Skip to main content

Thank you for visiting nature.com. You are using a browser version with limited support for CSS. To obtain the best experience, we recommend you use a more up to date browser (or turn off compatibility mode in Internet Explorer). In the meantime, to ensure continued support, we are displaying the site without styles and JavaScript.

  • Article
  • Published:

Cost of Preventing Thames Tidal Flood

Abstract

Professor Schofield's appraisal of a recent Greater London Council report on ways of preventing the impending disaster in the flood plain of the River Thames includes the cost of risk of future loss. At present values, it appears economic to use sandbags immediately to raise the embankments.

This is a preview of subscription content, access via your institution

Access options

Buy this article

Prices may be subject to local taxes which are calculated during checkout

Similar content being viewed by others

References

  1. Thames Flood Prevention Barrier/Barrage Project, First Report of Studies (Greater London Council, 1969).

  2. Suthons, C. T., Proc. ICE, 25, 433 (August 1963).

    Google Scholar 

  3. Technical Possibilities of a Thames Flood Barrier, Cmnd 956 (HMSO, London, March 1960).

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

SCHOFIELD, A. Cost of Preventing Thames Tidal Flood. Nature 227, 1203–1204 (1970). https://doi.org/10.1038/2271203a0

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1038/2271203a0

Comments

By submitting a comment you agree to abide by our Terms and Community Guidelines. If you find something abusive or that does not comply with our terms or guidelines please flag it as inappropriate.

Search

Quick links

Nature Briefing

Sign up for the Nature Briefing newsletter — what matters in science, free to your inbox daily.

Get the most important science stories of the day, free in your inbox. Sign up for Nature Briefing