This study investigates multiple types of water resources in the western mining area in China, their supply-demand balance by using the same dimension gray recurrence dynamic model GM (1, 1), and water content coefficients of mines to ease water supply-demand contradiction. A multi-objective programming model is proposed for optimal water resources allocation management. Optimal technical schemes for water resources allocation among different users are obtained. The optimization model improves upon the previous studies by using water demand and water supply forecast. Coordinated development for mining safety, mine water utilization, and remediation and control of water environment is achieved.
Similar content being viewed by others
Introduction
China’s water resources are relatively scarce, in general, and water resources per capita are only a quarter of the world’s average1,2,3,4. Water resource problems are more prominent in the arid and semi-arid areas in northern China5,6,7,8, where most of coal mines of China are located9,10,11. Moreover, coal mining causes serious groundwater losses, which exacerbates the contradiction between water shortages and socio-economic development12,13,14,15,16,17. The biggest difference between water resource utilization and management in coal mining area and other region is that the supply of water resources for coal mining area is severely affected by coal mining and the mine draining, which could change water circulation system by the following aspects: changing the transformation relation between surface water and groundwater, accelerating the infiltration rate of rainfall and surface water, reducing evaporation and complicating water circulation18. Water resources protection and management are urgently needed for dealing with the contradiction between water supply and demand in coal mines in northern China19,20,21,22.
Protection of water resources in the processes of coal mining includes mainly three methods for achieving effective utilization of mine water: water conservation mining, underground reservoir storing, and simultaneous exploitation of coal and groundwater as resources. These methods have been widely applied for mine water utilization in coal mines in northern China23,24,25,26, including water conservation mining in Shennan Mining Area, Shaanxi27, underground reservoir construction and mine water utilization in Daliuta coal mine, Shaanxi28, and simultaneous exploitation of coal and groundwater in Lu’an coalfield, Shanxi29. These different methods were developed based on different geological and hydrogeological conditions of the different coal mines.
The optimal management technique has been widely used in many fields, such as engineering management and decision-making30,31, and it has been applied for water resources management in coal mines in the past two decades, but, recently it shifted from solely relying on water supply to paying attention to increasing water supply, saving water resources, and managing water demand, as well as from single objective to multiple objective management32,33,34,35,36. Many places in China have conducted the related study with various techniques of water resources utilization to ease the contradiction between supply and demand and solve drought emergency problems37,38,39,40,41. The multi-objective decision management model has been initialized to model and optimize future water resources utilization35,42,43, since this method can build a model of regional multi-objective optimal allocation of water resources with considering the factors such as economy, society, and environment, which reflects the principles of fairness, priority, efficiency and comprehensive benefits. Also, it is useful for enhancing the economic and social benefit and ecological environment protection44,45. For examples, Wu (1995) derived a comprehensive theory of mine water utilization, named “balance of drainage and water-supply for environmental protection”, which was successfully applied in Jiaozuo coal mine in China46. Management of mine water resources in the mine areas currently mainly focuses on multi-objective decision-making, while direct forecast of water demand and mine water drainage (which was routinely used many years ago) are insufficient for multi-objective optimal management of water resources in coal mines47,48. This study uses the Dongsheng coal mining area as an example to derive the multi-objective model for water resources optimal management in coal mines in northern China.
The Dongsheng mining area, located near the contiguous zone in the north of Shaanxi Loess Plateau and southeast of Maowusu desert, is one of the world-class coal production bases in China. Continuous increasing of development scale of coal resources in this area has caused the changes of aquifer structure and conditions of groundwater recharge, flow and discharge, which in turn results in significantly declined water levels, dry aquifers, reduced or even disappeared flow of some springs49. These are due to decreased precipitation and increased mine drainage and water consumption of agriculture and industry every year. All of them lead to the contradiction among the water demand increase of the coal industry and other energy and chemical industries, the shortage of regional water resources, and protection of eco-environment in the mining areas50. Therefore, the study on water resources protection and optimal management is of vital importance for the sustainable use of water resources and balance environmental protection and industrial development in these regions.
In this study, a multi-objective optimization management model is developed to obtain optimal solutions for water resources utilization constrained by quantities of surface water, groundwater, and mine water in Dongsheng mining area. It is of great significance for rational development, comprehensive utilization and scientific management of water resources in the study area. The results are helpful for providing references for water resources protection and management in coal mine areas in the arid or semi-arid zones.
Material and Methods
Study area
The study region, Dongsheng mining area, has an area of over 500 square kilometers (Fig. 1), where three kinds of water resources are available, including surface water, groundwater, and mine water. Surface water includes the Wulanmulun river, lakes, reservoirs, ponds, and some other surface water bodies. Mine water includes mine water drainage from mines Daliuta, Huojitu, Shangwan, Bulainta, Halagou, Shigetai, and Wulanmulun.
Multi-objective optimization model
The multi-objective optimization model aims to systematically consider water sources allocation, including water quantity, water quality, and the characteristics of main water users, to achieve the highest water supply guarantee rate and the lowest cost of water supply. The decision variables are the supplied water amounts from various water sources to different water users in different sub-regions.
The study area is divided into eight sub-regions, including Daliuta, Bulianta, Shangwan, supply system of coal liquefaction, Halagou, Wulanmulun, Shigetai, and Huojitu. The water users include production, living, industry, and virescence. The water sources include tap water, industrial reuse water, and virescence recycled water. The number of decision variables in the study area is 96 (8 × 4 × 3). The multi-objective optimization model of water resources in the mining area has two objective functions.
Objective 1: to meet the maximum water-supply needs of each sub-region.
Objective 2: to minimize the total water supply cost in the study area.
where f1(x) is water supply amount in the study area; f2(x)is the total water supply cost in the study area; xijk is the amounts of water supply from water source i to user j in sub-region k; αj is the cost coefficient of unit water supply from water source j; i is index for the number of water source types (i = 1, 2, 3); j is index for the number of water user types (j = 1, 2, 3, 4); and k is index for the number of the sub-region (k = 1, 2, …, 8).
Constraint conditions are the law, rules, and regulations the model relies on when seeking the solution, only under the definite constraint conditions, the calculation results are effective. The present model has 5 constraints:
-
(a)
constraints of water demand
The largest supply of water should not be greater than 120% of water demand on the basis of meeting the needs of each user, in order to save water and reduce water supply costs. Water demand constraints include water demand constraints of production, living, industry, and virescence as follows:
$${Q}_{k-1}\le {x}_{11k}+{x}_{21k}\le 1.2\cdot {Q}_{k-1}$$(3)$${Q}_{k-2}\le {x}_{12k}\le 1.2\cdot {Q}_{k-2}$$(4)$${Q}_{k-4}\le {x}_{14k}+{x}_{24k}+{x}_{34k}\le 1.2\cdot {Q}_{k-4}$$(5)where Qk−1 is water demand for production; Qk−2 is water demand for living; Qk−4 is water demand of virescence.
-
(b)
constraints of water supply capacity of each sub-region
$$\sum _{k=1}^{8}\sum _{j=1}^{4}{x}_{1jk}\le {Q}_{T-W}+{Q}_{I-W}$$(6)$${x}_{21k}+{x}_{23k}+{x}_{24k}\le {Q}_{R-W}$$(7)$${x}_{34k}\le {Q}_{V-W}$$(8)where QT-W is water supply capacity of the tap water; QI-W is water supply capacity of each mine’s own independent water resource; QR-W is total water supply capacity of industrial reused water; QV-W is total water supply capacity of virescence recycled water.
-
(c)
constraints of water quality
Contaminants need to meet emission standards and cannot exceed the total emissions.
$${C}_{kj}^{r}\le {C}_{0}^{r}$$(9)$$\sum _{k=1}^{K}\sum _{j=1}^{J(k)}0.01{d}_{j}^{k}\,{p}_{j}^{k}\,(\sum _{i=1}^{I(k)}{x}_{ijk}+\sum _{c=1}^{I(k)}{x}_{cjk})\le {W}_{0}$$(10)where \({C}_{kj}^{r}\) is the concentration of pollutant r from user j in sub-region k; \({C}_{0}^{r}\) is the standard concentration of pollutant r for pollutant discharge; W0 is total permitted pollution discharge capacity.
-
(d)
non-negative constraints of decision variables
$${x}_{ijk}\ge 0$$(11)The decision variables involved in the optimation calculation, i.e., the water supply to different users in different subareas should be bigger or equal to zero.
-
(e)
zero constraints of decision variables
Following the standard of modeling and the principle of water supply by quality, formula (12) expresses that the reused water for afforestation is not used in production, livelihood, and industry, its corresponding variable is zero and not involved in the optimization calculation formula (13) expresses that the industrial reused water is not used in livelihood, its corresponding variable is zero and not involved in the optimization calculation.
According to the objective of the current project, this paper has chosen the tool fgoalattain in Matlab to solve the multi-objective problem. fgoalattain solves the multiobjective goal attainment problem, which is one formulation for minimizing a multiobjective optimization problem51:
where x, weight, goal, b, beq, lb, and ub are vectors, A and Aeq are matrices, and c(x), ceq(x), and F(x) are functions that return vectors. F(x), c(x), and ceq(x) can be nonlinear functions.
The formulations for multiobjective optimization have been fully discussed in the Standard Algorithms chapter for showing how to use Matlab optimization toolbox51,52,53,54.
Results
Mine Water Discharge at National Level
According to the data of National Bureau of Statistics in China, during the 10th to 12th “Five-Year National Plan” periods (from 2005 to 2020), national wastewater discharge amounts have grown linearly by 10 billion m3 per five-year. However, the growth of coal mine wastewater discharge amount has declined gradually, compared with the previous five-year plan (from 2001 to 2004). And the growth rate of coal mine wastewater discharge from the10th to 12th “Five-Year” has decreased by 169.2%, 32%, and 17.3%, respectively. At the same periods, the rate of national coal mine water utilization has increased by 35.2%, 59.2%, and 75.5%, respectively.
Water Resources Situation in the Study Region
There are rich coal resources but scarce water resources in northern China. With rapid social and economic development, regional conflicts between supply and demand of water resources have become increasingly prominent. The utilization of the available mine water includes simply mine water treatment and reuse for coal mining, which is far from the concept of coordinated development and optimal decision on environmental protection and utilization of mine water resources.
According to a field investigation conducted in October and December 200655, the amount of surface water resources is about 1.197 × 108 m3, including about 1.17 × 108 m3 of mean annual runoff of the Wulanmulun River. There are 47 surface water bodies including lakes, reservoirs, and ponds (Table 1), with a total water surface area of 5.91 × 105 m2 and a total surface water volume of 2.70 × 106 m3, in which the Wulanmulun lake is the largest one with a water surface area of 4.0 × 105 m2 and a volume of 2.2 × 106 m3.
The main recharges of groundwater in the study region are rainfall infiltration and lateral runoff, and the main discharges are spring discharge, coal mine water drainage and base outflow to the Wulanmulun river.
The balance equation in the study area during the balance duration (one year) is:
where Δε is the change amount of groundwater reserve; Qrf is the recharge amount from rainfall infiltration; Qlr is the amount of underground lateral runoff; Qspr is the amount of spring discharge; Qwi is the amount of coal mine water drainage; and Qbf is the amount of base outflow to the Wulanmulun river.
For the study of regional water balance, generally it is necessary to select a complete hydrological year as the balance period, and median water year is the best for the hydrological year56. Thus, 2004 (from 1975 to 2018) was selected to conduct the study of water balance with precipitation guarantee rate of 50%. It can be calculated from the above formulas that the total amounts of recharge, discharge, and the change in water storage volume are 80.8, 82.29, and minus 1.49 million m3 in this study area during the balance period, respectively (Table 2). The recharge amounts from the rainfall infiltration and the lateral runoff are 75.98 and 4.82 million m3, respectively. The spring drainage, the mine water drainage, and the base outflow to the Wulanmulun river are 33.27, 12.43, and 36.59 million m3, respectively (Table 2). Groundwater budget is negative balance in the first year of the balance period, with a reduced amount of groundwater storage of about 1.49 million m3.
The mine water drainage of these seven coal mines is 1470.50 m3/h and the total annual amount is 12.43 million m3 (Table 3), which are increasing year by year. In addition, the total surface water area in these seven mines is 130.63 million m2 and the total volume is 39.31 million m3. Therefore, the mine water resources have great potential to be exploited and utilized as an alternative water source.
According to the analysis above, the total volume of water resources of surface water and groundwater in the study region is 130.64 million m3, which was calculated by the sum of the amount of surface water resources (119.70 million m3) and groundwater resources (80.8 million m3) minus the amount of double-counting 69.86 million m3. The amount of double-counting contains spring discharge 33.27 million m3 and base outflow to Wulanmulun river 36.59 million m3 (Table 2).
Water Demand Prediction
The tap water and industrial recycled water demands in the following 15 years are forecasted by a same dimension gray recurrence dynamic model GM (1, 1), where the supply amount of tap water and industrial water during 2000–2004 is used as original data to simulate and predict future water demands, and to check the accuracy of GM (1, 1) model. The simulation results of current water consumption listed in Table 4 shows that the probability of small error, P is bigger than 0.95, the variance ratio, C is smaller than 0.35, indicating that the fitting accuracy meets the standard of class one57.
As shown in Table 5, both C (<0.35) and P (>0.95) of each year of the prediction meet the standard of class one. According to the principle of posterior error test, when the development grey number, a, of GM (1, 1) is smaller than 0.3, the model can be used in medium and long term prediction. Parameter a listed in Table 5 is all smaller than 0.1, which means that GM (1, 1) model has some practical value, and can be used in long-term prediction.
Demands of all kinds of water resources will increase from 4.86 × 104 m3/d in the first year (2005) of the balance period to 11.68 × 104 m3/d in 2020, in which tap water demand increases by 4.24 × 104 m3/d, and industrial recycled water demand increases by 1.86 × 104 m3/d (Fig. 2).
The water supply amount is predicted during the balance period, which increases from 8.33 × 104 m3/d in 2005 to 1.03 × 105 m3/d in 2010, then remains roughly constant at 1.03 × 105 m3/d from 2010 to 2015, and finally decreases to 9.93 × 104 m3/d in 2020 (Fig. 3). The predicted water supply yield rooted mainly in the “Eleventh Five Years Plan” and the Prospect Objective to 2020 of Coal Industry of Shendong Branch of China Shenhua Coal Group Corporation”. In terms of the proportion of water supply, the proportion of tap water supply will decrease from 71% in the first year to 56.8% in the fifteenth year, while the proportion of industrial recycled water supply will increase from 29.1% in the first year to 43.2% in the fifteenth year. Therefore, the results indicate that the utilization rate of mine water resource will increase in the future, which can not only alleviate the contradiction between supply and demand of water resources, but also save money and improve the enterprises’ economic and social benefit.
Water Yield of Mine Prediction
The mine water was predicted by using the water content coefficient of mine, one of the hydrogeological analogy methods58:
where Kp is the water content coefficient of mine; Q(t) is the mine water drainage quantity, and P(t) is the coal yield in the same period (usually a year). The prediction results of mine water are shown in Fig. 4, which indicates that mine water drainage will increase yearly in each mine of the Shendong mining area. The total drainage amount will increase from 4.39 × 104 m3/d in 2005 to 6.92 × 104 m3/d in 2020.
Optimal Allocation of Water Resources
In view of the water supply and demand conditions in Shendong mining area, a multi-objective decision analysis was conducted to deal with the contradiction of water use in each mine, and determine the optimal allocation of water resources.
The water supply in the study area is mainly composed of groundwater provided by the water source of each spring area, surface water; mine water and reuse water are provided by domestic sewage treatment plants. According to the current water use mode of the mining area and water quality, water resources are divided into tap water supply, industrial reuse water, and virescence recycled water. Among them, industrial reuse water is composed of mine water reuse water, mainly for industrial, production and other water sectors in the study area; virescence recycled water is composed of the treated domestic sewage from Daliuta and Heitagou domestic sewage treatment plants, Liuta and Huojitu underground water treatment plants for watering lawns and trees. The water quality was used to classify the water resources in this work.
In order to realize the full utilization of water resources and to achieve cost minimization on the basic of the water supply to meet the demand in the mining area, the priority sequence was carried out according to the users. In other words, the demand for production was given priority, followed by the demand for life, industry, and irrigation.
The water demand data of each user in the sub-district in 2008, 2010, 2015, 2020 and the water supply capacity data of each water source were brought into constraints of the previous section, and a constraint matrix was formed. Then, the constraint matrix was substituted in the multi-objective programming function fgoalattain of Matlab as a parameter. Finally, the results of multi-objective optimization of water resources of each user in 2008, 2010, 2015 and 2020 were calculated. By analyzing the results of 2008, 2010, 2015, 2020 optimization calculations, it can be concluded that the total water supply can meet the total water demand in 2008, 2010 and 2015, and the total water supply cannot meet the total water demand in 2020; a shortage of tap water could occur between 2015 and 2020, and the shortage of tap water increases yearly. If industrial reuse water all used up and 8853 m3/d of virescence recycled water would not be used, there would be a shortage of 2638 m3/d in tap water in 2015 and a total shortage of water supply is 17536 m3/d in 2020. If 7885 m3/d of virescence recycled water would not be used, there is a serious shortage of 25240 m3/d in tap water in 2020.
The solutions of multi-objective optimization model were obtained with acceptable tradeoff among the major variables. Due to the limitation of space, not all the results could be enumerated one by one. So, the result of Daliuta (k = 1) is listed in Table 6 as a representative. In general, the total water supply in 2008, 2010, 2015 and 2020 can meet the water demand of production, domestic, industry and virescence. In 2008, industrial reuse water can meet the requirements of production water demand in the case of non-use of tap water; all domestic water comes from tap water; if the mine does not use tap water, the remaining industrial reuse water can also fully meet the requirements of industrial water demand; all irrigation water comes from the use of the mine’s own virescence recycled water. In 2010, industrial reuse water can meet the requirements of production water demand, in the case of a small amount use of tap water; all domestic water comes from tap water; even if all the remaining industrial reuse water is used for industry, 5375 m3/d tap water is still needed to meet the industrial water demand; all irrigation water comes from the use of the mine’s own virescence recycled water. In 2015, industrial reuse water can meet the requirements of production water demand, in the case of a small amount use of tap water; all domestic water comes from tap water; even if all the remaining industrial reuse water is used for industry, 5348 m3/d tap water is still needed to meet the industrial water demand; all irrigation water comes from the use of the mine’s own virescence recycled water. In 2020, industrial reuse water can fully meet the requirements of production water demand; all domestic water comes from tap water; even if all the remaining industrial reuse water is used for industry, 6413 m3/d tap water is still needed to meet the industrial water demand; all irrigation water comes from the use of the mine’s own virescence recycled water.
Discussion and Conclusions
The work analyzed water resources situation in the study region, including the distribution of water resources, did regional groundwater balance calculation, used GM (1, 1) to predict water demands in the following 15 years, and build a multi-objective programming model for optimal water resources allocation management.
In general, national wastewater discharge amounts, coal mine discharge amount, production of coal, utilization amount of coal mine waste, and national rate of coal mine water utilization have linearly increased. The total volume of water resources is 130.64 million m3 in the study area, with the amounts of surface water, groundwater, and mine water of 119.7, 80.8, 12.43 million m3, respectively. By analysis of groundwater budget, water storage volume decreased by 1.49 million m3 in the balance zone during the balance period.
The tap water and industrial recycled water demands in the following 15 years are forecasted by a same dimension gray recurrence dynamic model GM (1, 1) (Fig. 2), where the supply amounts of tap water and industrial water are used as original data. Demands of all kinds of water resources will increase year by year, the total amount of water demand increases from 4.86 × 104 m3/d in the first year of balance duration (2005) to 11.68 × 104 m3/d in 2020, in which tap water demand increases by 4.24 × 104 m3/d, and industrial recycled water demand increases by 1.86 × 104 m3/d. All water demands including domestic, agriculture, industry and mine water consumption, are increasing year by year by a dynamic gray model GM (1, 1). The forecasted mine water drainage is increasing yearly on every mine in the Shendong area by using the hydrogeological analogy method, from 5.13 × 104 m3/d in the third year to 6.92 × 104 m3/d in the fifteenth year.
The optimal technical schemes among different users are acquired from all nine technical schemes through the application of a multi-objective programming model. The optimal technical schemes among different users are acquired from all nine technical schemes through the application of a multi-objective programming model. By analyzing the results of 2008, 2010, 2015, 2020 optimization calculations, it can be concluded that the total water supply can meet the total water demand in 2008, 2010 and 2015, and the total water supply can’t meet the total water demand in 2020; a shortage of tap water could occur in 2015 and 2020, and the shortage of tap water is increasing year by year. In general, the total water supply in 2008, 2010, 2015 and 2020 can meet the water demand of production, domestic, industry, and virescence.
References
Benedict, C. M. Water Resources in China. Phon (2012).
Wang, H. & You, J. Progress of water resources allocation during the past 30 years in China. Journal of Hydraulic Engineering 47, 265–271 (2016).
Liu, B., Speed, R., Sun, X. T., Speed, R. & Shen, D. J. Water resources management in the People’s Republic of China. International Journal of Water Resources Development 25, 193–208 (2009).
Shen, D. & Speed, R. Water Resources Allocation in the People’s Republic of China. International Journal of Water Resources Development 25, 209–225 (2009).
Gong, D., Shi, P. & Wang, J. Daily precipitation changes in the semi-arid region over northern China. J. Arid Environ. 59, 771–784 (2004).
Fang, Q. X. et al. Water resources and water use efficiency in the North China Plain: current status and agronomic management options. Agric. Water Manage. 97, 1102–1116 (2010).
Chen, Z., Nie, Z., Zhang, Z., Qi, J. & Nan, Y. Isotopes and Sustainability of Ground Water Resources, North China Plain. Ground Water 43, 485–493 (2005).
Currell, M. J., Han, D., Chen, Z. & Cartwright, I. Sustainability of groundwater usage in northern China: dependence on palaeowaters and effects on water quality, quantity and ecosystem health. Hydrological Processes 26, 4050–4066 (2012).
Han, W., Cherni, J. A. & Zhu, S. Coal mining in China: policy and environment under market reform. International Journal of Energy Sector Management 3, 9–28 (2009).
Shang, Y. et al. Balancing development of major coal bases with available water resources in China through 2020. Applied Energy 194, 735–750 (2016).
Wang, H. New Perspectives on Coal Resources Distribution Pattern and Its Fundamental Function in China. Coal Geology of China 30, 5–9 (2018).
Mamurekli, D. Environmental impacts of coal mining and coal utilization in the UK. Acta Montanistica Slovaca 15, 134–144 (2010).
Mensah, A. K. et al. Environmental Impacts of Mining: A Study of Mining Communities in Ghana. Appl. Phys. Lett. 65, 338–340 (2014).
Arkoc, O., Ucar, S. & Ozcan, C. Assessment of impact of coal mining on ground and surface waters in Tozaklı coal field, Kırklareli, northeast of Thrace, Turkey. Environmental Earth Sciences 75, 514 (2016).
Bukowski, P. Evaluation Of Water Hazard In Hard Coal Mines In Changing Conditions Of Functioning Of Mining Industry In Upper Silesian Coal Basin – USCB (Poland). Archives of Mining Sciences 60, 455–475 (2015).
Howladar, M. F. Coal mining impacts on water environs around the Barapukuria coal mining area, Dinajpur, Bangladesh. Environmental Earth Sciences 70, 215–226 (2013).
Tiwary, R. K. Environmental Impact of Coal Mining on Water Regime and Its Management. Water Air & Soil Pollution 132, 185–199 (2001).
Plotkin, S. E., Gold, H. & White, I. L. Water and energy in the western coal lands1. Jawra Journal of the American Water Resources Association 15, 94–107 (2010).
Bernhardi, L., Beroggi, G. E. G. & Moens, M. R. Sustainable water management through flexible method management. Water Resour. Manage. 14, 473–495 (2000).
Villar, P. C. & Ribeiro, W. C. The Agreement on the Guarani Aquifer: a new paradigm for transboundary groundwater management? Water International 36, 646–660 (2011).
Masters, B. Principles of Water Resources: History, Development, Management and Policy. Austral Ecol. 30, 488–488 (2005).
Bahir, M., Moukhayar, R. E., Youbi, N., Chamchati, H. & Jemaa, N. C. B. Management and protection of groundwater resources in semi-arid zones: application of hydrochemical methodologies to Essaouira Synclinal Basin, Morocco. J. Sol-Gel Sci. Technol. 29, 160–175 (2013).
Huang, Q. Simulation of clay aquifuge stability of water conservation mining in shallow-buried coal seam. Chinese Journal of Rock Mechanics & Engineering 28, 987–992 (2009).
Cui, F., Zhang, H. X., Liu, P. L. & Guo, A. G. Study on Water Conservation Mining with Aeolian Sand Paste Backfill in Coal Mine at Desert Border. Coal Science & Technology 48, 67–80 (2011).
Gu, D. Theory framework and technological system of coal mine underground reservoir. Journal of China Coal Society 40, 239–246 (2015).
D’Souza, G., Miller, D., Semmens, K. & Smith, D. Mine water aquaculture as an economic development strategy: linking coal mining, fish farming, water conservation and recreation. J. Appl. Aquacult. 15, 159–172 (2004).
Liu, S., Li, W., Wang, Q., He, J. & Xue, S. Water Inrush Risk zoning and Water Conservation Mining Technology in the Shennan Mining Area, Shaanxi, China. Arabian J. Sci. Eng. 43, 321–333 (2018).
Chen, S., Huang, Q. & Xue, G. Technology of underground reservoir construction and water resource utilization in Daliuta Coal Mine. Coal Science and Technology 44, 21–28 (2016).
Bai, H., Mao, X., Yao, B. & Tang, J. Research on simultaneous exploitation of coal and groundwater in Lu’an coalfield. Chinese Journal of Rock Mechanics and Engineering 28, 395–402 (2009).
Sharma, D. & Barakat, N. Evolutionary Bi-objective Optimization for Bulldozer and Its Blade in Soil Cutting. Journal of the Institution of Engineers, 1–16 (2018).
Alaghebandha, M., Hajipour, V. & Hemmati, M. Optimizing multi-objective sequencing problem in mixed-model assembly line on just-in-time: particle swarm optimization algorithm. International Journal of Management Science and Engineering Management 12, 288–298, https://doi.org/10.1080/17509653.2016.1258593 (2017).
Varis, O. & Vakkilainen, P. China’s 8 challenges to water resources management in the first quarter of the 21st Century. Geomorphology 41, 93–104 (2001).
Bizzi, S., Pianosi, F. & Soncini-Sessa, R. Valuing hydrological alteration in multi-objective water resources management. Journal of Hydrology s 472–473, 277–286 (2012).
Hipel, K. W. Multiple Objective Decision Making in Water Resources. Jawra Journal of the American Water Resources Association 28, 3–12 (2010).
Xevi, E. & Khan, S. A multi-objective optimisation approach to water management. J. Environ. Manage. 77, 269–277 (2005).
Fasakhodi, A. A., Nouri, S. H. & Amini, M. Water resources sustainability and optimal cropping pattern in farming systems; a multi-objective fractional goal programming approach. Water Resour. Manage. 24, 4639–4657 (2010).
Wu, Q., Zhou, W., Li, D., Di, Z. & Miao, Y. Management of karst water resources in mining area: dewatering in mines and demand for water supply in the Dongshan Mine of Taiyuan, Shanxi Province, North China. Environ. Geol. 50, 1107–1117 (2006).
Zhu, B. Management Strategy of Groundwater Resources and Recovery of Over-Extraction Drawdown Funnel in Huaibei City, China. Water Resour. Manage. 27, 3365–3385 (2013).
Liu, B. et al. The maize evapotranspiration in the background of climate change: a case study in arid area. Hydrological Processes 26, 633–639 (2012).
Xu, J., Hou, S., Xie, H., Lv, C. & Yao, L. Equilibrium approach towards water resource management and pollution control in coal chemical industrial park. J. Environ. Manage. 219, 56–73 (2018).
Xu, J., Ma, N. & Lv, C. Dynamic equilibrium strategy for drought emergency temporary water transfer and allocation management. Journal of Hydrology 539, 700–722 (2016).
Neuman, S. P. Calibration of distributed parameter groundwater flow models viewed as a multiple-objective decision process under uncertainty. Water Resour. Res. 9, 1006–1021 (1973).
Zarghami, M. Urban water management using fuzzy-probabilistic multi-objective programming with dynamic efficiency. Water Resour. Manage. 24, 4491–4504 (2010).
Zhang, L. & Gao, L. Study on optimal allocation of regional water resources under constraint of multi-objective. Journal of Water Resources & Water Engineering 25, 16–19 (2014).
Y., L. U., Wan, Z. & Hu, T. A bilevel multiobjective model of water resources optimal allocation. Engineering Journal of Wuhan University 44, 53–57 (2011).
Wu, Q., Jin, Y., Luo, Y., Xia, Y. & Li, D. Optimal management models for water drainage, water supply and environmental protection in coal mines in north China (in Chinese). Journal of China Coal Society 20, 95A–96A (1995).
Qu, J., Zhang, S. & Li, G. Study on Analysis of Water Resources Balance Based on Multi-objective Reclamation in Coal Mine Area. Chinese Agricultural Science Bulletin 27, 242–247 (2011).
Yin, S., Han, Y., Chang, H., Guo, J. & Zhang, X. Study on optimal allocation of karst water resources in Hanxing Mining Area (in Chinese). Coal Science & Technology 44, 29–34 (2016).
Ji, Y. Study on Comprehensive Utilization of Coal Mine Water Resources in the Coal Mine area of North Shaanxi. Ground Water 21, 84–86 (2009).
Jovanovic, N. Z. et al. Commercial production of crops irrigated with gypsiferous mine water. Water S. A. 28, 413–421 (2002).
Gembicki, F. Vector optimization for control with performance and parameter sensitivity indices, Ph. D. thesis, Case Western Reserve Univ (1974).
Brayton, R., Director, S., Hachtel, G. & Vidigal, L. A new algorithm for statistical circuit design based on quasi-newton methods and function splitting. IEEE Transactions on Circuits and Systems 26, 784–794 (1979).
Han, S.-P. A globally convergent method for nonlinear programming. Journal of optimization theory and applications 22, 297–309 (1977).
Grace, A. C. W. Computer-aided control system design using optimization methods, University of Wales, Bangor (1989).
Dong, S. Study on the Optimal Allocation of Water Resources Systems and the Comprehensive Utilization of Water Resources in Arid-Semiarid Multiple Mining Areas. Springer Theses (2016).
Allison, G. B., Gee, G. W. & Tyler, S. W. Vadose-Zone Techniques for Estimating Groundwater Recharge in Arid and Semiarid Regions. Soil Sci. Soc. Am. J. 58, 6–14 (1994).
Xiao, X., Hu, Y. & Guo, H. Modeling mechanism and extension of GM (1, 1). Journal of Systems Engineering and Electronics 24, 445–453 (2013).
Xue, Y. & Xie, C. Numerical method of hydrogeology. Beijing: China Coal Industry Publishing House (1980).
Acknowledgements
Thanks are given to the National Key R&D Program of China during the Thirteenth Five-year Plan Period (No. 2017YFC0804102), the National Science & Technology Pillar Program during the Twelfth Five-year Plan Period (No. 2012BAK04B04) and the Fundamental Research Funds for the Central Universities of China (No. 3142015019). The authors would like to thank the reviewers of this paper for their constructive comments.
Author information
Authors and Affiliations
Contributions
S.D. and S.Y. established the conceptual models, performed data analysis and wrote the draft manuscript. B.X. and Z.D. designed the inverse modeling simulations, performed data analysis, discussed the results and revised the manuscript. Y.H. and X.Z. discussed the results and revised the manuscript.
Corresponding author
Ethics declarations
Competing Interests
The authors declare no competing interests.
Additional information
Publisher’s note: Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
Rights and permissions
Open Access This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license, and indicate if changes were made. The images or other third party material in this article are included in the article’s Creative Commons license, unless indicated otherwise in a credit line to the material. If material is not included in the article’s Creative Commons license and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this license, visit http://creativecommons.org/licenses/by/4.0/.
About this article
Cite this article
Dong, S., Xu, B., Yin, S. et al. Water Resources Utilization and Protection in the Coal Mining Area of Northern China. Sci Rep 9, 1214 (2019). https://doi.org/10.1038/s41598-018-38148-4
Received:
Accepted:
Published:
DOI: https://doi.org/10.1038/s41598-018-38148-4
This article is cited by
-
Elaboration and application of the nested multi-coupling model test system for an artificial dam seepage simulation under combined action of dynamic and static loads
Geomechanics and Geophysics for Geo-Energy and Geo-Resources (2024)
-
Study of Roof Water Inrush Control Technology and Water Resources Utilization During Coal Mining in a Karst Area
Mine Water and the Environment (2023)
-
Exogenous melatonin reduces water deficit-induced oxidative stress and improves growth performance of Althaea rosea grown on coal mine spoils
Environmental Science and Pollution Research (2022)
-
Optimization of water resources utilization by GA–PSO in the Pinshuo open pit combined mining area, China
Environmental Earth Sciences (2022)
-
Associations of musculoskeletal disorders with occupational stress and mental health among coal miners in Xinjiang, China: a cross-sectional study
BMC Public Health (2021)
Comments
By submitting a comment you agree to abide by our Terms and Community Guidelines. If you find something abusive or that does not comply with our terms or guidelines please flag it as inappropriate.