News | Published:

Compressed Air Locomotive used in the St. Gothard Tunnel Works1

Nature volume 13, pages 489491 | Download Citation

Subjects

Abstract

THE boring of a tunnel of any importance presents difficulties of various kinds, among which may be mentioned the clearing away of the rubbish arising from the excavation of the gallery, whenever that reaches any considerable length, and the work is carried on with activity. Such were the conditions under which the Boring of the Mont Cenis tunnel was carried on, and M. Fabre, the able contractor, has met with similar difficulties ini the iloiirig of the St. Gothard tunnel, how being carried out.

About this article

Publication history

Published

DOI

https://doi.org/10.1038/013489b0

Authors

    Comments

    By submitting a comment you agree to abide by our Terms and Community Guidelines. If you find something abusive or that does not comply with our terms or guidelines please flag it as inappropriate.

    Newsletter Get the most important science stories of the day, free in your inbox. Sign up for Nature Briefing