Table 7 Outer lining and inner lining support system pressures.

The ground and support reaction curves are drawn with the RocSupport program. Maximum support pressure and stiffness values are given below.

$${\text{Max}}.{\text{outer lining support pressure}}:{\text{ P}}_{{{\text{outmax}}}} = {\text{ P}}_{{{\text{ssmax}}}} + {\text{P}}_{{{\text{scmax}}}} + {\text{P}}_{{{\text{sbmax}}}} = {1}.{192} + 0.{585} + 0.{373} = {2}.{\text{15 MPa}},$$
$${\text{Max}}.{\text{ stiffness}}:{\text{ K}}_{{{\text{outer}}}} = {\text{ K}}_{{{\text{sb}}}} + {\text{K}}_{{{\text{st}}}} + {\text{K}}_{{{\text{sc}}}} = {285}.{2} + {51}.0 + {27}.{74} = {363}.{\text{94 MPa}}/{\text{m}}.$$

The summary table of the analyses made for this section of the tunnel is presented in Table 8. Figure 14 presents the ground and support system reaction curves against the total external support pressure for the outer lining. As can be seen here, the safety factor is calculated as 1.92 and the convergence occurring in the tunnel is 2.36%.

Table 8 Summary of the analysis result.
Figure 14
figure 14

Outer lining ground and support reaction curves.

According to the analyses results, tunnel stability is ensured by the applied support systems. However, it is seen that the main reason for the collapse and occurred deformations is the excavation and support sequence could not be achieved in the real time. It is seen that deformations occurred due to the fact that the ring was not closed in the top heading excavations, which were kept for a long time. The resulting deformations increase rapidly and cause collapse.

3D numerical analyses

Flac3d48 program is used to model the deformation and collapse in the tunnel. These analyzes are carried out to see why the collapse occurred in the 28 m section between km: 62 + 910 and km: 62 + 938. Except for the section where the collapse occurred, the collapse did not occur even though the deformations were outside the tolerances. However, after the top heading was completed, a collapse occurred in the 28 m section where the bench and invert excavations were not completed. This shows us that if the ring is closed, there will be no problem.

During the modeling stages, the model is prepared by taking 148 m in the Y direction, 70 m in the X direction, and 200 m in the Z direction (Fig. 15). While the excavation stages are created in the model, excavation is carried out from both entrances. As in the field applications, the top heading, bench and invert excavations of the first 40 m of the entrance and exit sections (between 0–40 and 148–140 m) have been completed and the model has been entered by making the inner lining concrete (Fig. 16). The model is solved at this stage, and then the deformations are reset. In the next stages, the tunnel is excavated in the form of the top heading, the bench, and the invert, and the model is continued to be solved by making it from both entrances. Between km: 62 + 910 and km: 62 + 938, which is the area where the collapse occurred, only the top heading is excavated, and the bench and inverted excavations are not completed. In this case, the deformations in the tunnel are investigated. The model is solved in a total of 73 steps.

Figure 15
figure 15

Flac3d model.

Figure 16
figure 16

Excavation steps.

The parameters used in the model are given in Table 1. Flac3d program uses bulk modulus and shear modulus in solutions. The Bulk Modulus (K) value was calculated as 208 MPa and the shear modulus (G) value was calculated as 96 MPa. Mohr–Coulomb failure criterion was chosen in the analysis and the model was solved by the gravity method. The model is assumed to be symmetrical and only half of the tunnel is modeled. In the analyses, 40 cm C20/25 type shotcrete was defined in the model as a shell element, and 88.9 mm diameter and 9 m long umbrellas on the tunnel ceiling were defined as pile elements in the model. In addition, 9 m long bolts in the tunnel mirror were entered into the model as cable bolts. Both umbrella and cable bolts were applied during excavation phases in the model with a 4.5 m thrust (Fig. 17).

Figure 17
figure 17

Face bolts and umbrella systems in the top heading section.

The material parameters for shotcrete, cable bolt, and umbrella used in the model are presented in Tables 9, 10, and 11. 248,400 zone and 262,567 gridpoints, 3956 structural elements, and 2536 nodes are used in the model.

Table 9 Parameters used for shotcrete lining concrete.
Table 10 Parameters used for cable bolts.
Table 11 Parameters used for umbrellas.

Modeling stages are given in Table 12.

Table 12 Modelling stages.

Evaluation of analysis results

During the evaluation of the analysis results, it has been evaluated in four parts to see the interaction of the top heading, bench, and invert. In the first part, the section where the excavations continue consecutively from both faces of the tunnel is examined. This section includes 26 levels as given in Table 12. Until this stage, successive excavations between 60 and 66 m in the top heading, between 40 and 48 m in the bench, and between 36 and 44 m in the invert section are carried out from the tunnel excavation entrance side. In the exit face section, between 88 and 82 m in the top heading, between 108 and 100 m in the bench, and between 88 and 80 m in the invert section, excavations and supports are carried out consecutively.

Tunnel specifications” section, it covers stages 26 to 42. Here, only the top heading area is excavated, and the top heading excavation is completed. This section covers between 82 and 108 m.

In “Evaluation of tunnel squeezing conditions and tunnel behaviour” section, excavations between 80 and 88 and 48 and 60 m are excavated on the bench in accordance with the current situation in the excavation phase in the tunnel. At this stage, the 28 m section in the bench is not excavated. This situation represents the pre-collapse situation in the tunnel.

In “Analytical solutions and tunnel support reaction curves” section, the tunnel invert concrete is completed and then the bench excavations between 60 and 88 m are completed in both directions of progress and the status of the tunnel being completed is examined.

Evaluation of the section  1 analysis

In these stages, the tunnel is excavated in the top heading, bench, and inverted form, and the ring is immediately closed (Fig. 18). Deformation values in consecutive excavations are given in Figs. 19, 20 and 21.

Figure 18
figure 18

Tunnel excavation situation after stage 26.

Figure 19
figure 19

Z displacement in stage 26.

Figure 20
figure 20

X displacement in stage 26.

Figure 21
figure 21

Y displacement in stage 26.

In this case, vertical deformations in the tunnel (in the Z direction) occurred at the level of 11 cm. In the top heading, a displacement of 17.5 cm occurred in the form of a squeezing at the base part (Fig. 19). In the region where the inner lining of the tunnel is completed, deformations are observed at the level of 11 cm. This section, where the inner lining is completed, is 26 m away from the tunnel face. In a sense, deformations in the 2D distance (tunnel diameter 13 m) behind the tunnel face showed their effect. Theoretically, the impact distance of the tunnel excavation is suitable for 2D. If the inner lining concrete is to be constructed at a 2D distance from the tunnel face, it should be constructed in such a way as to bear these deformations and stresses that occur due to the tunnel excavation.

Similarly, closure is observed at the level of 13 cm in the horizontal (in the X direction) (Fig. 20). It is seen that these deformations are concentrated 10 m behind the tunnel face. Horizontal deformations are reduced and stabilized behind the 2D distance of the tunnel. In a sense, closing the ring 2D behind the tunnel diameter resets the horizontal deformations.

The deformations in the tunnel face towards the tunnel excavation direction occurred at a maximum level of 17 cm (Fig. 21). These values occurred in the edge sections of the model and stabilized in the middle measurement of the tunnel face. It is observed that the forepolings and face bolts are sufficient.

Evaluation section 2 analysis

In this part of the analysis, only the top heading of the tunnel is excavated, and the top heading of the tunnel is opened (Fig. 22). In this section, it is aimed to examine the stability of the tunnel without closing the ring, that is, without the bench and invert excavations. As seen in Table 12 during the modeling stages, these excavations are completed at stage 42.

Figure 22
figure 22

Tunnel excavation situation after stage 42.

When the deformations occurring in the top heading of the tunnel are examined, it is seen that the deformations in the vertical direction reach up to 43 cm. In the top hearing, it is determined that the deformations reached 50 cm in the form of swelling (Fig. 23). In a sense, it is seen that the tunnel has completely lost its stability and the supports have been yielded. Behind the tunnel, it is seen that the deformations do not increase, as the tunnel excavation has no effect on the inner lining concrete. In other words, it is understood that the deformations lose their effect in the section where the tunnel face excavation exceeds 2D.

Figure 23
figure 23

Z displacement in stage 42.

It is determined that the deformations in the tunnel reached up to 36 cm in the horizontal direction (in the X direction) (Fig. 24). It is observed that these deformations are concentrated at the intersection of the top heading and the bench and continued throughout the top heading.

Figure 24
figure 24

X displacement in stage 42.

Evaluation of section 3

In the third stage, the situation in which the excavation of the bench excavation is examined. This situation represents the situation at the collapse point of the tunnel. In this section, the tunnel is formed in a 28 m section as the unexcavated distance in the top heading (Fig. 25). For this case, excavations are carried out between 80 and 88 m and 48 and 60 m in the benches.

Figure 25
figure 25

Tunnel excavation situation after stage 53.

As the excavation stage, the excavation process is terminated in 53 stages (Table 12). It is observed that the deformations occurring in the vertical direction in the tunnel increased with the excavations in the bench, and deformations up to 50 cm occurred in both the ceiling section and the top heading section. In a sense, up to 1.0 m of closure has occurred (Fig. 26). On the side walls of the tunnel, the deformations in the X direction reached 40 cm. In other words, after the excavations in the top heading, along with the excavations in the bench, the deformations in the X direction increased by 4 cm in total (Fig. 27).

Figure 26
figure 26

Z displacement in stage 53.

Figure 27
figure 27

X displacement in stage 53.

Evaluation of section 4

In this part of the analysis, the situation in which the bench of the tunnel is excavated examined and analyzes are performed with the final finished state of the tunnel (Fig. 28).

Figure 28
figure 28

Tunnel excavation situation after stage 74.

In theanalysis, it is seen that the deformations in the vertical direction (Z direction) in the tunnel increase up to 52.4 cm. In the base part, squeezing deformations up to 46 cm were formed (Fig. 29). With the deformations occurring in the horizontal direction (X direction) in the tunnel, closure up to 44 cm occurs (Fig. 30) In this case, after the completion of the excavation in the top heading of the tunnel (stage 53), there is a displacement of 4 cm with the excavations on the bench. As can be seen here, the main deformations occur only in the upper half of the tunnel without the lower half excavation, that is, without closing the ring. While the deformations that occurred at stage 26, where gradual excavation is carried out, were 13 cm, it increased to 40 cm in the case of excavation only in the top heading (stage 42). Deformations increase 3 times.

Figure 29
figure 29

Z displacement in stage 74.

Figure 30
figure 30

X displacement in stage 74.

Conclusion

3D numerical analyzes are performed for the T6 tunnel. In the analysis, the existing collapsed section is modeled according to the support systems applied in the field.

In the analysis, it has been seen that it is appropriate to perform the sequential excavation in the form of the tunnel top heading, bench, and invert.

It is determined that the deformations increased 3 times in cases where the excavation is only performed in the top heading. In this case, it is determined that the support systems in the tunnel were yielded and the deformations increased to 40 cm in the top heading side walls and invert section. It is revealed in the analysis that the total closure that occurred reached 80 cm.

It has been determined that the squeezing mechanism causes serious problems in tunnels excavated on weak grounds, especially in schists. In these cases, the ring should be closed after 30 m behind the face. The inner lining concrete should be considered as a load-bearing element. Otherwise, the outer lining starts to yield in the long term. It has been determined that keeping a minimum distance between the top heading, bench and invert excavations is extremely important for the stability of the tunnel.

Tunnel excavation should be completed as soon as possible in weak grounds excavated under high overburden such as schists. Excavations and support systems should not be interrupted.

Possible face slidings on the slickenside surfaces in the schists unit are extremely important for tunnel stability. In these cases, excavation should be performed by soil nails to the tunnel face and an umbrella to the ceiling cut.