Nature Energy 1, 16197 (2016); published 6 December 2016; corrected 23 January 2017.
In the version of this Research Highlight originally published, the image credit was missing. The image should have been credited to ollo/Getty Images. This error has been corrected in all versions of the Research Highlight.
Additional information
The online version of the original article can be found at 10.1038/nenergy.2016.197
Rights and permissions
About this article
Cite this article
Rubino, A. Correction: Capacity mechanisms: More flexibility reduces cost. Nat Energy 2, 17004 (2017). https://doi.org/10.1038/nenergy.2017.4
Published:
DOI: https://doi.org/10.1038/nenergy.2017.4